Definitive Contract 12970223C0016
- Not listed
- The U.S. Forest Service awarded a $57,000 firm-fixed price contract to Copper Mountain Services LLC, a small disadvantaged and service-disabled veteran-owned business, to replace the water manifold system at the Santa Maria Air Tanker Base located in the Los Padres National Forest. This contract, a total small business set-aside, includes replacing the underground water fill pipe, water meter, gate valves, and installing a new backflow prevention assembly. The work must be completed within 7...
- This is a $97,350.00 firm fixed price definitive contract awarded by the U.S. Forest Service's Pacific Southwest Region (Region 5) to Martin Brothers Construction, a HUBZone-certified small disadvantaged business. The contract is for the rehabilitation of four area water tanks at the Sierra National Forest, including work at the Minarets Work Center, Dry Gulch Campground, Mammoth Pool Campground, and Vermillion Campground. This contract is part of the Forest Service's ARRA-FS CAPITAL IMPROVEMENT...
- The USDA Forest Service awarded a firm fixed price definitive contract valued at $XXX,XXX to Construction Solutions Group, LLC. The contract calls for the contractor to remove two existing 5,000 gallon fiberglass water tanks, accessories, and associated drain and supply lines at the Mimbres Administrative Site in Silver City, New Mexico. The contractor will then install a new 11,000 gallon steel water tank, required foundation, safety features, and connect new water valves and lines to the...
- The U.S. Forest Service (USFS) awarded a $97,036.00 firm fixed price definitive contract to Willis Management Enterprises Inc., doing business as Willis Drilling And Pump, to either clean and maintain an existing 6,000-gallon steel potable water storage tank or replace it entirely at the Pittman Valley Work Center in Williams, Arizona. This contract was set aside for small businesses. The original solicitation required the contractor to be responsible for all plumbing disconnects, removal, and...
- The Department of Agriculture Forest Service awarded a $10,750.00 firm fixed-price purchase order to Evergreen Specialty Services, a small business based in Commack, New York, to provide a 550-gallon portable trailer-mounted water tank for the Stanislaus National Forest. The requirement was originally solicited under a Request for Proposal (RFP) with a total small business set-aside. The water tank must meet specific technical requirements, including a high-pressure 100 GPM/100 PSI pump with a...
- The U.S. Forest Service awarded a $157,400 firm-fixed-price contract to Copper Mountain Services LLC, a self-certified small disadvantaged and service-disabled veteran-owned business, to repair the water system at the Big Tujunga Fire Station in the Angeles National Forest. The work will address safety concerns and improve the efficiency of the water system, including repairing the exterior of two 10,000-gallon tanks, installing interior liners, and replacing valves and piping. This contract...
- This is a $106,738.00 definitive contract awarded to Liquivision Technology Inc., a veteran-owned small business, by the U.S. Department of Agriculture's Forest Service. The contract is for the rehabilitation of a water tank in the San Bernardino National Forest (SBNF), designated as a total small business set-aside. Liquivision Technology specializes in potable water tank cleaning, inspection, repair, and rehabilitation services for government entities. This contract is one of several similar...
- The U.S. Forest Service, a civilian federal agency, has awarded a $15,999.92 firm fixed-price delivery order contract to Joshua Taylor, doing business as Trinity River Water & Trucking, a small business HUBZone firm. The contract is for water handling services to support fire suppression and all-hazard incident response activities in the Forest Service's Regions 3, 5, 6, and 10, which cover the western United States and Alaska. This delivery order contract is part of a larger Indefinite...
- The U.S. Forest Service, an agency within the U.S. Department of Agriculture, awarded two federal contracts to Clear Water River LLC, a Hispanic American-owned small business. The first contract is a $44,950 firm-fixed price delivery order for the provision of a dump truck to support wildland fire suppression and all-hazard incident response operations in the Intermountain Region. The second award is an indefinite delivery contract with a potential value of $250,000 to furnish heavy equipment...
- The U.S. Forest Service awarded a Firm Fixed Price Delivery Order contract worth $84,600 to Clear Water River LLC, a Hispanic American owned small business, to provide a dump truck and unspecified services in support of wildland fire suppression and all-hazard incident response in the Intermountain Region. This Delivery Order is a standalone award, not associated with a larger contract vehicle. No set-asides were applied. Clear Water River LLC also holds two indefinite delivery contracts with...
The U.S. Department of Agriculture Forest Service awarded a $308,277 firm fixed price contract to Full Signal Construction, Inc., a small business, to replace the water tank at the Clearwater Station in the Sierra National Forest. This contract, which has a total small business set-aside designation, supports the Forest Service's disaster response and infrastructure management programs. The contract will demolish two existing 5,000 gallon tanks and install a new 31,000 gallon tank, as well as connect it to the distribution system, install electrical controls, and construct approximately 350 linear feet of new waterline and a hydrant. The performance period is 45 days, with a completion date of October 31, 2024. This contract award is part of a larger $50 million single-award blanket purchase agreement Full Signal Construction received from the Forest Service for road maintenance and construction services across California's national forests and grasslands.
Name | Description | Solicitation Number | FederalAgency | Type | PostedDate |
|---|---|---|---|---|---|
Clearwater Station Water Tank Replacement | 12970223Q0055 | Department of Agriculture Forest Service | Solicitation 2/4 | 5/16/23, 1:49 PM | |
Clearwater Station Water Tank Replacement | 12970223Q0055-0001 | Department of Agriculture Forest Service | Solicitation 3/4 | 5/23/23, 6:49 PM | |
Clearwater Station Water Tank Replacement | 12970223C0016 | Department of Agriculture Forest Service | Award Notice 4/4 | 7/5/23, 1:58 PM | |
Clearwater Station Water Tank Replacement | 12970223Q0055 | Department of Agriculture Forest Service | Pre-Solicitation 1/4 | 5/12/23, 1:02 PM |
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| P00002 | Change Order | $8.8k | 8/29/24 | |
| P00001 | Change Order | $0 | 3/4/24 | |
| Not listed | Not listed | $299.5k | 6/23/23 |