Delivery Order FA812221D0011-FA812222F0060
- Not listed
- This is a firm-fixed-price delivery order awarded by the Air Force Sustainment Center to General Electric Company (GE) for the remanufacture of F118 front frames. The $2,106,018.00 contract has an ultimate completion date of August 25, 2025. GE, through its GE Aviation division operating as GE Edison Works, is the prime contractor for this award, which does not have a small business set-aside designation. The Air Force Sustainment Center is a defense agency that provides maintenance, repair, and...
- The Department of the Air Force Materiel Command Air Force Sustainment Center awarded a $1.6 million firm fixed price delivery order contract to General Electric Company for the production of front frames. GE will perform the work through its GE Aviation Division operating as GE Edison Works. The contract has a period of performance from June 26, 2020 through July 31, 2020. Production will occur in Wyoming, Ohio. The Air Force Sustainment Center supports the Air Force's aircraft and...
- The Department of the Air Force Materiel Command Air Force Sustainment Center awarded a $766,032 firm fixed price delivery order contract to General Electric Company, doing business as GE Aviation Division and GE Edison Works, to provide new manufactured materials applicable to F118 GE 100 engines. As the parent company, General Electric Company will perform the work under the contract through its Aviation and Edison Works divisions. Place of performance will be in Wyoming, Ohio. The contract...
- The U.S. Air Force awarded a delivery order valued at $3.58M to General Electric Company's Aviation division (operating as GE Edison Works) on September 13, 2024, for F-138 General Electric FSR/SE/PM (Field Service Representative/Systems Engineer/Program Manager) support services. This firm fixed-price delivery order, with an ultimate completion date of September 12, 2025, will be performed in Wyoming, Ohio at the Oklahoma City Air Logistics Complex, a Defense Department facility responsible for...
- This is a firm-fixed-price delivery order contract awarded by the Air Force Sustainment Center to General Electric Company (GE), a large defense contractor, for the production of F118 aircraft front frames. The contract has a ceiling value of $4,212,036.00 and a completion date of May 19, 2026. The contract is not designated as a set-aside. GE, through its GE Aviation division (operating as GE Edison Works), is a prominent supplier of aircraft engines, components, and advanced technologies to...
- The U.S. Air Force Sustainment Center awarded a $2.37 million firm fixed-price delivery order to General Electric Company's Aviation division (operating as GE Edison Works) for the new manufacture of F-110 aircraft engine frames and fans. The contract, awarded September 30, 2025, with performance concluding by July 31, 2027, will be executed at GE's facility in West Chester Township, Ohio. This delivery order carries no small business set-aside designation, reflecting GE's status as a large,...
- This federal contract award, identified as FA812221D0011|FA812222F0006, was issued by the Air Force Sustainment Center (AFSC) to General Electric Company (GE) for the remanufacturing of F118 front frames. The delivery order is valued at $340,471.68 and has a completion date of September 30, 2026. GE, a major defense contractor, will provide these services through its GE Aviation division, operating as GE Edison Works. This award is not designated as a set-aside contract. GE has a long history of...
- General Electric Company's GE Aviation division was awarded a delivery order (DO3) valued at $850.3 million on March 1, 2025, for engine build, test, maturation, and integration activities. This delivery order falls under a larger $5.0 billion single-award Indefinite Delivery Vehicle with the Aeronautical Systems Center (Air Force) through December 2031, which focuses on F110 aircraft engine procurement and foreign military sales support. The work will be performed in Wyoming, Ohio, with an...
- General Electric Company's GE Aviation division was awarded a delivery order valued at $7.2 million on November 1, 2024, under the FY25 F-Series Component Improvement Program. This cost-plus-fixed-fee delivery order, which extends through April 30, 2026, supports the sustainment and improvement of F-series aircraft engine components critical to U.S. Air Force fighter aircraft operations. The award was made by the Aeronautical Systems Center, a subordinate organization of Air Force Materiel...
- General Electric Company's GE Aviation division, operating as GE Edison Works, was awarded a $5.3M firm fixed-price delivery order by the Air Force Sustainment Center on December 6, 2024, for the remanufacture of F108 Mod 13/15 Low-Pressure Turbine (LPT) assemblies for Navy applications. The work will be performed in Wyoming, Ohio, with an ultimate completion date of September 2, 2026. This delivery order carries no small business set-aside designation, consistent with GE's status as a large,...
- FA812221D0011Indefinite Delivery Contract
- FA812221D0011-FA812222F0060Delivery Order
The U.S. Air Force Sustainment Center issued a delivery order valued at $979,234.03 on May 31, 2022, to General Electric Company's Aviation division (operating as GE Edison Works) for remanufacturing of F118 front frame components at a medium complexity level. The work is being performed in Wyoming, Ohio, with an ultimate completion date of April 30, 2026. This delivery order operates under a firm fixed-price structure with no small business set-aside designation, reflecting GE Aviation's classification as a large contractor. The award falls under GE Aviation's existing indefinite delivery vehicle relationships with the Air Force Sustainment Center, which provide flexible procurement authority for sustained government operations and have generated hundreds of millions of dollars in delivery orders for aircraft engine components and sustainment services. GE Aviation maintains extensive experience remanufacturing military aircraft engine components across multiple engine families, including the F118 turbofan engine that powers various Department of Defense platforms. This remanufacturing effort aligns with the Air Force's broader engine component sustainment strategy through the Air Force Sustainment Center, supporting the maintenance and readiness of military aviation assets. GE Aviation's involvement in F118 front frame remanufacturing represents a continuation of the company's critical role as a primary supplier of propulsion system components and sustainment services to the Department of Defense, leveraging established manufacturing and engineering capabilities across multiple Ohio and Kansas facilities.
Name | Description | Solicitation Number | FederalAgency | Type | PostedDate |
|---|---|---|---|---|---|
F118 FRONT FRAME | FA8122-21-D-0011 | Department of the Air Force Materiel Command Air Force Sustainment Center | Limited / Sole Source Justification 4/4 | 10/21/21, 7:40 AM | |
F118 Front Frame Remanufacture | FA8122-18-R-0003 | Department of the Air Force Materiel Command Lifecycle Management Center Tinker Air Force Base | Solicitation 1/4 | 1/10/18, 3:30 PM | |
F118 FRONT FRAME | FA8122-18-R-0003 | Department of the Air Force Materiel Command Air Force Sustainment Center | Solicitation 2/4 | 7/30/21, 1:26 PM | |
F118 FRONT FRAME | FA8122-18-R-0003 | Department of the Air Force Materiel Command Air Force Sustainment Center | Award Notice 3/4 | 9/30/21, 3:19 PM |
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| P00004 | Other Administrative Action | $0 | 11/4/25 | |
| P00002 | Other Administrative Action | $0 | 8/8/24 | |
| A00001 | Other Administrative Action | $0 | 3/26/24 | |
| P00001 | Supplemental Agreement for work within scope | $0 | 6/8/23 | |
| Not listed | Not listed | $1.2m | 5/31/22 |