Springfield millrace construction -- replacement of the diversion culverts and sluice gates to gorrie creek and the installation of fish screens; placing fill material to reduce bank slope and channel…

Ended Definitive Contract Awarded Last action

Contract number
W9127N10C0024
Awardee
Awarding agency
Obligated
$2,671,754

Award facts

Opportunity
Contract value 209% obligated
$1,279,176.34 Current and potential, with all options
Completion date 100% complete
Current and potential, with all options
NAICS code
238910 Site Preparation Contractors
Set-aside
8(a) Sole Source
Competition
Not Available for Competition · 1 offer Only One Source
Pricing
Firm Fixed Price
Place of performance
Springfield, OR 97477, USA
Legislative mandates

Award details come from SAM.gov/FPDS.

Transactions

Action Obligated Date
Change Order A00001 · PH2 springfield millrace construction -- final quantity adjustment $110,269
Change Order A00001 $0
Supplemental Agreement for work within scope P00007 · S millrace ECO restoration phase 2 const $0
Supplemental Agreement for work within scope P00007 · PH2 springfield millrace construction -- $109,140
Supplemental Agreement for work within scope P00006 · Arra::yes::arra recoveryproject#::114785::RP# springfield millrace - MOD not arra funded $187,000
Supplemental Agreement for work within scope P00006 $0
Supplemental Agreement for work within scope P00005 · S millrace ECO restoration phase 2 const $0
Supplemental Agreement for work within scope P00005 · PH2 springfield millrace construction -- design a headwall and fish screen system along the north bank of the mill race at STA 3+87.08. $14,245
Supplemental Agreement for work within scope P00004 · Arra::yes::arra recoveryproject#::114785::RP# springfield millrace - pipe extension, RIP RAP outfall. $1
Supplemental Agreement for work within scope P00004 · PH2 springfield millrace construction -- $14,999
Supplemental Agreement for work within scope P00003 · Springfield millrace $0
Supplemental Agreement for work within scope P00003 · Arra::yes::arra recoveryproject#::114785::RP# springfield millrace - no cost MOD to revise plantings $0
Change Order P00002 · PH2 springfield millrace construction -- $121,000
Change Order P00002 · S millrace ECO restoration phase 2 const $0
Change Order P00001 · PH2 springfield millrace construction -- $32,143
Change Order P00001 · S millrace ECO restoration phase 2 const $0
Modification $803,782
Original award Arra - project number 114785: restoration project that includes replacement of the diversion culverts and sluice gates to gorrie creek and the installation of… $1,279,175
Show all 18

About this award

This contract was awarded by the U.S. Department of Defense to Just Bucket Excavating, Inc. (JBE), a minority-owned, self-certified small disadvantaged business. The $1,279,176.34 firm-fixed-price contract is for the Springfield Millrace Construction project, which involves the replacement of diversion culverts and sluice gates, installation of fish screens, bank slope reduction, mill dam and bridge removal, storm water system upgrades, wetland creation, and the addition of recreation features. This work is being performed in Springfield, Oregon. The contract was awarded as an 8(a) sole source set-aside. JBE has previously served as a prime contractor for the U.S. Department of Agriculture Forest Service, performing road construction, asphalt repair, and other infrastructure projects.

Description

Springfield millrace construction -- replacement of the diversion culverts and sluice gates to gorrie creek and the installation of fish screens; placing fill material to reduce bank slope and channel width between f street bridge and the mill pond to match the rest of the millrace channel and provide a buffer from the lumber mill; removal of the mill DAM and bridge and associated sheet piling, fill, fish ladder, and retaining walls; cutting back storm drain outfalls near the mill DAM and routing existing subsurface vault outlets into two storm water detention basins designed to treat storm water from the booth-kelly site prior to discharge into the mill race; excavation and grading of a new mill race channel through the mill pond and creation of wetlands and backwater sloughs; creation of an off-line fire protection pond with inlet culvert, fish screen, and backflow valve adjacent to the upper end of the mill pond area; excavation and grading to flatten the left bank between the mill DAM and 7TH street bridge; wetland and riparian RE-vegetation/restoration in former mill pond area and surroundings on public lands; and recreation features including a pervious concrete and boardwalk loop trail, and educational/interpretive signage kiosks at the mill pond area.

Quick answers

Who was awarded contract W9127N10C0024?

W9127N10C0024 was awarded to Just Bucket Excavating, Inc. by ENDIST Portland (US Army Corps of Engineers) on April 16, 2010.

How much is contract W9127N10C0024 worth?

The government has obligated $2,671,754 on W9127N10C0024. Its current value, with exercised options, is $1,279,176.

Was contract W9127N10C0024 competed?

The extent of competition for W9127N10C0024 was not available for competition. The government received 1 offer. It was set aside: 8(a) Sole Source.

On GovTribe

See this award's full record

  • Every transaction and funding action
  • The awardee's other awards and teaming partners
  • Similar awards and recompete opportunities
  • Ask GovTribe AI about this award