Definitive Contract INPC8826100022
Award Date 5/10/10
Potential Completion Date 2/21/11
Potential Value $5.8M
Funding Federal Agency
Contracting Federal Agency
Ultimate Awardee
Not listed PSC Category
Set-Aside Type
Competitive 8(a)
Federal Contract Vehicle
- Not listed
Extent Competed
Full and Open Competition after exclusion of sources
Major Defense Program
Not listed Pricing Type
Firm Fixed Price
Place of Performance
Yosemite National Park, California, USA
Solicitation Procedures
Two Step
Number Of Offers Received
4
Legislative Mandate
Davis Bacon Act
National Interest Action
Not listed Research Type
Not listed Primary Consortia Member
Not listed Similar Awards
- This is a federal contract award from the National Park Service, Pacific West Region (an agency of the Department of the Interior), to Richard P. Arber Associates, Inc., a veteran-owned small business. The $68,739.00 contract is for "RECOVERY YOSE 079595 TITLE III SERVICES FOR SOLAR EQUIPMENT AT EL PORTAL COMPLEX, YOSEMITE NATIONAL PARK". It is a time and materials delivery order contract with a period of performance ending on February 28, 2011. The contract was set aside for small...
- This is a federal contract award from the U.S. government to Richard P. Arber Associates, Inc., a veteran-owned business, for architect and engineering services related to the installation of a photovoltaic (PV) system at the El Portal Complex in Yosemite National Park. The contract is a delivery order with a time and materials pricing type, a ceiling value of $124,065.00, and a completion date of June 30, 2010. The contract does not have a set-aside designation. The award is for preliminary...
- <p>The U.S. Department of the Interior, National Park Service awarded a $168,050.32 firm-fixed-price delivery order contract to J.R. Conkey & Associates, Inc. (doing business as Solar Power Integrators), a woman-owned small business. The contract is for the design and installation of five photovoltaic systems to generate solar energy at various locations within the Point Reyes National Seashore in Marin County, California. The contract was set aside for small businesses.</p>
- This is a $6,196,413.10 firm fixed-price definitive contract awarded by the National Park Service's Pacific West Region to Aci-Jig Joint Venture, a small business vendor, for the rehabilitation of the Yosemite Valley Emergency Services Complex in Yosemite National Park, California. The project includes electrical, mechanical, plumbing, fire suppression, structural, accessibility, egress, and seismic improvements, as well as reconfiguration of the building to optimize space and improve ADA...
- The National Park Service awarded Big Valley Electric a $6.89 million firm fixed-price definitive contract on September 15, 2022, to replace severely deficient and non-code compliant electrical distribution systems serving three camps in Yosemite National Park: Ranger Camp West, Ranger Camp East, and Bug Camp. The work is designated as a total small business set-aside and must be completed by February 24, 2026. Big Valley Electric, a self-certified small disadvantaged business and sole...
- The U.S. National Park Service, Pacific West Region, awarded a firm-fixed-price purchase order contract worth $85,973.00 to Gold Electric Inc. for the El Portal Lift Station Upgrade project in Yosemite National Park, Mariposa County, California. The contract has an ultimate completion date of February 15, 2023. The contract was awarded on August 9, 2022 and was not set aside for any small business program. The original federal contract opportunity was a small business set-aside solicitation...
- The National Park Service awarded a $19,276.71 firm fixed-price purchase order to Specialized Government Sourcing, Inc., a woman-owned small business based in Aliso Viejo, California, for the supply and delivery of various building materials to Yosemite National Park. The contract, designated as a 100% total small business set-aside, encompasses 59 line items of construction materials organized into three distinct bundles for different park locations: Valley Buildings and Grounds, Wawona...
- The National Park Service issued a delivery order to Project Solutions, Inc., a SBA-certified women-owned small business, on August 5, 2025, with a ceiling value of $2,695,271.65 for construction management services at Yosemite's El Portal wastewater treatment facility and administrative camp construction project. The order is issued under the General Services Administration's Multiple Award Schedule (MAS). Place of performance is Rapid City, SD 57701, with an ultimate completion date of...
- The National Park Service awarded a purchase order to Specialized Government Sourcing, Inc., a woman-owned small business, for $86,598.30 in electrical supplies for Yosemite National Park on June 11, 2026, with ultimate completion by July 17, 2026. The order carries a total small business set-aside under NAICS 335931. Work is performed at El Portal, California. The procurement spans five bundles totaling 368 line items of residential electrical products, organized by building group (EPBG,...
- <p>This is a firm fixed-price delivery order awarded by the National Park Service (NPS), Pacific West Region, to J.R. Conkey & Associates, Inc. (doing business as Solar Power Integrators), a small, woman-owned, disadvantaged business. The contract, valued at $467,430, is to replace solar components, including the installation of a new photovoltaic system, at Joshua Tree National Park. The award was set aside for total small business participation.</p>
This is a $5,833,046.00 firm fixed price, definitive contract awarded by the National Park Service, Pacific West Region, to Paragon Industrial Applications, a minority-owned, woman-owned small business. The contract is for the design and construction of a solar equipment installation project at the El Portal Complex in Yosemite National Park. The contract was competitively set aside for 8(a) small businesses. The project is part of the "RECOVERY YOSE PMIS 079595" program, which appears to be an American Recovery and Reinvestment Act (ARRA) funded effort to install renewable energy systems in national parks.
Generated 4/2/25, 9:57 AM
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| 4 | Other Administrative Action | $0 | 3/1/11 | |
| 3 | Supplemental Agreement for work within scope | $99.2k | 1/13/11 | |
| 2 | Supplemental Agreement for work within scope | $1.4m | 9/14/10 | |
| 1 | Other Administrative Action | $0 | 7/19/10 | |
| Not listed | Not listed | $4.3m | 5/10/10 |