Definitive Contract INP12PC40660

Award Date 9/1/12
Potential Completion Date 4/30/13
Potential Value $256K
Federal Agency
Pacific West Region
Ultimate Awardee
Not listed
Federal Contract Vehicle
Set-Aside Type
8(a) Sole Source
Extent Competed
Not Available for Competition
Major Defense Program
Not listed
Pricing Type
Firm Fixed Price
Place of Performance
DEATH VALLEY, CA 92328, USA
Solicitation Procedures
Only One Source
Number Of Offers Received
1
Legislative Mandate
Davis Bacon Act
National Interest Action
Not listed
Research Type
Not listed
Primary Consortia Member
Not listed
Similar Awards
The National Park Service (NPS) has awarded a firm-fixed-price purchase order contract to Copper Mountain Services LLC, a self-certified small disadvantaged, veteran-owned, and service-disabled veteran-owned small business, for the repair of the Furnace Creek Landfill Cap and associated drainage at Death Valley National Park in California. The $197,000.00 contract has a performance period ending on May 1, 2025. This award was the result of a full and open competition solicitation and is not...
This is a firm fixed-price delivery order contract awarded by the National Office, a civilian federal agency, to Innovar Environmental, Inc., a minority-owned, small disadvantaged business. The contract has a total ceiling value of $588,881.43 and is for the installation of safety closures at abandoned mines in Death Valley, California to protect visitors and preserve natural resources. The contract was set aside for the HUBZone program. No additional details about major subcontractors or the...
This federal contract award, INP10PC60919|INPT8136100051, was issued by the National Office of the federal agency to Nfirmc Joint Venture for the installation of safety closures at abandoned mines in Death Valley, California. The $952,981.00 Firm Fixed Price Delivery Order contract has a completion date of March 18, 2011 and was set aside for competition through the 8(a) program. The contract is for the RECOVERY DEVA 148432 project to protect visitors and preserve resources at the abandoned mine...
The Department of the Interior National Park Service Pacific West Region awarded a $407,084 firm fixed price contract to Copper Mountain Services LLC for replacing a failing water well at Stovepipe Wells in Death Valley National Park. The solicitation sought proposals to drill a new replacement well, replace pumps at two additional wells, and abandon two existing wells to address a failing water well providing water to Stovepipe Wells. Set aside for total small businesses with a North American...
The Department of the Interior National Park Service Pacific West Region awarded a $61,569.20 firm fixed price delivery order contract to Dj&A, P.C. to provide Title I scoping services for the rehabilitation of deteriorated utilities and water distribution systems at campground sites in Death Valley National Park, California. Under the contract, Dj&A, P.C. will assess and document the requirements for upgrading and replacing infrastructure at the park's Grapevine RV sites to address...
The National Park Service (NPS) awarded a $395,601.27 firm-fixed-price delivery order contract to Nfirmc Joint Venture, a competitive 8(a) small business, to undertake a series of abandoned mine land (AML) closure projects at three National Park units in Arizona and one in Montana. The purpose is to improve human health and safety while protecting natural and cultural resources at these AML sites, which typically include features such as shafts, adits, tunnels, and other openings left from...
This is a firm fixed-price purchase order contract awarded by the National Park Service's Pacific West Region to Thomas Rupp, doing business as Dimensional Images, a self-certified small disadvantaged business. The $20,569.94 contract is for the repair and replacement of various tactile exhibit features at the Furnace Creek Visitor Center in Death Valley National Park, California. The contract involves rehabilitating mine rock scenery, animal touch exhibits, alluvial fan exhibits, rock...
The Department of the Interior National Park Service Pacific West Region awarded a $246,000 firm fixed price purchase order to Copper Mountain Services LLC for jetting of sewage systems at Death Valley National Park. The work is to be performed between September 15, 2023 and November 4, 2023. The contract has a total small business set aside designation. Copper Mountain Services will deliver sewage jetting services to support infrastructure maintenance activities at Death Valley National Park, a...
<p>This is a firm fixed-price delivery order awarded by the National Park Service, Pacific West Region (a civilian federal agency) to Amec E&amp;I, Inc. under the GSA Environmental Services (FSS-899) Schedule contract. The contract is for $138,555.00 to conduct post-closure Bat Acoustic Monitoring and Inventory (BAT) surveys at abandoned mine features in Death Valley National Park. The contract was solicited through the GSA eBuy program and does not have a set-aside designation.</p>
<p>This is a firm fixed price delivery order contract awarded by the National Office, a civilian agency, to Nfirmc Joint Venture, a small business under the 8(a) set-aside program. The contract is for $853,895.00 to install safety closures and preserve resources at Death Valley, California. The contract has an ultimate completion date of February 23, 2011.</p>

I. INTRODUCTION DEATH VALLEY NATIONAL PARK IS LOCATED IN THE NORTHERN MOJAVE DESERT, APPROXIMATELY 120 MILES WEST OF LAS VEGAS, NEVADA. THE PARK WAS FIRST ESTABLISHED AS A NATIONAL MONUMENT IN 1933 AND THEN EXPANDED AND GIVEN PARK STATUS UNDER THE CALIFORNIA DESERT PROTECTION ACT (CDPA) IN 1994. WITH MORE THAN 3.3 MILLION ACRES, DEATH VALLEY IS THE LARGEST NATIONAL PARK IN THE LOWER FORTY EIGHT STATES. DEATH VALLEY ALSO HAS THE MOST MINES OF ANY SINGLE NATIONAL PARK SERVICE UNIT, AND A MINING HISTORY THAT SPANS MORE THAN 150 YEARS. THIS PROJECT FOCUSES ON ONE MINE SITE: MARBLE CANYON AT THE NORTH END OF THE PARK. THIS SITE WAS CHOSEN DUE TO ITS ACCESSIBILITY AND VISITOR USE. ACCESS TO MARBLE CANYON IS ALONG SEVERAL MILES OF DIRT ROADS, BOTH MAINTAINED AND UNMAINTAINED. THE MINE MITIGATIONS ARE INTENDED TO MAKE THE FEATURES SAFE AND INACCESSIBLE TO VISITOR ENTRY, WHILE PRESERVING WILDLIFE HABITAT AND CULTURAL RESOURCES AT THESE SITES. II. PURPOSE THE PURPOSE OF THIS SCOPE OF WORK IS TO PERFORM MITIGATIONS. FIELDWORK IS ANTICIPATED TO BEGIN ON OR ABOUT OCTOBER 1, 2012. III. PROJECT DESCRIPTION THE CONTRACTOR SHALL PROVIDE ALL LABOR, EQUIPMENT, AND SERVICES TO PERFORM ALL TASKS REQUIRED FOR MAKING THE IDENTIFIED MINE FEATURES SAFE AT THE MINE SITES. THE SCOPE OF WORK CONSISTS OF THE FOLLOWING; HOWEVER, THE CONTRACTOR MAY SUBMIT ALTERNATIVE CLOSURE METHODS FOR EACH FEATURE: 1. OPERATE WITHIN THE PROJECT AREA IN ACCORDANCE WITH CAL OSHA REQUIREMENTS. 2. INSURE THAT WILDLIFE IS EXCLUDED FROM UNDERGROUND FEATURES AS NECESSARY BEFORE AND DURING WORK. 3. REMOVE AND REPLACE AS NECESSARY, SAFETY FENCES OR CABLE NETS AS NEEDED TO PERFORM THE FOLLOWING WORK. 4. ALL CLOSURE WORK WILL BE COMPLETED PURSUANT TO THE SET OF ESTABLISHED NPS SPECIFICATIONS FOR SUCH CLOSURES (ATTACHMENT B), MODIFIED AS NEEDED TO SUIT THE PARTICULAR APPLICATION. THE INTENT OF THE MITIGATION IS TO ELIMINATE HUMAN ACCESS/ENTRANCE TO HAZARDOUS MINE FEATURES WITH MINIMAL DAMAGE TO HISTORIC FABRIC WHERE PRESENT, WHILE ALSO PROVIDING FOR CONTINUED USE BY BATS AND/OR OTHER WILDLIFE, SUCH AS OWLS. 5. AT THE SHAFTS, DECLINES, AND STOPES INSTALL BAT COMPATIBLE STRUCTURES ON BEDROCK OR CONCRETE FOOTINGS 6 INCHES WIDE AND 12 INCHES THICK WITH 2 #4 REBARS PLACED AT LEAST 3 INCHES ABOVE THE GROUND ON THE OPEN SHAFTS/DECLINES AND OPEN STOPE AREAS. THESE SHALL BE PLACED SO THAT GENERALLY A MINIMUM OF 2 FEET REMAINS BETWEEN THE CONCRETE AND THE EDGE OF THE HOLE. WHERE ROCK PREVENTS AT LEAST A 6 PENETRATION, ANCHOR PINS WILL BE INSERTED INTO THE ROCK. 6. ROCK AND DIRT WILL BE REMOVED WHERE ADITS HAVE ROCK DEBRIS IN THE ACCESS TRENCH WHICH PREVENTS SAFE MOVEMENT OF PEOPLE, EQUIPMENT, AND SUPPLIES TO THE WORK AREA. HAND LABOR AND WHEEL BARROWS WILL BE USED SINCE THE ACCESS TRENCHES TO THE ADITS ARE GENERALLY ONLY 4` WIDE AND OFTEN WITHOUT ROAD ACCESS. CLEAN OUT THE PORTALS AND INSTALL A BAT COMPATIBLE STEEL CLOSURE IN THE ADITS. THE GATES WILL BE BUILT TO ALLOW PASSAGE BY BATS WHILE PREVENTING UNAUTHORIZED ACCESS BY HUMANS AND SHALL HAVE A REMOVABLE BAR PLACED AT LEAST 3 FEET ABOVE THE ADIT FLOOR. THE BAR SHALL BE SECURED WITH TWO MCGUARD BOLTS. 7. REMOVE AND PROPERLY DISPOSE OF ANY CONSTRUCTION DEBRIS.