P00005 GRAFTON JCC PROJECT 3707 DESIGN BUILD SOLICITATION STRUCTURAL STEEL REPLACEMENT AND ELEVATED WALKWAY REPAIR RFC-6: ADDITIONAL WORK TO CUT, FIT, AND CAP GOVERNMENT SUPPLIED GUTTERS AND DOWNSPOUTS. NO ADDITIONAL COMPENSABLE DAYS OF WORK IS REQUIRED Change Order $1.4k 8/5/19 P00004 GRAFTON JCC PROJECT 3707 DESIGN BUILD SOLICITATION STRUCTURAL STEEL REPLACEMENT AND ELEVATED WALKWAY REPAIR RFC-3: NON-COMPENSABLE TIME EXTENSION ADD 45 CALENDAR DAYS. THE CONTRACT REQUIRES THE CONTRACTOR TO PROVIDE DESIGN AND CONSTRUCTION SERVICES FOR THE REPLACEMENT OF STRUCTURAL STEEL AT THE ELEVATED WALKWAY AND LANDING OF BUILDING 17 AND REPAIR OF THE ELEVATED WALKWAY CONCRETE SURFACE AND LANDING. THE CONTRACTOR'S CURRENT CONTRACTUAL SUBSTANTIAL COMPLETION DATE IS OCTOBER 30, 2018,AND THE CURRENT CONTRACT COMPLETION DATE IS DECEMBER 30, 2018. THE CONTRACTUAL SUBSTANTIAL COMPLETION DATE OF OCTOBER 30, 2018 CANNOT BE MET BY THE CONTRACTOR DUE TO INCLEMENT WEATHER WHICH HAS IMPACTED THE COMPLETION OF THE CONCRETE REPAIRS AT THE PEDESTRIAN BRIDGE AND PEDESTRIAN WALKWAY. THE DELAY IN SUBSTANTIAL COMPLETION WILL IMPACT THE CONTRACTOR'S ABILITY TO COMPLETE CLOSE-OUT DOCUMENTS (AS-BUILT DRAWINGS, WARRANTIES/GUARANTEES AND O & M MANUALS) PRIOR TO THE CONTRACTUAL CLOSEOUT DATE OF DECEMBER 26, 2018. CONTRACT COMPLETION DATE IS EXTENDED FROM DECEMBER 26, 2018 TO FEBRUARY 9, 2019. RC-4: CHANGING THE IN CONCRETE MATERIAL FROM READY MIX TO A FAST SETTING BAG-MIX. CHANGE THE CONCRETE MATERIAL BEING USE TO PATCH AREAS OF THE ELEVATED WALKWAY AND BALCONY, FROM A STANDARD READY-MIX CONCRETE MATERIAL TO A BAGGED RAPID SET AND CURE CONCRETE. ADD $17,606.40 ADD 0 CALENDAR DAYS. RFC-5 NON-COMPENSABLE TIME EXTENSION TO COMPLETE THE PUNCH-LIST ITEMS. AS A RESULT OF THE SUBSTANTIAL COMPLETION INSPECTION AND RESULTING PUNCH-LIST THERE ARE SEVERAL ITEMS THAT ARE WEATHER AND TEMPERATURE DEPENDENT THEREFORE CANNOT BE COMPLETED AND WARRANTY REQUIREMENTS COMPLIED WITH UNTIL TEMPERATURES INCREASE. THE CONTRACTOR REQUESTED IN HIS SUBSTANTIAL COMPLETION REQUEST LETTER DATED JANUARY 3, 2019, A NON-COMPENSATORY TIME EXTENSION OF 111 CALENDAR DAYS CHANGING THE FINAL COMPLETION DATE FROM FEBRUARY 9, 2019 TO MAY 31, 2019 TO ALLOW TIME TO COMPLETE ALL THE PUNCH LIST ITEMS PRIOR TO FINAL CONTRACT CLOSE-OUT. Change Order $17.6k 1/25/19 P00003 GRAFTON JCC PROJECT 3707 DESIGN BUILD SOLICITATION STRUCTURAL STEEL REPLACEMENT AND ELEVATED WALKWAY REPAIR ADDITIONAL CONCRETE REPAIRS ON THE ELEVATED WALKWAY REQUESTED IN RFI-4-ADDITIONAL BEAM-TO-BEAM FULL DEPTH REPAIR AND REMOVAL OF APPLICABLE CEMENTITIOUS PARGING. PART C, SECTION IV EXTENT TO WORK, ITEM 2, REQUIRES THE CONTRACTOR TO REPAIR AND RESURFACE THE 6 FOOT WIDE BY 81 FOOT LONG ELEVATED WALKWAY AND PATCH APPROXIMATELY 10% OF THE WALKWAY DECKING. THE REMOVAL OF THE DEFECTIVE CONCRETE AND REPLACEMENT WITH A NEW FULL-DEPTH CONCRETE DECKING AT THE PEDESTRIAN BRIDGE IS REQUIRED TO ENSURE THE STRUCTURAL INTEGRITY AND SAFETY OF THE PEDESTRIAN BRIDGE DECKING. ADD 0 CALENDAR DAYS. CONTRACT COMPLETION DATE IS DECEMBER 26, 2018. SUBSTANTIAL COMPLETION DATE IS OCTOBER 30, 2018. Change Order $26.2k 12/3/18 P00002 GRAFTON JCC PROJECT 3707 DESIGN BUILD SOLICITATION STRUCTURAL STEEL REPLACEMENT AND ELEVATED WALKWAY REPAIR LEAVE THE EXISTING COLUMN IN PLACE, EXTEND THE BALCONY WATERPROOF COATING, AND ADD WIRE MESH TO BALCONY RAILS IN ACCORDANCE WITH THE GOVERNMENT'S RESPONSE TO RFI'S #1 AND RFI#3. ADD 14 ADDITIONAL CALENDAR DAYS. CONTRACT COMPLETION DATE IS NOW DECEMBER 26, 2018. SUBSTANTIAL COMPLETION DATE IS NOW OCTOBER 30, 2018. Change Order $16.4k 9/27/18 P00001 GRAFTON JCC PROJECT 3707 DESIGN BUILD SOLICITATION STRUCTURAL STEEL REPLACEMENT AND ELEVATED WALKWAY REPAIR REPLACE THE CURRENT GENERAL DECISION NUMBER (WAGE RATES) ( MA170001 10/06/2017 MA1) WITH THE GENERAL DECISION NUMBER (WAGE RATES) (MA180018 08/10/2018 MA18 ). THE NEW RATES REFLECT THE RATES FOR WORCESTER COUNTY MASSACHUSETTS WHICH IS WHERE THE GRAFTON JCC IS LOCATED. Other Administrative Action $0 8/17/18