Ohio riverfront, cincinnati, ohio

Ended Definitive Contract Awarded Last action

Contract number
W912QR10C0056
Awardee
Awarding agency
Obligated
$10,973,233

Award facts

Opportunity
Contract value 100% obligated
$10,973,233.30 Current and potential, with all options
Completion date 100% complete
Current and potential, with all options
NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Y199 Construct/Misc Bldgs
Set-aside
No set-aside
Competition
Full and Open Competition · 8 offers Negotiated Proposal / Quote
Pricing
Firm Fixed Price
Place of performance
Sharonville, OH 45241, USA
Legislative mandates

Award details come from SAM.gov/FPDS.

Transactions

Action Obligated Date
Supplemental Agreement for work within scope A00045 · Case 070 credit for deleting requirement to construct sidewalk along mehring way and provide electric utilities; case 071 install 1 additional light in elevator… -$5,290
Supplemental Agreement for work within scope A00044 · Case 065 install 6" rounded edge pieces of douglas fir soffit boards, furnish plate in sand-blasted finish and delete requirement to install 350 creeping… $2,545
Change Order A00043 $13,098
Supplemental Agreement for work within scope A00042 · Case 067 changes to elevator including drilling core holes, installing steal beam, installing granite/sandstone, install seal, and remove, refabricate and… $79,209
Supplemental Agreement for work within scope A00041 · Case 064 delete requirement to install 7 PL6 poles and light fixtures, walnut street fountain and grand stairway, phase 1, ohio riverfront, cincinnati, OH -$60,727
Supplemental Agreement for work within scope A00040 · Case 053 time extension due to weather delays, walnut street fountain and grand stairway, ohio riverfront, cincinnati, OH $0
Supplemental Agreement for work within scope A00039 · Case 069 remove existing pile caps on south side, walnut streete fountain and grand stairway, phase i, ohio riverfront, cincinnati, OH $5,836
Additional Work (new agreement, FAR part 6 applies) A00038 $25,212
Additional Work (new agreement, FAR part 6 applies) A00037 $89,033
Supplemental Agreement for work within scope A00036 · Case 061 provide sand blast finish at each pergola column; case 062 saw cut 4' of concrete on south side of elevator and provide continuous 8" extension to… $16,129
Supplemental Agreement for work within scope A00035 · Case 051 revise slot drain; case 057 replace flush valves and relocate conduit stub-UPS for remote frost free valve boxes; case 059 add two 2" bronze drain… $44,451
Supplemental Agreement for work within scope A00034 · Case 050 shim electrical vault to meet grades, walnut street fountain and grand stairway, phase i, ohio riverfront, cincinnati, OH $14,134
Supplemental Agreement for work within scope A00033 · Case 056 install new wet pipe fire suppression system for bike visitor center, install new 2" valve for domestic water line, and install associated sprinkler… $27,271
Supplemental Agreement for work within scope A00032 · Case 042 additional SS guardrail reinforcement, part 2 final to modification A00030, walnut street fountain and grand stairway, phase 1, ohio riverfront,… $33,786
Supplemental Agreement for work within scope A00031 · Case 016 provide traffic control along new mehring way to accommodate special events and other day-to-day activities, walnut street fountain and grand stairway,… $91,869
Change Order A00030 · Case 042 add 2 SS rods along entire length of guardrail system, part 1 notice to proceed, walnut street fountain and grand stairway, phase i, ohio riverfront,… $101,357
Supplemental Agreement for work within scope A00029 · Case 044 provide and install four concrete sumps with cover grates, walnut street fountain and grand stairway, phase i, ohio riverfront, cincinnati, OH $34,752
Supplemental Agreement for work within scope A00028 · Case 041 extend slot drain #10 south of the elevator tower; case 054 install concrete encasement of all high voltage secondary conduits, walnut street… $10,738
Supplemental Agreement for work within scope A00027 · Case 049 install bike runnel system on stairway; case 055 provide engraving at upper basin west, walnut street fountain and grand stairway, phase i, ohio… $31,270
Supplemental Agreement for work within scope A00026 · Case 048 install stainless steel extensions on all wall skimmers and inlet fittings, provide granite cap on upper pool floor inlets and install watertight seals… $26,482
Change Order A00025 $85,184
Supplemental Agreement for work within scope A00024 · Case 020 compensation for costs associated with impacts due to placing concrete in cold weather, walnut street fountain and grand stairway, phase i, ohio… $140,617
Change Order A00022 $40,449
Supplemental Agreement for work within scope A00023 · Case 027 provide reinforcing for 8" CMU wall, provide lintel, place bull nose blocks, install ridig masonry anchors, rake and fill with caulking; case 031… $80,458
Change Order A00021 $102,054
Supplemental Agreement for work within scope A00020 · Case 028 architectural changes to bicycle visitor center including relocation of restroom, relocation of doors, deletion of concrete curb, installation of new… $77,917
Supplemental Agreement for work within scope A00019 · Case 035 construct concrete beams and slabs in order to achieve final elevations; case 038 add reinforced concrete foundation below segmental retaining wall… $23,185
Supplemental Agreement for work within scope A00018 · Case 034 add drainage systems for 139 waterfall lights and tie into storm water system, walnut street fountain and grand stairway, phase i, ohio riverfront,… $33,000
Change Order A00017 $23,672
Change Order A00016 $0
Supplemental Agreement for work within scope A00015 · Case 004 extend 4" line to room 122 and into the unmanned room to the south; case 011 adjust building control points and RE-establish control line; case 017… $73,087
Other Administrative Action P00004 $0
Change Order A00014 $57,842
Supplemental Agreement for work within scope A00013 · Case 015 provide laminated safety glass in elevator hoistway, ohio riverfront walnut street fountain and grand stairway, phase 1, cincinnati, OH $2,397
Supplemental Agreement for work within scope A00012 · Case 0006 construct sidewalk along mehring way, ohio riverfront, walnut fountain and grand stairway, cincinnati, OH $28,555
Change Order A00011 $32,949
Change Order A00010 $45,069
Supplemental Agreement for work within scope A00009 · Make adjustments to pile caps, part II final, walnut street fountain and grand stairway, phase i, ohio riverfront, cincinnati, OH $75,185
Supplemental Agreement for work within scope A00008 · Remove existing obstructions including concrete pile caps, duct bank, and horseshoe foundations, ohio riverfront, walnut street fountain and grand stairway,… $91,300
Change Order A00007 $3,092
Supplemental Agreement for work within scope A00006 · Reroute storm drainage to the south, place pipe under existing sidewalk on north side of project limites, walnut street fountain and grand stairway, ohio… $28,901
Supplemental Agreement for work within scope A00005 · Case 009, place drain lines from fountain to sump PIT and connect to sanitary lines; case 013, add 3-way switch in room 108; case 014, increase choreoswitch… $70,211
Supplemental Agreement for work within scope A00004 · Perform conductivity test on geothermal well and provide results to government, construction of walnut street fountain and grand stairway, phase i, ohio… $35,000
Additional Work (new agreement, FAR part 6 applies) A00003 $955
Exercise an Option P00003 $357,000
Change Order A00002 · Modify existing piles, part 1 notice to proceed, ohio river riverfront, walnut street fountain & grand stairway, cincinnati, OH $15,000
Exercise an Option P00002 $350,000
Funding Only Action P00001 $0
Change Order A00001 · Remove approximately 1200 SY of asphalt paving, part i notice to proceed, walnut street fountain and grand stairway, ohio river riverfront, cincinnati, OH $5,000
Original award $8,514,000
Show all 50

Quick answers

Who was awarded contract W912QR10C0056?

W912QR10C0056 was awarded to Monarch Construction Company by ENDIST Louisville (US Army Corps of Engineers) on May 21, 2010.

How much is contract W912QR10C0056 worth?

The government has obligated $10,973,233 on W912QR10C0056.

Was contract W912QR10C0056 competed?

The extent of competition for W912QR10C0056 was full and open competition. The government received 8 offers.

On GovTribe

See this award's full record

  • Every transaction and funding action
  • The awardee's other awards and teaming partners
  • Similar awards and recompete opportunities
  • Ask GovTribe AI about this award