Delivery Order NNL10AA07B-NNL14AA52T
- Not listed
- This firm fixed-price delivery order was awarded by the Armstrong Flight Research Center (AFRC), a civilian agency, to Empirical Systems Aerospace Inc. (Esaero) under the Small Business Innovation Research (SBIR) Program Phase III. The $813,620.32 contract requires Esaero to design and plan a test and evaluation program to develop requirements, techniques, tools and procedures for testing tightly integrated propulsion-airframe-integration (PAI) systems, specifically those employing a...
- The Boeing Company's Engineering, Test & Technology Division was awarded a $1.88 million cooperative agreement by NASA's Langley Research Center under the Aeronautics Research Mission Directorate (ARMD) Fixed Wing program for the Integrated Adaptive Wing Technology Maturation project. This research initiative, which commenced on January 22, 2015 and concludes on April 30, 2026, aims to develop advanced wing control systems that achieve real-time drag minimization during flight while...
- The National Aeronautics and Space Administration Langley Research Center (NASA) awarded a $615,042 cost-plus-fixed-fee delivery order contract to National Institute Of Aerospace Associates for truss-braced wing structural weight estimation and exploration of the high-level design space while including more detailed aero-structural design. The prime contractor will assess any potential adverse static or dynamic aeroelastic effects under the contract ending in May 2023. Georgia Tech Research...
- This federal contract award was issued by the Langley Research Center, a civilian agency of the National Aeronautics and Space Administration (NASA), to The Boeing Company. The $14,058,676.00 cost-plus-fixed-fee contract is for the design, refinement, and wind tunnel testing of a long-range, transonic, truss-braced wing aircraft concept as part of NASA's N+3 advanced technology research program. The contract includes options to develop a low-speed high-lift configuration and conduct additional...
- This federal contract award, issued by the National Aeronautics and Space Administration (NASA) Langley Research Center, tasks the National Institute of Aerospace Associates (NIA), a non-profit research institute, to update the Advanced Air Transport Technology (AATT) project's technology dashboard with models for high aspect ratio wing (HARW) technologies, including tow-steered structures, natural laminar flow, and active flow control. The award also requires NIA to conduct trade studies on...
- This is a firm fixed-price delivery order contract awarded by NASA's Glenn Research Center to Advanced Technologies, Inc., a small business aerospace engineering company based in Newport News, Virginia. The contract, valued at $493,540.00, is for the design and fabrication of a scaled, semi-span CRM wing model for the ONERA F1 wind tunnel. The contract is a task order under the Reliance Consolidated Models IV (RECOM IV) indefinite-delivery, indefinite-quantity (IDIQ) contract vehicle, which...
- LS Technologies LLC, a wholly-owned subsidiary of Tetra Tech, Inc., received a delivery order modification (TO 693KA8-24-F-00001_TORFP 2324) to exercise Option Period 2 and add funding for Connected Aircraft Information Concepts and Systems Engineering work. The contract, valued at $8.14 million with a time-and-materials pricing structure, extends through October 22, 2028, and is funded by a civilian federal agency headquartered in Washington, DC. This delivery order is not subject to a small...
- This firm-fixed-price delivery order, awarded to Advanced Technologies, Inc., a small business aerospace engineering company, tasks the contractor with designing, analyzing, and fabricating mounting hardware to test an existing 11.8% scale semispan transonic truss-braced wing (TTBW) model in NASA's 14x22 Subsonic Tunnel. The $54,810.00 contract, awarded on July 24, 2025, has a performance period ending on March 31, 2026. Advanced Technologies, Inc. is experienced in developing sophisticated...
- This is a firm fixed-price delivery order contract awarded by the Armstrong Flight Research Center, a civilian agency, to the West Virginia High Technology Consortium Foundation (doing business as High Technology Foundation) for flight test engineering and held requirement development for the Integrated Resilient Aircraft Control project. The objective is to increase the capability of the Airborne Research Test System (ARTS IV) by completing held requirements and specific ARTS IV flight...
- This federal contract award from the National Aeronautics and Space Administration (NASA) Langley Research Center to the National Institute of Aerospace Associates (NIA) aims to investigate and enhance unstructured surface-vorticity-based aerodynamic solvers for rapid low-speed analysis of aircraft high-lift configurations. The $155,593.49 cost-plus-fixed-fee delivery order, awarded on September 28, 2015, has the following key objectives: (1) develop a pressure-difference rule suitable for...
- NNL10AA07BIndefinite Delivery Contract
- NNL10AA07B-NNL14AA52TDelivery Order
TASK ORDER - STATEMENT OF WORK (SOW) TASK TITLE: ERA INTEGRATED ADVANCED WING TECHNOLOGY DEMONSTRATION FLIGHT TEST OPTIONS STUDY 1.0 INTRODUCTION/BACKGROUND: THE GOAL OF THE INTEGRATED SYSTEMS RESEARCH PROGRAM (ISRP) WITHIN NASAS AERONAUTICS RESEARCH MISSION DIRECTORATE (ARMD) IS TO CONDUCT RESEARCH AT AN INTEGRATED SYSTEM LEVEL ON PROMISING CONCEPTS AND TECHNOLOGIES FOR COMMERCIAL TRANSPORT-CLASS VEHICLES AND DEMONSTRATE THE BENEFITS IN A RELEVANT ENVIRONMENT. THE ENVIRONMENTALLY RESPONSIBLE AVIATION (ERA) PROJECT, A PROJECT OF ISRP, HAS THE GOAL TO EXPLORE AND ASSESS NEW VEHICLE CONCEPTS AND ENABLE TECHNOLOGIES THROUGH SYSTEM-LEVEL EXPERIMENTATION TO REDUCE FUEL BURN, NOISE AND EMISSIONS. SYSTEM STUDIES HAVE SHOWN THAT LAMINAR FLOW CONTROL (I.E., DELAY OF BOUNDARY LAYER TRANSITION) IS ONE OF THE KEY TECHNOLOGIES REQUIRED TO MEET THE ERA SYSTEM LEVEL METRICS BECAUSE OF THE SIGNIFICANT REALIZABLE REDUCTION OF SKIN FRICTION DRAG. THEREFORE, THE DRAG REDUCTION ELEMENT OF THE ERA PROJECT PRIMARILY FOCUSES ON MATURATION OF KEY TECHNOLOGIES TO DEMONSTRATE THE PRACTICAL FEASIBILITY OF LAMINAR FLOW CONTROL. IN ORDER TO INVESTIGATE SWEPT-WING LAMINAR FLOW TECHNOLOGY, NASA INTENDS TO UTILIZE A TWO-PHASE PROCESS. PHASE I ENCOMPASSES THE EFFORT OF THIS TASK ORDER. PHASE II (IF NASA DECIDES TO PROCEED), WILL BE FOR THE EXECUTION OF THE PROGRAM DEFINED DURING PHASE I. 2.0 SCOPE AND OBJECTIVE(S): 2.1 THE SCOPE OF THIS TASK ORDER (PHASE I) IS TO INVESTIGATE OPTIONS FOR EXECUTING A TEST PROGRAM THAT WOULD ENABLE THE ADVANCED AERODYNAMIC AND STRUCTURAL CONCEPTS RELEVANT TO COMMERCIAL TRANSPORT-CLASS VEHICLES (HEREINAFTER REFERRED TO AS ERA VEHICLES) BY MATURING KEY AERODYNAMIC AND STRUCTURAL TECHNOLOGIES TO TECHNOLOGY READINESS LEVEL (TRL) AND MANUFACTURING READINESS LEVEL (MRL) 6. OF SPECIFIC INTEREST ARE OPTIONS FOR DEMONSTRATING SWEPT-WING LAMINAR FLOW (SWLF) TO MAXIMIZE ACHIEVABLE NATURAL LAMINAR FLOW REYNOLDS NUMBERS AT COMMERCIAL TRANSPORT RELEVANT CONDITIONS. 2.2 THE OBJECTIVE OF THIS TASK ORDER (PHASE I) IS TO DEFINE AN INTEGRATED ADVANCED WING TECHNOLOGY DEMONSTRATION (IAWTD) PROGRAM (TO BE EXECUTED IN PHASE II) THAT INCLUDES WING DESIGN CONCEPTS WITH LOADING AND SWEEP ANGLES APPROPRIATE FOR EFFICIENT 0.85 MACH NUMBER FLIGHT FOR RANGES AND PAYLOADS TYPICAL OF COMMERCIAL TRANSPORT VEHICLES, INCLUDING DEMONSTRATION OF SWEPT-WING LAMINAR FLOW WITH AND WITHOUT DISCRETE ROUGHNESS ELEMENTS (DRE). 3.0 DESCRIPTION OF THE WORK/TASKS TO BE PERFORMED: THE CONTRACTOR SHALL PERFORM THE FOLLOWING TASKS: 3.1 VEHICLE AND WING CONCEPT IDENTIFICATION 3.1.1 THE CONTRACTOR SHALL CONDUCT A STUDY TO EXAMINE THE POTENTIAL ERA VEHICLES TO DETERMINE THE BEST OPTIONS FOR CANDIDATE WING SECTIONS TO PROVIDE REQUIREMENTS FOR CONDUCTING THE PHASE II FLIGHT TESTS TO ACHIEVE SOW 2.2 OBJECTIVE. 3.1.2 THE CONTRACTOR SHALL ESTIMATE, BASED ON ERA VEHICLES IN TASK 3.1.1, VARIOUS WING PROPERTIES INCLUDING AVERAGE WING LOADING, BENDING MOMENTS, AND TRANSITION REYNOLDS NUMBERS. THESE PROPERTIES ARE TO BE COMPARED TO EXISTING STRUCTURAL AND SWLF CAPABILITIES TO CLEARLY INDICATE THE PROMISED ADVANCEMENTS WITH RESPECT TO THE CURRENT STATE OF THE ART. 3.1.3 THE CONTRACTOR SHALL DEFINE IAWTD PROGRAM ELEMENTS, INCLUDING GROUND AND FLIGHT TESTS, REQUIRED TO ACHIEVE THE OVERALL OBJECTIVE OF SOW 2.2. 3.1.4 THE CONTRACTOR SHALL DEFINE A DRAFT SET OF TOP LEVEL REQUIREMENTS FOR THE IAWTD PROGRAM. IN DEFINING THE TOP LEVEL REQUIREMENTS, THE CONTRACTOR IS TO ASSESS IMPORTANCE AND SIGNIFICANCE OF SCALING FOR BOTH THE SWEPT-WING LAMINAR FLOW AND STRUCTURAL TEST ASPECTS. 3.2 TEST APPROACH, SWEPT WING LAMINAR FLOW AND INTEGRATED STRUCTURAL DEMONSTRATION 3.2.1 THE CONTRACTOR SHALL DEFINE ALL NECESSARY STEPS AND SCHEDULE REQUIRED TO EXECUTE THE IAWTD PROGRAM DURING PHASE II. THESE STEPS SHALL INCLUDE, BUT NOT LIMITED TO: 3.2.1.1 THE FACILITIES REQUIRED TO EXECUTE GROUND TEST AND FLIGHT TEST ELEMENTS. 3.2.1.2 NASA ASSETS THA
Name | Description | Solicitation Number | FederalAgency | Type | PostedDate |
|---|---|---|---|---|---|
STRUCTURES MATERIALS AERODYNAMICS AEROTHERMODYNAMICS AND ACOUSTICS RESEARCHAND TECHNOLOGY -SMAAART- | NNL09ZB1003R | National Aeronautics and Space Administration Langley Research Center | Award Notice 1/1 | 6/8/09, 4:17 PM |
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| 2 | Other Administrative Action | ($865) | 8/27/20 | |
| 1 | Supplemental Agreement for work within scope | $0 | 4/30/14 | |
| Not listed | Not listed | $243.9k | 1/13/14 |