Definitive Contract W9128F23C0031

Award Date 9/1/23
Potential Completion Date 5/24/25
Potential Value $10M
Funding Federal Agency
US Army Corps of Engineers
Contracting Federal Agency
ENDIST Omaha
Ultimate Awardee
Not listed
Set-Aside Type
No Set-Aside Used
Federal Contract Vehicle
Extent Competed
Full and Open Competition
Major Defense Program
Not listed
Pricing Type
Firm Fixed Price
Place of Performance
Fort Peck, MT 59248, USA
Solicitation Procedures
Negotiated Proposal / Quote
Number Of Offers Received
4
Legislative Mandate
Davis Bacon Act
National Interest Action
Not listed
Research Type
Not listed
Primary Consortia Member
Not listed
Similar Awards
This federal contract was awarded by the U.S. Army Corps of Engineers to Unico Mechanical Corp., a California-based for-profit company, to refurbish two 180-inch diameter penstock butterfly valves at the Lake Tenkiller Ferry Powerhouse in Gore, Oklahoma. The $5,877,890.63 firm-fixed price contract is for construction services and has an ultimate completion date of April 12, 2024. The work includes replacing seals, refurbishing valve components, and upgrading the valve operators. This contract...
This is a firm-fixed-price purchase order awarded by the U.S. Army Corps of Engineers (USACE) to Unico Mechanical Corp., a California-based for-profit company. The contract, valued at $1,121,890.00, is for the rehabilitation of Unit 6 and optional Unit 8 servomotors at the Big Bend Dam in South Dakota. The scope of work includes servomotor removal, refurbishment, replacement of the cushioning/dampening system, and installation services. The contract has a period of performance of 730 days and is...
This is a $28,084,763 definitive, firm-fixed price contract awarded by the U.S. Bureau of Reclamation, a civilian agency, to Unico Mechanical Corp. for the replacement of two 156-inch diameter butterfly valves and rehabilitation of two 84-inch diameter ring follower gates at the Blue Mesa Powerplant in Gunnison, Colorado. The contract is not set aside for small businesses. The work involves removing and disposing of existing equipment, installing new turbine shutoff valves and bypass piping,...
This is a $1,528,215.00 firm-fixed-price definitive contract awarded by the U.S. Army Corps of Engineers to Marine Diving Solutions, LLC, a service-disabled veteran-owned small business (SDVOSB), for the replacement of draft tube stoplogs and lifting beams at the Fort Peck Dam Powerhouse #1 in Montana. The contract has a total small business set-aside and a period of performance through March 18, 2025. The requirement was originally announced through a pre-solicitation notice, which indicated...
This is a definitive, firm fixed-price contract awarded by the U.S. Army Corps of Engineers (USACE) to Voith Hydro Inc., a foreign-owned, for-profit manufacturer of hydroelectric equipment and technology. The $18,876,224.21 contract is for the civil, major rehabilitation of Project No. 372821 at the Fort Peck facility in Montana, with a completion date of June 24, 2018. The contract does not have a small business set-aside designation. Voith Hydro is a global supplier of advanced hydroelectric...
This is a $1,434,990.55 firm-fixed-price definitive contract awarded by the Bureau of Reclamation, a civilian agency within the Department of the Interior, to Unico Mechanical Corp., a California-based small business, for the installation of DMC Intertie Pump Units 3 and 4 in Tracy, California. The work includes furnishing and installing pump pedestals, government-furnished equipment such as butterfly valves and vertical pumping units, as well as related piping, electrical, and support...
<p>This federal contract award is for a BUTTERFLY VALVE, with a Firm Fixed Price of $6,582.00, awarded by the Department of the Interior US Geological Survey Office of Acquisitions and Grants to the small business prime contractor, Grey Wolf Services. The contract has a completion date of June 9, 2013 and was awarded on April 10, 2013. The place of performance is Whitefish, MT 59937, USA.</p>
<p>This is a firm fixed-price purchase order contract awarded by the U.S. Army Corps of Engineers to Pentair Valves &amp; Controls US LP, a prime contractor, for the repair and upgrade of actuators for Bypass Project #107566. The contract has a ceiling value of $17,906.00 and a completion date of September 30, 2010. The contract is not set aside for any specific program or business type.</p>
<p>The U.S. Army Corps of Engineers awarded a $201,590.62 firm-fixed-price purchase order contract to the Town of Fort Peck, Montana for water and utility services. The contract has an ultimate completion date of May 31, 2029 and was awarded on September 12, 2019. There was no set-aside designation for this contract.</p>
The U.S. Army Corps of Engineers, Omaha District awarded Knight Construction &amp; Supply, Inc. a firm fixed price contract valued at approximately $2.1 million to modernize governor controls at Fort Peck Dam in Montana. Under the requirements contract awarded through solicitation W9128F21R0003, Knight Construction will remove existing hydraulic-mechanical governors and install new digital governor controls and accessories on five generating units over an anticipated 285-day period beginning...

This is a definitive $10,486,230.00 firm-fixed price contract awarded by the U.S. Army Corps of Engineers to Unico Mechanical Corp., a California-based for-profit company, for the Fort Peck Butterfly Valve Replacement project. The contract involves the refurbishment of eighteen 18-foot diameter spiral case inlet butterfly valves and associated systems at Powerhouse 2 of the Fort Peck Dam near Glasgow, Montana. This includes replacing valve components, performing non-destructive examinations, and addressing coating deterioration and corrosion. The contract has an ultimate completion date of May 24, 2025 and was not set aside for small businesses. This contract supports the U.S. Army Corps of Engineers' efforts to maintain and improve critical national water and power infrastructure.