This sole-source, firm fixed price contract valued at $373,941.18 was awarded by the Department of the Air Force Materiel Command Oklahoma City Air Logistics Complex to Intercomp Co. to provide various load cell components in support of B-52 maintenance at Tinker Air Force Base. Per the solicitation, the Air Force Sustainment Center requires 132 each 1-inch diameter studs, 66 each 50,000-pound load cells, 66 each 10,000-pound load cells, six AC100 central processing units, and 132 load cell radio adapters. All components must integrate with Intercomp's AC100 CPU for the existing B-52 load cell system. Delivery within 60 days of order is required to support the 76th Aircraft Maintenance Group's Programmed Depot Maintenance for B-52 aircraft. Performance will be at Tinker Air Force Base through December 2020. No set-aside designation was applied.