Supplemental Agreement for work within scope
P00004 · P00004/SA-232 - adjust vent piping, check all steam traps, adjust RE-set the tank floats, repair damaged pump controller.
$7,629
Supplemental Agreement for work within scope
P00003 · P00003/SA-231 - install an auto cooler and trap primer in the condensate receiver tank overflow pipe.
$6,635
Supplemental Agreement for work within scope
SA230 · Finalize the bond premium as adjusted for contract modifications per vaar 852.236-88.
$15,123
Supplemental Agreement for work within scope
SA229 · Definitizes CO-03W = $2,962.00 dated 7-20-2012. Provide plumber resources to diagnose and rebalance the hot water heating system for the inpatient floors.…
$29,251
Supplemental Agreement for work within scope
SA228 · Definitizes CO-03V = $39,084.00 dated 5-11-2012. Install sound dampening duct work in eight hearing aid fitting rooms and one office. Install on SA, RA and wrap…
-$17,403
Supplemental Agreement for work within scope
CO03W · The domestic hot water heating system is not performing properly and requires investigation and service from the mechanical subcontractor.
$2,962
Supplemental Agreement for work within scope
CO03V · Install sound silencers at eight rooms at the second floor of building 29 audiology area.
$39,084
Supplemental Agreement for work within scope
SA227 · During inspection and review of the sound readings of 8 (eight) of the audiology rooms IT was noticed that the rooms NC rating was above normal.
$495
Supplemental Agreement for work within scope
SA225 · Ductwork needed to be reconfigured due to existing ceiling congestion.
$27,764
Supplemental Agreement for work within scope
SA224 · RFI 942 requested information from the owner to provide exact location of the off normal temperature alarm panel. Per RE response on 6/30/11 and after review…
$1,000
Supplemental Agreement for work within scope
SA223 · During review of RFI 818 IT was noted that the contract drawing showed the muffler thru a wall but the mufflers needed to be run thru a louver in the wall.…
$5,714
Supplemental Agreement for work within scope
SA202 · Corridor XMC102 is 4'-0" over the allowable dead end corridor dimensions, therefore, a wall and door with a line of sight needs to be installed.
$14,200
Supplemental Agreement for work within scope
SA221 · The amount of phases necessary to complete the existing lobby terrazzo work exceeded the amount included in the contract.
$26,000
Supplemental Agreement for work within scope
SA217 · During review of RFI 900 the AE failed to show in the drawings the emergency vents of the day tank for the generator.
$1,001
Supplemental Agreement for work within scope
SA218 · The VAMC installed the audio booths that were previously the responsibility of the contractor. The resident's engineers trailer will not be relocated because IT…
$0
Supplemental Agreement for work within scope
SA216 · During initial testing of the generator the outside air louvers of the generator room were not adjusted to open on the appropriate time interval and the…
$2,970
Supplemental Agreement for work within scope
SA222 · The project contractor submitted rfis 796, 907 and 925 requesting details for constructing the crossover tie-in from bldg 29 stair #M7 to stair #3 of adjacent…
$23,864
Supplemental Agreement for work within scope
SA215 · The CDS show two leaves @ the inpatient doors on the 3FL-5FL. The flush bolt on the inactive leaf poses a hanging potential. Also, the collapsible stop detail…
$6,000
Supplemental Agreement for work within scope
SA220 · Contract documents were incorrectly designed to comply with IBC standards rather than nfpa.
$18,000
Supplemental Agreement for work within scope
SA219 · VAV boxes in the 1FL lobby of the existing hospital were found to be in the location shown on the contract documents and they needed to be moved in order to…
$1,138
Supplemental Agreement for work within scope
SA214 · The medical center has approximately 1050 occupants during peak occupancy. To achieve leed certification additional bicycle racks are needed.
$2,097
Change Order
CO03T · During initial testing of the generator the outside air louvers of the generator room were not adjusted to open on the appropriate time interval and the…
$10,530
Supplemental Agreement for work within scope
SA212 · The addition of security walls were necessary in order to isolate ongoing construction activities after turning the CB #29 to the medical center.
$6,135
Change Order
CO03U · Contract documents were incorrectly designed to comply with IBC standards rather than nfpa standards.
$61,000
Supplemental Agreement for work within scope
SA213 · Openings were made for doorways into existing bldg #1 for connection to the new building #29. Additional masonry and steel framing was required and was not…
$10,440
Change Order
CO03S · In november 2010 the VAMC indicated that the lobby flooring work that was shown for the existing b#1 1FL on the CDS would be required to take place in 9…
$67,735
Supplemental Agreement for work within scope
SA211 · During inspection of bldg #29 IT was noted that the outside lighting of the contiguous bldg #31 was not acceptable to serve as outside lighting for the two…
$3,764
Supplemental Agreement for work within scope
SA210 · Changes in flooring at corridor south of starbucks were done to accommodate future VAMC projects that would widen the corridor in question. Changes between…
$763
Supplemental Agreement for work within scope
SA209 · The cap piece of the self coving sheet rubber is held in place by double face paper tape. Around the plumbing fixtures and bathroom mirrors, there is a large…
$1,808
Supplemental Agreement for work within scope
SA207 · RFI 937 addressed the layout info for the flag pole light. The RE response deleted the type Y1 in ground light fixtures and replaced with beacon fixture…
$3,336
Supplemental Agreement for work within scope
SA208 · During installation of the enunciator panels for the fire alarm panel IT was noticed that the existing enunciator panels serving the police was not configured…
$4,388
Supplemental Agreement for work within scope
SA206 · Contract drawings did not provide details for waterproofing the fountains at the plaza.
$10,120
Supplemental Agreement for work within scope
SA205 · RFI 399 addressed the conflict with the tie-in of the first floor vestibule (adjacent to stair M4) and stair 7 of the existing building. The response included a…
$964
Supplemental Agreement for work within scope
SA204 · During review of the marlite wall panels details the VAMC questioned the use of porcelain base on the floors, because IT created a joint for bacteria to grow.…
$20,323
Supplemental Agreement for work within scope
SA203 · Contract drawings show wood paneling in areas that did not need the paneling.
-$19,486
Supplemental Agreement for work within scope
SA199 · The size font specified by the contract for the exterior TRI-sign located at the intersection of breckenridge avenue and university drive was found to be too…
$1,275
Supplemental Agreement for work within scope
SA201 · Provide additional limestone and brick veneer at the patient toilet room windows on floors 3,4 and 5 as a result of reduced window size at 11 (eleven) locations…
$17,493
Supplemental Agreement for work within scope
SA200 · The window between the nurse workroom XM160A and the nurse station XM160 on the day side of the inpatient floors (area b) was designed as a small sliding…
$0
Supplemental Agreement for work within scope
SA198 · A previous change in ceiling height lowered the ceiling height in the atrium causing obstruction of the access to the sliding door's operating equipment. As a…
$1,652
Supplemental Agreement for work within scope
SA190 · Contract documents did not correctly incorporate nfpa 101 life safety code requirements. Revisions were made to the a, m, p & e drawings.
-$46,955
Supplemental Agreement for work within scope
SA195 · During the RE review of the hollow metal door frame submittal, IT was discovered that the door sizes were 3'-0" for patient care areas in lieu of the…
$4,787
Supplemental Agreement for work within scope
SA197 · The contract documents indicate that the studs shall be installed on 24" centers. When the RE questioned the spacing, the AE responded that due to deck to…
$45,000
Supplemental Agreement for work within scope
SA196 · An existing fire hydrant was too high and not oriented correctly for fire department access after final sidewalk elevations were complete and CB#29 fence was in…
$674
Supplemental Agreement for work within scope
SA191 · The contract documents showed a lever lockset and butt hinges at the inpatient shower room doors. This type of hardware poses a hanging risk and IT is…
$11,236
Supplemental Agreement for work within scope
SA194 · During inspection of the bathroom floor sub base IT was found that the existing sub base was not suitable to the new epoxy terrazzo floor to be installed. Per…
$2,195
Supplemental Agreement for work within scope
SA193 · The columns in the existing building (bldg 1) did not have spray on fire proofing at columns 34F, 34G, 35F, 37G, 38G and 40G.
$1,884
Supplemental Agreement for work within scope
SA192 · During initial testing of the generator the outside air louvers of the generator room were not adjusted to open on time and the generator room interior wall…
$645
Supplemental Agreement for work within scope
SA188 · The contractor identified existing medical gas alarm wiring in the b#1 lobby as an obstruction to their work in the same area (RFI #877).
$2,000
Supplemental Agreement for work within scope
SA189 · During elevator inspection IT was noted that the light fixtures specified were not nema 4 weatherproof type fixtures as required in the asme 17 code for the…
$0
Supplemental Agreement for work within scope
SA187 · RFI 941 noted that exterior 3X103 received a 3/16" SST bent plate over the raised sill and that exterior doors 3X106, RMS104A and PM107 did not have raised…
This is a firm fixed-price definitive contract awarded by the VA Office of Construction and Facilities Management, a civilian agency, to P.J. Dick Incorporated, a for-profit S corporation, for the CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING project in Pittsburgh, Pennsylvania. The contract has a ceiling value of $78,412,208.00 and an ultimate completion date of August 12, 2011. The contract was awarded on November 12, 2008 and does not have a set-aside designation.
Quick answers
Who was awarded contract VA101CFMC0014?
VA101CFMC0014 was awarded to P.j. Dick Incorporated by VA Office of Construction and Facilities Management (Headquarters) on November 12, 2008.
How much is contract VA101CFMC0014 worth?
The government has obligated $78,412,168 on VA101CFMC0014. Its current value, with exercised options, is $78,412,208.
Was contract VA101CFMC0014 competed?
The extent of competition for VA101CFMC0014 was full and open competition. The government received 3 offers.