Purchase Order 140P1318P0159

Award Date 8/30/18
Potential Completion Date 11/30/18
Potential Value $14K
Federal Agency
Intermountain Region
Federal Contract Vehicle
Set-Aside Type
Total Small Business
Extent Competed
Competed under SAP
Major Defense Program
Not listed
Pricing Type
Firm Fixed Price
Place of Performance
Watrous, NM 87753, USA
Solicitation Procedures
Simplified Acquisition
Number Of Offers Received
1
Legislative Mandate
Not listed
National Interest Action
Not listed
Research Type
Not listed
Primary Consortia Member
Not listed
Similar Awards
The Department of the Interior National Park Service Intermountain Region awarded a $668,679 firm fixed price delivery order to Northern Management Services Inc. to retrofit the visitor center at Fort Union National Monument in Watrous, New Mexico. The scope of work involves a complete interior building remodel, including preparation for acceptance, across two contract line items - design and construction. No subcontractors or set aside designations were identified. The project will support...
This federal contract was awarded by the Department of the Interior National Park Service Intermountain Region to All-Rite Construction, Inc., a small disadvantaged business and HUBZone firm based in Albuquerque, New Mexico. The $291,957.89 firm-fixed-price delivery order contract is for the rehabilitation and restoration of the exterior of three buildings located at Fort Union National Monument in Watrous, New Mexico. The primary work includes patching cracks, repairing and re-stuccoing...
The U.S. National Park Service awarded a $741,812.11 firm-fixed price construction contract to Hanson's Excavating, Inc., a self-certified small disadvantaged business, to complete wastewater system improvements at the Fort Union Trading Post National Historical Site in Williston, North Dakota. The 210-calendar day contract involves the construction of two duplex grinder pump lift stations, installation of new force mains, and a gravel-less leach bed drain field to service housing and visitor...
This is a fixed-price delivery order awarded by the Intermountain Region of the National Park Service, a civilian federal agency, to All-Rite Construction, Inc., an SBA-certified HUBZone and small disadvantaged business located in Albuquerque, New Mexico. The $85,100.15 contract is for the disconnection of a 50,000-gallon water tank from the potable water system at an unspecified location. The contract does not have a set-aside designation. All-Rite Construction holds two indefinite...
Orcom, A Division Of Ortega Companies, Inc. was awarded a $60,376 firm fixed price delivery order against the National Park Service Intermountain Region Multiple Award Task Order Contract 2021-2026 vehicle to replace roofing on two single-story structures within El Malpais National Monument. The work includes removal and replacement of existing roofing materials for the fire cache and Bally buildings located in Grants, New Mexico. Funding is provided by the Department of the Interior National...
This is a $4,617,780.00 Firm Fixed Price contract awarded by the Federal Highway Administration (FHWA), a civilian agency, to AUI Inc., a heavy civil and utility construction company based in Albuquerque, New Mexico. The contract is for the reconstruction of the Catwalk Trail in the Gila National Forest in New Mexico. The work includes replacing culverts, removing structures and obstructions, excavation, installing aggregate base and asphalt pavement, placing structural concrete, installing...
The Department of the Interior National Park Service Intermountain Region awarded a $100,338.13 firm fixed price delivery order to All-Rite Construction, Inc. to replace approximately 20 glazing units on the historic 1961 Mission 66 Visitor Center in Grants, New Mexico. The primary scope of work under the contract is removal and replacement of windows on the building to preserve the historic property located within El Morro National Monument. Funding comes from the National Park Service's...
The Department of the Interior National Park Service Intermountain Region awarded a $86,018 firm fixed price delivery order contract to All-Rite Construction, Inc. to replace the exterior sidewalks and a water valve at Bandaliar National Monument in Los Alamos, New Mexico. The work will be performed between August 11, 2022 and November 11, 2022 to support infrastructure improvements at the national park site. No subcontractors or set aside designations were identified. The award was issued under...
<p>The Department of the Interior National Park Service Intermountain Region awarded a $284,078.14 firm fixed price delivery order contract to All-Rite Construction, Inc. to demolish and replace approximately 10,000 square feet of concrete sidewalk at White Sands National Park Visitor Center in Alamogordo, New Mexico. The work will restore the sidewalks and meet Architectural Barriers Act accessibility standards, starting on September 19, 2022 and concluding by March 3, 2023.</p>
This is a firm-fixed-price purchase order contract awarded by the U.S. Department of Agriculture's Forest Service, Region 4 - Intermountain Region, to CXT Inc., a division of L.B. Foster Company's Foster Piling Division. The contract is for the purchase and installation of a Gunnison-style (brand name or equal) left-hand screen, precast toilet building with a Nuss Brown color, Barnwood wall texture, and a standard Cedar Shake roof. The toilet building is to be installed at the Castle Valley...

X:NOGRN, FORT UNION NATIONAL MONUMENT - H20 TANK WALKWAY

Posted 8/30/18, 12:00 AM