UNC Charlotte

Solicitation # 28729243
Posted 2/18/25, 12:00 AM
No Updates
Due 3/20/25, 5:00 PM
Similar Opportunities
UNC Greensboro is seeking qualified design professionals for a comprehensive elevator replacement project at Tower Village, a campus residence hall. The Designer Solicitation targets architectural and engineering services to replace two existing hydraulic elevators originally installed in 1993, with one six-stop and one seven-stop elevator system. Proposers must be licensed in North Carolina to provide architectural or engineering services and will be responsible for assessing the current...
Washington County is seeking a qualified general contractor to modernize an existing passenger traction elevator located at the Washington County Courthouse in Plymouth, North Carolina. The project involves updating a 2,500 lb capacity, 200 fpm speed elevator serving five landings (B, 1, 2, 3, and 4), with the goal of meeting current building codes and ADA standards. The Request for Bid (RFB) requires a complete turnkey elevator modernization solution, including replacement of obsolete system...
UNC Greensboro is seeking a comprehensive architectural and engineering design solicitation for the Moore Building Renovation project, targeting licensed design professionals in North Carolina. The procurement involves a full-scale renovation of the 41,631 gross square foot Moore Building originally constructed in 1969, with a detailed scope of work including new plumbing, mechanical, electrical, sprinkler, and fire alarm systems, roof and window replacements, accessibility improvements, and...
The University of North Carolina at Charlotte is seeking bids for a procurement of 1,000 banquet chairs for the Popp Martin Student Union ballroom through Invitation for Bid #66-25045 CB. The procurement requires vendors to supply Shev Chair Toccata chairs or equivalent models with specific technical requirements, including a flexback design, ability to stack at least 10 high, hand holds, retractable ganging clips, and fabric with a minimum of 100,000 double rubs/abrasions. Vendors must...

UNC Charlotte is seeking architectural and engineering services for a comprehensive elevator modernization project at the Fretwell building, a 160,345 square foot academic facility constructed in 1996. The procurement solicits professional services for upgrading three elevators, with a critical requirement that two elevators remain operational during the phased renovation. Proposing firms must be licensed in North Carolina to provide architectural or engineering services and must submit a detailed SF-330 form and letter of interest by March 20, 2025, to La'Keya Hewlin in the Facilities Management-Project Management department. The project objectives include replacing obsolete and end-of-life elevator components such as cabs, finishes, pumps, motors, and other elements impacting life safety and occupant comfort. Evaluation criteria will likely focus on technical expertise, experience with similar institutional elevator modernization projects, and the ability to meet the specified phasing and operational continuity requirements. Project manager Patrick Jones can be contacted at pajones@charlotte.edu for additional information, and supplemental project details are available through a provided URL link.

The solicitation does not explicitly mention specific set-aside designations or restrictions for disadvantaged business enterprises. While no incumbent vendors are identified in the documentation, the project appears to be a comprehensive upgrade of existing infrastructure within an established academic building. The total project budget is set at $1,800,000, which represents the anticipated cost for complete elevator modernization across three elevator systems. The upgrades are designed to bring the elevators into compliance with current safety codes and standards, suggesting a significant infrastructure improvement investment. The phased approach indicates a strategic implementation plan that minimizes disruption to the building's daily operations while systematically replacing critical elevator components.

Generated 2/24/25, 11:04 AM