Definitive Contract AG4283C120008

Award Date 8/28/12
Potential Completion Date 9/28/12
Potential Value $138K
Ultimate Awardee
Not listed
Federal Contract Vehicle
Set-Aside Type
Total Small Business
Extent Competed
Full and Open Competition after exclusion of sources
Major Defense Program
Not listed
Pricing Type
Firm Fixed Price
Place of Performance
Bristol, FL 32321, USA
Solicitation Procedures
Negotiated Proposal / Quote
Number Of Offers Received
6
Legislative Mandate
Davis Bacon Act
National Interest Action
Not listed
Research Type
Not listed
Primary Consortia Member
Not listed
Similar Awards
The Department of Agriculture Forest Service awarded a $498,920.95 firm-fixed-price contract to Rogers Brothers Land Clearing LLC for reconstruction of multiple roads within the Apalachicola National Forests in Crawfordville, Florida. The work, requested under solicitation number 12445521B0003, involves clearing debris, repairing drainage ditches and culverts, reconditioning roadbeds, and replacing eroded aggregate and limerock on roads damaged within the Apalachicola National Forest. The...
Anderson Columbia Co Inc. was awarded a $1,559,203.20 firm fixed price definitive contract by the USDA Forest Service Southern Region to perform slope stabilization work on the Apalachicola National Forest in Liberty County, Florida. Under the contract, the prime contractor will furnish all necessary equipment, materials, supplies, tools, labor, transportation, supervision and other miscellaneous work to complete FH13 slope stabilization in accordance with the FP-03 Standard Specifications and...
The Department of Agriculture Forest Service Southern Region awarded a $783,989 firm fixed price construction contract to Hydra Engineering & Construction, LLC. The contract calls for road construction and culvert replacement services on National Forest System Roads 74-4.6 and 74-5.7 located near Salt Springs, Florida. Specifically, the contractor will perform erosion control installation, culvert replacement, geosynthetics placement, aggregate base material provision, roadbed...
The Department of Agriculture Forest Service R4-Intermountain Region awarded a $163,996.36 firm fixed price delivery order to Harrison Oilfield Services Inc., a certified HUBZone small business concern, to haul and deliver 2,500 cubic yards of 2-3 foot riprap and one 72-inch by 40-foot culvert to selected locations along the Pack Creek Road for stabilization work. This delivery order is not associated with a larger contract vehicle. The work is intended to support infrastructure upgrades that...
The Department of Agriculture Forest Service awarded a $359,990 firm fixed price contract to Durable Piling Restoration, L.L.C. to complete the Black Creek Bridge Repair Construction project located in Bristol, Florida. The work is being conducted under the Great American Outdoors Act major program and is funded by the USDA Forest Service Southern Region. The original solicitation sought bids for bridge repair work as specified in the opportunity. Hydra Engineering & Construction, LLC...
This is a firm fixed-price delivery order contract awarded by the U.S. Department of Agriculture (USDA) Forest Service to Paraclete Maintenance & Design, LLC, a minority-owned, small disadvantaged, woman-owned, veteran-owned, and Asian-Pacific American-owned limited liability company based in Woodworth, Louisiana. The contract, valued at $94,604.00, is for the excavation and replacement of a 36-inch reinforced concrete culvert on National Forest System Road 145. Paraclete Maintenance &...
This is a firm-fixed price contract awarded by the Department of Agriculture Forest Service R8-Southern Region to GC Works Inc., an 8(a) and HUBZone certified small disadvantaged business, for the NFSR 601 Culvert Replacement project on the Talladega National Forest in Alabama. The $691,903.97 contract requires the removal of the existing low water crossing structure and the design and construction of a new 35-foot span by 13.5-foot rise aluminum box culvert, along with associated guardrails,...
The Department of Agriculture Forest Service awarded a firm fixed price contract valued at $1,058,483.64 to R.o.t Ranch Construction, Inc. to provide Briar Patch Road Maintenance services in the Apalachicola National Forest in Bristol, Florida. The contract is a 100% set-aside for small businesses. Work will involve soil erosion control, culvert replacement and installation, construction of a low water crossing, roadway aggregate placement, and temporary traffic control. Funding is being...
This is a $127,640.00 firm fixed-price definitive contract awarded by the U.S. Forest Service, Southern Region, to Hydra Engineering & Construction, LLC, a certified woman-owned small business and self-certified small disadvantaged business based in Crawfordville, Florida. The contract is for the replacement of an existing culvert on Forest Service Road 39, Duncan Ridge Road, that crosses Pretty Branch. The contract has an 8(a) sole source set-aside designation and a completion date of...
This is a $9,149,866.06 firm fixed-price definitive contract awarded by the U.S. Army Corps of Engineers (USACE) Engineering District Jacksonville (ENDIST Jacksonville) to Douglas N. Higgins Inc., a small business contractor. The contract is for the Picayune Strand Restoration Project, US41 and CR92 Conveyance Features Design-Build, which involves the design and construction of new concrete box culverts under U.S. Route 41 (US41) and County Road 92 (CR92/San Marco Drive) in Collier County,...

FURNISH ALL OF THE NECESSARY EQUIPMENT, MATERIALS, SUPPLIES, TOOLS, LABOR, TRANSPORTATION, SUPERVISION AND OTHER MISCELLANEOUS WORK NECESSARY FOR THE FH13 BOX CULVERT REPAIR AND RESURFACING ON THE APALACHICOLA NATIONAL FOREST, LIBERTY COUNTY, FL IN ACCORDANCE WITH THE ATTACHED SPECIFICATIONS AND DRAWINGS.

Posted 8/28/12, 12:00 AM