This project is the second of two phases associated with the basic training complex, phase 1 (PN51857). The scope of this phase 2 project (PN54489) includes one dining facility, an improved…

Ended Definitive Contract Awarded Last action

Contract number
W912DQ13C4010
Awardee
Awarding agency
Obligated
$12,382,913

Award facts

Opportunity
Contract value 100% obligated
$12,382,913.08 Current and potential, with all options
Completion date 100% complete
Current and potential, with all options
Set-aside
Total Small Business
Competition
Full and Open Competition after exclusion of sources · 7 offers Negotiated Proposal / Quote
Pricing
Firm Fixed Price
Place of performance
FT LEONARD WD, MO 65473, USA
Legislative mandates

Award details come from SAM.gov/FPDS.

Transactions

Action Obligated Date
Change Order A00001 · Modification for concrete hard stand; and, chimney for combine oven drain to contract for single dining facility at FT. Leonard wood, missouri. $39,005
Change Order P00025 · Modification for access panels, freezer doors and fire alarm system; and, added backdraft damper to contract for single dining facility 054489 at FT. Leonard… $24,677
Change Order P00024 · Modification for door stops and bollard sleeves to contract for single dining facility at FT. Leonard wood, missouri. $0
Change Order P00023 · Modification for revised control sequencing to contract for single dining facility 054489 at FT. Leonard wood, missouri. $22,764
Change Order P00022 · Modification for catv box to contract for single dining facility at FT. Leonard wood, missouri. $3,898
Change Order P00021 · Modification for differing site condition east drive to contract for single dining facility 054489 at FT. Leonard wood, missouri. $2,848
Change Order P00020 · Modification for extended OH cost for additional flushing to contract for single dining facility at FT. Leonard wood, missouri. $79,819
Change Order P00019 · Modification due to unusually severe weather resulting in a time extension to contract for single dining facility at FT. Leonard wood, missouri. $0
Change Order P00018 · Modification to air barrier; static tile in communication room 145; computer; pull stations and corner guards; and, level pad for blast chiller to contract… $17,428
Change Order P00017 · Modification for additional flushing requirement to contract for single dining facility 054489 at FT. Leonard wood, missouri. $8,227
Change Order P00016 · Modification for differing site condition east DR. To contract for single dining facility at FT. Leonard wood, missouri. $26,250
Change Order P00015 · Modification for east drive change to contract for single dining facility at FT. Leonard wood, missouri. $11,252
Change Order P00014 · Modification for upgrade gas sizes to contract for single dining facility 054489 at FT. Leonard wood, missouri. $1,841
Change Order P00013 · Change all top shelves from glass to stainless steel for items 66A and 89A shelf protectors (lighted). Contract for single dining facility 054489 at FT. Leonard… $11,895
Change Order P00012 · MOD is for welding of structural steel capable of transferring moment across column supports. Contract for single dining facility 054489 at FT. Leonard wood,… $3,973
Change Order P00011 · Change for dfac artwork to contract for single dining facility 054489 at FT. Leonard wood, missouri. $4,212
Change Order P00009 · Change for hot water source pumps and ceiling in dock area to contract for single dining facility 054489 at FT. Leonard wood, missouri. $8,394
Change Order P00010 · Change for pole light branch circuits and particulate separator to contract for single dining facility 054489 at FT. Leonard wood, missouri $3,221
Change Order P00008 · Change for revised louver depth; and, exit lights to contract for single dining facility at FT. Leonard wood, missouri. $9,133
Change Order P00007 · Change for lower inlet and manholes n parking lot to contract for single dining facility at FT. Leonard wood, missouri. $880
Change Order P00006 · Change to move parking lot to service entrance to contract for single dining facility at FT. Leonard wood, missouri. $11,976
Change Order P00005 · Change to install drain points to contract for single dining facility at FT. Leonard wood, missouri. $4,286
Change Order P00004 · Change for louver size to contract for single dining facility at FT. Leonard wood, missouri. $2,255
Change Order P00003 · Change for north parking lot elevation change; roof hatch size change; change steel pipe to PVC mechanical; and, add floor drain to contract for single dining… $2,678
Exercise an Option P00002 · Exercise option clin 0005 fort leonard wood dfac class c equipment $242,000
Exercise an Option P00001 · PN 54489 dining facility (dfac) - exercise option clin 0004 furniture, fixtures and equipment $129,000
Original award $11,711,000
Show all 27

Description

This project is the second of two phases associated with the basic training complex, phase 1 (PN51857). The scope of this phase 2 project (PN54489) includes one dining facility, an improved trash/cardboard compacting and recyclable collection area, and associated site improvements.

Quick answers

Who was awarded contract W912DQ13C4010?

W912DQ13C4010 was awarded to Donald Maggi Inc. by ENDIST Kansas City (US Army Corps of Engineers) on May 31, 2013.

How much is contract W912DQ13C4010 worth?

The government has obligated $12,382,913 on W912DQ13C4010.

Was contract W912DQ13C4010 competed?

The extent of competition for W912DQ13C4010 was full and open competition after exclusion of sources. The government received 7 offers. It was set aside: Total Small Business.

On GovTribe

See this award's full record

  • Every transaction and funding action
  • The awardee's other awards and teaming partners
  • Similar awards and recompete opportunities
  • Ask GovTribe AI about this award