Detached breakwater work: the existing detached breakwater structure will be repaired. Along the easternmost 200' of the structure, armor stone will be added to bring the structure back to the…

Ended Definitive Contract Awarded Last action

Contract number
W912P619C0006
Awardee
Awarding agency
Obligated
$1,681,676

Award facts

Opportunity
Contract value 71% obligated
  • $1,681,676.15 Current, with exercised options
  • $2,353,371.15 Potential, with all options
Completion date 100% complete
Current and potential, with all options
Contracting staff
Funding agency
US Army Corps of Engineers Department of the Army, Department of Defense
Set-aside
HUBZone
Competition
Full and Open Competition after exclusion of sources · 6 offers Sealed Bid
Pricing
Firm Fixed Price
Place of performance
Michigan City, IN 46360, USA
Legislative mandates

Award details come from SAM.gov/FPDS.

Transactions

Action Obligated Date
Supplemental Agreement for work within scope A00002 · Delete reach m work -$266,175
Supplemental Agreement for work within scope A00001 · East pier milestone extension and fish window change $0
Other Administrative Action P00002 · Part II P00002 RE-application of the funds to cover contract with new funding clin 0000FF. $1,947,851
Other Administrative Action P00001 · Modificarion P00001 to correct funding application. Part i -$1,947,851
Original award $1,947,851

About this award

The U.S. Army Corps of Engineers awarded a $2,353,371.15 firm-fixed price definitive contract to Great Lakes Dock And Materials, L.L.C., a certified Small Business Administration HUBZone firm, to perform repairs to a detached breakwater and East Pier in Michigan City, Indiana. The scope includes adding armor stone to restore the breakwater structure and make concrete and steel repairs to the pier. This contract is part of the Army Corps of Engineers' civil works program to maintain and improve navigation infrastructure across the Great Lakes region. Great Lakes Dock And Materials has previously performed harbor dredging, breakwater construction, and other marine construction projects for the Army Corps of Engineers under set-aside and non-set-aside contracts.

Description

Detached breakwater work: the existing detached breakwater structure will be repaired. Along the easternmost 200' of the structure, armor stone will be added to bring the structure back to the design section elevation and side slopes, and to support the existing navigation light. Along the remaining 1000', stone will be added as necessary to fill voids in the existing tructure and meet the design slopes. East pier beyond the existing lighthouse will be repaired. A new reinforced concrete slab will be poured, and new armor plates will be installed along the exterior of this portion of the pier. Along the remainder of the east pier, minor structural repairs will be performed including: removal of damaged rebar; repair of existing steel bar ladders; minor concrete spalling repair.

Quick answers

Who was awarded contract W912P619C0006?

W912P619C0006 was awarded to Great Lakes Dock And Materials, L.L.C. by ENDIST Chicago (US Army Corps of Engineers) on April 15, 2019.

How much is contract W912P619C0006 worth?

The government has obligated $1,681,676 on W912P619C0006. Its potential value, with all options, is $2,353,371.

Which agency awarded contract W912P619C0006?

ENDIST Chicago (US Army Corps of Engineers) awarded W912P619C0006, with funding from US Army Corps of Engineers (Department of the Army).

Was contract W912P619C0006 competed?

The extent of competition for W912P619C0006 was full and open competition after exclusion of sources. The government received 6 offers. It was set aside: HUBZone.

On GovTribe

See this award's full record

  • Every transaction and funding action
  • The awardee's other awards and teaming partners
  • Similar awards and recompete opportunities
  • Ask GovTribe AI about this award