Task order 2 for advanced plant habitat. The contractor shall provide the item or services specified in section b in accordance with the following: 1.0 the national aeronautics and space…
Ended Awarded Last action
- Contract number
- NNK15MA04T
- Awardee
-
Sierra Nevada Company, LLC UEI DD2QET4D27T3
- Awarding agency
-
Kennedy Space Center
National Aeronautics and Space Administration
- Obligated
- $4,343,286
Award facts
- Contract value 100% obligated
- $4,343,286.13 Current and potential, with all options
- Completion date 100% complete
- Current and potential, with all options
- NAICS code
- 541712 Research and Development in the Physical, Engineering, and Life Sciences (except Biotechnology)
- PSC
- AR14 Space R&D Services; Space Flight, Research And Supporting Activities; R&D Administrative Expenses
- Set-aside
- No set-aside
- Competition
- Not Competed Only One Source
- Pricing
- Firm Fixed Price
- Place of performance
- Madison, WI 53717, USA
Award details come from SAM.gov/FPDS.
Transactions
| Action | Obligated | Date |
|---|---|---|
| Supplemental Agreement for work within scope | $0 | |
| Supplemental Agreement for work within scope | $0 | |
| Supplemental Agreement for work within scope | $0 | |
| Supplemental Agreement for work within scope | $0 | |
| Supplemental Agreement for work within scope | $0 | |
| Supplemental Agreement for work within scope | $0 | |
| Supplemental Agreement for work within scope | $0 | |
| Supplemental Agreement for work within scope | $144,976 | |
| Other Administrative Action | $473,328 | |
| Other Administrative Action | -$473,328 | |
| Other Administrative Action | -$1,461,825 | |
| Other Administrative Action | $1,461,825 | |
| Other Administrative Action | -$4,198,310 | |
| Other Administrative Action | $4,198,310 | |
| Original award | $4,198,310 |
Show all 15
Description
Task order 2 for advanced plant habitat. The contractor shall provide the item or services specified in section b in accordance with the following: 1.0 the national aeronautics and space administration plans for the advanced plant habitat (APH) project is to fabricate and certify a plant habitat (PH) facility for implementation on the international space station (ISS) that will provide the research community a large environmentally controlled growth chamber for use on the ISS. The national aeronautics and space administration requires fabrication, certification, and implementation support in the development of this facility which includes subsystems/orbital replacement unit (ORU) and parts to repair the subsystems/ORU in accordance with attachment j-01 systems requirements document for the plant habitat (PH), PH-R0001 and attachment j-02 contract work breakdown structure. 2.0 the contractor shall fabricate flight PH that consists of the following: a. Avionics (2.1) the plant habitat avionics real-time manager (pharmer) in expedite the processing of experiments to space station (express) rack is the primary hardware that communicates with the core microcontrollers that exists in each subsystem and allows control and collection of system and science data. B. Software (2.2) the software controls both system and plant growth chamber parameters and collects both science and system data. The three software's being developed is for the pharmer, ground science station, and the express rack computer on the ISS. C. Growth light assembly (GLA) (2.3) the GLA provides the necessary light intensity (up to 1000 MOL/M2S @ 15CM) and light level ( MOL/M2S @ 15CM) at 600 red, 400 blue, 100 green, 50 far red, 600 white, and infra-red (IR) for night for plant growth. The GLA also contains a camera for top view imaging of the plants. D. Power distribution assembly (PDA) (2.4) the PDA receives 28V power from four express rack power feeds. The PDA converts that power as necessary (different voltages) to provide power to the other subsystems within PH as required. E. Thermal control system (TCS) (2.5) the TCS consist of the moderate temperature loop (MTL) coldplates on the environmental control system (ECS), avionics unit, PDA, and GLA; IT also consist of the avionics air assembly (AAA) forced air from the express rack that cools the ORU drawer inside the PH cavity, and inside the international subrack interface standard)(isis) drawer. F. Water recovery and delivery system (wrads) (2.6) the wrads stores recovered condensate water delivered by the ECS, transfer water from the recovery storage reservoir to the humidity control unit during priming operations, transfer recovered condensate water to the distribution storage reservoir, transfer water from the distribution storage reservoir to the science carrier root tray for moisture control (feeding), and prime the science carrier root tray for seed germination. G. Environmental control system (ECS) (2.7) the ECS has capability for air circulation & temperature/humidity control, carbon dioxide control, ethylene removal & air sample, and ECS pressure and oxygen concentration maintenance. H. Science carrier (2.8) the science carrier is a removable and reconfigurable tray within the APH that will provide the principle structural support and final water delivery to the root-zone for plant growth experimentation. I. Growth chamber (2.9) the growth chamber is the plant grow area. IT interfaces with the ECS modules, science carrier, and the GLA (through a window). IT also contains components on the back of the chamber for atmosphere control, imaging capability (2 cameras), and a power & communication microcontroller. J. Structural mounting assembly (SMA) (2.10) the SMA consists of the backplate, outer skin, bottom pan, and ORU/chamber mounting rails, ORU drawer, and air filtration assembly. 3.0 the contractor shall fabricate orbital replacement unit (ORU) for PH that consists of a
Quick answers
Who was awarded contract NNK15MA04T?
NNK15MA04T was awarded to Sierra Nevada Company, LLC by Kennedy Space Center (National Aeronautics and Space Administration) on February 5, 2015.
How much is contract NNK15MA04T worth?
The government has obligated $4,343,286 on NNK15MA04T.
Is contract NNK15MA04T an order under another contract?
Yes. NNK15MA04T is a delivery order under NNK15MA02B, an indefinite delivery contract.
Was contract NNK15MA04T competed?
The extent of competition for NNK15MA04T was not competed.
On GovTribe
See this award's full record
- Every transaction and funding action
- The awardee's other awards and teaming partners
- Similar awards and recompete opportunities
- Ask GovTribe AI about this award