The General Services Administration's Public Buildings Service Region 10 awarded Orion Construction, Inc. a $21,287 firm fixed price delivery order to replace the exterior concrete stairs and landings in their entirety at two locations of the Juneau Federal Building in Juneau, Alaska. Due to deterioration of the concrete, Orion Construction will remove and replace the exterior concrete stairs and upper and lower landings. No set aside designation or subcontractors were identified. The work is to...
The USDA Forest Service, Alaska Region awarded a $972,907 firm fixed price definite contract to Rainforest Contracting Inc. to reconstruct the Anan Wildlife Observatory facilities in Wrangell, Alaska. Per the solicitation, the contractor will demolish and remove existing timber observation decks and stair structures, relocate structures, demolish part of an aggregate trail, and construct new footings, decks, shelters, trails and signs. Optional work includes temporary connector stairs,...
<p>This is a $246,985.93 firm fixed price definitive contract awarded by the United States Forest Service Northern Research Station, a civilian agency, to L.R. Costanzo Company, Incorporated, a for-profit Subchapter S corporation, for the reconstruction of stairs including construction detailing, shop drawings, fabrication, and installation of a new stair system and associated site work. The contract does not have a set-aside designation and the ultimate completion date is May 27, 2011.</p>
The Department of the Interior Fish and Wildlife Service awarded a $368,711 firm fixed price contract to DSL Builders LLC for construction services at the Oregon Islands National Wildlife Refuge in Bandon, Oregon. The contract calls for DSL Builders to replace and repair stair structures at the Coquille Point South site, including replacing 17 concrete stair treads with stainless steel grating treads across eight stair runs, installing longitudinal bracing along the stairway, demolishing and...
Orion Construction, Inc., doing business as Orion Construction Inc., has been awarded a firm fixed-price delivery order valued at fifty-seven thousand one hundred fifty-eight dollars and forty cents ($57,158.40) by the General Services Administration's Public Buildings Service Region 10 (GSA-PBS) to repair the basement stair landing at the Juneau Federal Building in Juneau, Alaska. Work will be performed in Juneau between June 23, 2022 and December 19, 2022. No subcontractors or set-aside...
This is a $72,197.78 firm fixed price Delivery Order awarded by the U.S. Department of Agriculture's Forest Service Southern Region (Region 8) to Noacon Inc., a small disadvantaged business and HUBZone certified construction firm. The contract is to provide all materials and labor to design and build a prefabricated, steel exterior stairway system at the Blanchard Springs Caverns Visitor Center in Arkansas. The work is part of a larger Indefinite Delivery Contract the Forest Service has with...
<p>This is a $2,621.33 firm-fixed-price purchase order contract awarded by the U.S. Army Corps of Engineers (USACE) New England District to Complete Construction, a small disadvantaged business. The contract is for the REPLACE STAIRS-STOUGHTON POND project, which is part of the American Recovery and Reinvestment Act (ARRA) program. The contract has a total small business set-aside designation and a completion date of July 31, 2009.</p>
This firm fixed price delivery order for $58,805.85 was awarded by the U.S. Department of the Interior Fish and Wildlife Service Region 1 to KPB Architects Coffman Engineers Joint Venture. The contract calls for assessment, evaluation, inspection, testing, visual observation, and structural analysis services for the Coquille Point Stairway located on the Oregon Islands National Wildlife Refuge in Bandon, Oregon. No set-aside designation was applied to this contract. Work will be performed in...
This is a $11,740 firm fixed price contract awarded by the U.S. Forest Service to PND Engineers, Inc. Juneau Division for engineering services during the construction of the GAOA Anan Wildlife Observatory Reconstruction Phase 2 project on the Tongass National Forest in Alaska. The contract is not set aside. PND Engineers, Inc. is the parent company of the Juneau Division awardee. This contract is a follow-on to PND Engineers' prior work as a subcontractor, providing structural engineering...
The Department of the Interior National Park Service Intermountain Region awarded Nelson Engineering, doing business as Grizzly Engineering, a $137,388 firm fixed price delivery order to replace an existing concrete observation deck at Mesa Verde National Park in Colorado. As part of its mission to preserve and protect nationally significant natural and cultural resources, the National Park Service oversees numerous historical sites requiring periodic infrastructure maintenance and upgrades....