- This contract award, identified as W911PT20C0004, was made by the U.S. Army TACOM Life Cycle Management Command (TACOM) to Burlington Engineering Corporation, a for-profit manufacturer of specialized precision metalworking equipment and tooling based in Montpelier, Vermont. The $2,848,940.00 firm-fixed-price contract is for the delivery of an external cylindrical grinder to the Watervliet Arsenal in New York. This contract does not utilize any set-aside designation. Burlington Engineering...
- This federal contract award, valued at $1,578,970.00, was issued by the U.S. Army TACOM Life Cycle Management Command (TACOM) to Burlington Engineering Corporation, a for-profit manufacturer of specialized precision metalworking equipment and tooling based in Montpelier, Vermont. The contract is for the delivery of 1 each 4-axis lathe per the provided equipment engineering specification. The award does not utilize any set-aside designation. Burlington Engineering Corporation has established...
- The U.S. Army TACOM Life Cycle Management Command awarded a $315,440 firm fixed-price purchase order to Burlington Engineering Corporation, a small business manufacturer based in Montpelier, Vermont, on September 19, 2024. This contract modification extends the delivery date of the line item for one rotary grinder conforming to Watervliet Arsenal specification 12-24-3415, with an ultimate completion date of November 30, 2025. The contract is designated as a Total Small Business set-aside,...
- This is a definitive contract awarded by the Department of the Army Materiel Command TACOM Life Cycle Management Command to Burlington Engineering Corporation, a for-profit manufacturer of goods. The $1,092,000.00 firm fixed price contract is for the delivery of surface grinding equipment and related tooling to the Watervliet Arsenal in New York. The equipment provided under this award likely supports manufacturing and production operations at the Army facility. The contract has no set-aside...
- Burlington Engineering Corporation was awarded a firm fixed price purchase order valued at four million five hundred eighty-two thousand four hundred twenty dollars ($4,582,420) by the Department of the Army Materiel Command TACOM Life Cycle Management Command. The award is to procure two Tacchi brand hollow spindle lathes per Sources Sought notice 1-20-3416 to fulfill requirements outlined in Equipment Engineering Specification 5-15-3416 Revision I. Performance will occur in Italy with all...
- This is a $14,544,816.04 firm-fixed price definitive contract awarded by the U.S. Army TACOM Life Cycle Management Command to Burlington Engineering Corporation, a for-profit manufacturer of specialized precision metalworking equipment based in Montpelier, Vermont. The contract is for the procurement of a 26' single carriage CNC Tacchi lathe, which will be delivered to the Watervliet Arsenal in New York. This contract does not utilize any set-aside designations. Burlington Engineering...
- Burlington Engineering Corporation was awarded a definitive contract by the Department of the Army's Tank-Automotive and Armaments Command Life Cycle Management Command to procure one new six-axis computer numerical control broach grinding machine for Watervliet Arsenal in New York. Valued at $1,187,574, this firm fixed price contract has a period of performance through July 2023 to deliver the specialized precision metalworking equipment requested in the original solicitation. No set-aside...
- The Department of the Army Materiel Command TACOM Life Cycle Management Command awarded a $3,583,411.25 Firm Fixed Price definitive contract to Burlington Engineering Corporation, doing business as Burlington Engineering Corp., for the delivery of an Inside Diameter (I.D.) Grinder. The machine is required to grind the interior of 4340 alloy steel cannon tubes up to 13.5 inches in diameter and 40 feet in length for Watervliet Arsenal. The contract has no set-aside designation. Burlington...
- This federal contract award, valued at $1,135,250.00, was granted by the U.S. Army TACOM Life Cycle Management Command to Burlington Engineering Corporation, doing business as Burlington Engineering Corp, for the delivery of one large surface grinder per specification #15-23-34. The contract has a firm fixed price pricing type and an ultimate completion date of October 17, 2025. The original solicitation was a market survey conducted by the U.S. Army Contracting Command - Watervliet Arsenal to...
- This federal contract award, W911PT25P0012, was issued by the TACOM Life Cycle Management Command, a defense agency within the U.S. Army, to Burlington Engineering Corporation, a for-profit manufacturer of specialized precision metalworking equipment based in Montpelier, Vermont. The $12,704.00 firm fixed-price purchase order is for the delivery of 1 each telescopic waycover, PC1000 C10000C, tele part number: COPTE01061. The contract has no set-aside designation and has an ultimate completion...
This federal contract award to Burlington Engineering Corporation, doing business as Burlington Engineering Corp, is for the delivery of one vertical turning center per Equipment Engineering Specification 05-20-3416, Revision A dated September 16, 2021, with an option for one additional unit. The $2,603,900.00 fixed-price purchase order was awarded on March 7, 2022 by the U.S. Army Contracting Command - TACOM Life Cycle Management Command (TACOM LCMC) and has a completion date of December 31, 2023. The original solicitation was a market survey conducted by the U.S. Army Contracting Command - Watervliet Arsenal to identify potential sources for the manufacture of two 4-axis vertical turning centers to support production and overhaul work at Watervliet Arsenal. This procurement does not have a set-aside designation. Burlington Engineering Corp, a for-profit manufacturer of specialized precision metalworking equipment, was selected to fulfill this requirement based on their proven capabilities in providing advanced manufacturing systems to Department of Defense facilities.
Name | Description | Solicitation Number | FederalAgency | Type | PostedDate |
|---|---|---|---|---|---|
4-Axis Vertical Turning Centers | W911PT22P0064 | Department of the Army Materiel Command Contracting Command Detroit Arsenal | Award Notice 4/4 | 3/8/22, 8:24 AM | |
4-Axis Vertical Turning Centers | W911PT-21-Q-0037 | Department of the Army Materiel Command Contracting Command Detroit Arsenal | Pre-Solicitation 1/4 | 2/25/21, 2:59 PM | |
4-Axis Vertical Turning Centers | W911PT-21-Q-0037 | Department of the Army Materiel Command Contracting Command Detroit Arsenal | Solicitation 3/4 | 8/30/21, 5:10 PM | |
VERTICAL TURNING CENTERS | W911PT21Q0037 | Department of the Army Materiel Command Contracting Command Detroit Arsenal | Pre-Solicitation 2/4 | 4/1/21, 9:37 AM |
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| P00001 | Supplemental Agreement for work within scope | $20.9k | 7/12/23 | |
| Not listed | Not listed | $1.6m | 3/7/22 |