Stillwater pass road slump repair project due: august 11, 2008, 16:00 local time description: a section of nfsr 123 stillwater pass road has failed (loss of road shoulder) and has restricted the width…
Ended Definitive Contract Awarded Last action
- Contract number
- AG82X9C080251
- Awardee
-
J.p. Meyer Trucking And Construction, Inc. UEI JQJ4KKQN6HJ8
- Awarding agency
-
Region 2 - Rocky Mountain Region
Forest Service, Department of Agriculture
- Obligated
- $239,496
Award facts
- Opportunity
-
- AG82X9S080212 Solicitation number
- Stillwater Slump Repair Award Notice · Posted Jun 27, 2008
- Contract value 100% obligated
- $239,496.36 Current and potential, with all options
- Completion date 100% complete
- Current and potential, with all options
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- PSC
- Not on record
- Set-aside
- Total Small Business
- Competition
- Full and Open Competition after exclusion of sources · 4 offers Negotiated Proposal / Quote
- Pricing
- Firm Fixed Price
- Place of performance
- Granby, CO 80446, USA
- Legislative mandates
-
- Davis-Bacon Act FAR subpart 22.4
Award details come from SAM.gov/FPDS.
Transactions
| Action | Obligated | Date |
|---|---|---|
| Change Order | $41,172 | |
| Change Order | $8,060 | |
| Change Order | $4,010 | |
| Supplemental Agreement for work within scope | $9,100 | |
| Original award | $177,154 |
Description
Stillwater pass road slump repair project due: august 11, 2008, 16:00 local time description: a section of nfsr 123 stillwater pass road has failed (loss of road shoulder) and has restricted the width of this two lane gravel road to one lane for about 0.1 miles. This work required includes the reconstruction of approximately 0.1 miles of the road with a deep french drain installed on the upside of the road. Work items include, but are not limited to, removal of existing soil nails, excavation and embankment, aggregate base, traffic control, temporary erosion control, french drain construction, trenching, geotextiles, RIP RAP, culvert installation, clay linears, and hydroseeding. Location: from granby, colorado travel north along state highway 40 approximately one mile to the intersection with state highway 34. Then travel north along 34 approximately nine miles to the intersection with nfsr 125 (stillwater pass road/grand county road 4) then west approximately seven mile to the road slump area. Project time: 90 days. Estimated state of work date: as soon as practicable after award. Price range: the government price range for this project is between $100,000 and $250,000. Pre-proposal meeting: a pre-proposal meeting will be held july 10, 2008 at 10:00 local time. The meeting will be held at the sulphur ranger district office located at 9 ten mile drive, granby, colorado. All those planning to attend must rsvp with christina schofield on or before 16:00 july 8, 2008 by calling 970-295-66353 all offerors must be registered in the central contractor s registry (CCR) in accordance with far 52.204-7 to be considered responsive to this solicitation. All offerors must be registered in orca in accordance with far 52.204-8 to be considered responsive to this solicitation. All offerors must respond to the evaluation criteria under section m to be considered responsive to this solicitation
Quick answers
Who was awarded contract AG82X9C080251?
AG82X9C080251 was awarded to J.p. Meyer Trucking And Construction, Inc. by Region 2 - Rocky Mountain Region (Forest Service) on September 11, 2008.
How much is contract AG82X9C080251 worth?
The government has obligated $239,496 on AG82X9C080251.
Was contract AG82X9C080251 competed?
The extent of competition for AG82X9C080251 was full and open competition after exclusion of sources. The government received 4 offers. It was set aside: Total Small Business.
On GovTribe
See this award's full record
- Every transaction and funding action
- The awardee's other awards and teaming partners
- Similar awards and recompete opportunities
- Ask GovTribe AI about this award