WTP Intake Maintenance Dredging Project

Solicitation # 314FB2025002
Posted 7/3/25, 12:00 AM
No Updates
Due 7/29/25, 2:00 PM
Similar Opportunities
The City of Goldsboro, North Carolina is soliciting bids for the Flow Meter Installation Project (Bid Request #FB 2025-003), a comprehensive infrastructure improvement initiative targeting multiple jurisdictions including Warren County and Greensboro City. The project primarily involves the installation of Transit Time Flow Meters at strategic locations such as Seymour Johnson AFB, Fork Township areas, and the City Water Treatment Plant, with specific requirements for 16" and 20"...
The Virginia state government, specifically through an Invitation for Bids (IFB No. 25-4351-6256), is seeking a qualified contractor to perform maintenance dredging and pier/dock system construction at the North End of the Inner Harbor of Seafood Industrial Park, located in Nathalie CDP. The procurement opportunity was posted on June 23, 2025, with a bid submission deadline of July 1, 2025. The project requires comprehensive work involving both dredging activities and infrastructure...
The City of Goldsboro, North Carolina, is soliciting proposals through a Request for Proposals (RFP 2025-004) for comprehensive brownfield assessment activities. The procurement seeks highly qualified environmental professional (QEP) firms to conduct services under a U.S. Environmental Protection Agency (EPA) Cooperative Agreement with Grant Number BF-03D22624-0. The primary objectives include inventorying, characterizing, assessing, conducting cleanup planning, and engaging in community...
The Michigan Department of Technology, Management and Budget (DTMB) and the Department of Environment, Great Lakes, and Energy are procuring a harbor dredging project for Grand Traverse Harbor, located in Houghton County. The procurement involves mechanical dredging of approximately 13,000 cubic yards of sediment from the harbor entrance channel, with the objective of returning the channel to its design depth between 10-12 feet below the low water datum. Dredging will occur between stations...
The City of Raleigh, North Carolina is seeking bids for the Galvanized Service Replacement List 2 project (City Bid Number 274-GSRPRV2), which involves the replacement of fifty (50) existing galvanized water service lines within Wake County and Teachey Town. The procurement specifically requires replacing water service lines from the meter to a distance of 5 feet inside residential structures, utilizing approved materials and performed exclusively by plumbers licensed to work within North...

The City of Goldsboro, North Carolina is seeking bids for the Water Treatment Plant Intake Maintenance Dredging Project located near the intersection of Stevens Mill Road and Farm Road in Goldsboro. This procurement involves a comprehensive hydraulic dredging project for the Neuse River, with specific work requirements including the installation of a turbidity curtain surrounding the recently constructed intake screen and downstream shoreline. The project scope encompasses dredging a defined river area (140 feet upstream and 80 feet downstream of the intake screen), and subsequently hauling and disposing of removed materials at an offsite disposal location. Sealed bids will be received at Goldsboro City Hall until 2:00 PM on July 29, 2025, with a non-mandatory virtual pre-bid meeting scheduled for July 15, 2025, at 11:00 am on Microsoft Teams. Bidding documents can be downloaded after registering on the City of Goldsboro's Vendor Registration / Bid Opportunities Page, and the project will be awarded as a single prime contract on a lump sum and unit price basis. Bidders are required to submit an original set of bid documents and provide proof of qualifications, and must be registered on the Bidding Document Holders list.

While specific set-aside designations are not explicitly detailed in the available documentation, bidders will be required to provide bid security in accordance with the Instructions to Bidders. The project involves Warren County and is being managed by Project Manager Richard Hamilton, Public Utilities Deputy Director, who can be contacted at rhamilton@goldsboronc.gov or 919-735-3329. Contractors are encouraged to attend the pre-bid meeting and can coordinate with the city to schedule a site visit. Although specific budget ranges are not provided in the documentation, the project represents a critical infrastructure maintenance effort for the city's water treatment plant intake system. The precise contract times and specific pricing details will be determined through the competitive bidding process, with full contract drawings and project manual to be provided to registered bidders. Potential vendors should carefully review all documentation and ensure compliance with the city's bidding requirements and specifications.

Generated 7/3/25, 6:39 PM