Treatment Facility Construction Contract
- The San Antonio Water System (SAWS) is requesting sealed bids for sanitary sewer laterals renewal and repair construction services throughout its service area under Solicitation No. CO-00910, with bids due August 20, 2026 at 2:00 p.m. CST. A Small Business Opportunities Program (SBOP) participation goal of 21 percent for Small, Minority, and Woman-owned Business (SMWB) certified by the South Central Texas Regional Certification Agency applies; bidders must submit a Good Faith Effort Plan...
- The San Antonio Water System (SAWS) is requesting sealed bids for construction of approximately 8,600 linear feet of 24-inch water main and 2,000 linear feet of 16-inch water main for the Stonehill Offsite Water Extension — Phase II (SAWS Job No. 25-7008, Solicitation No. CO-00921), with bids due September 8, 2026 at 2:00 PM CST. An aspirational Small, Minority, and Woman-Owned Business (SMWB) participation goal of 21 percent applies; contractors must submit a Good Faith Effort Plan...
- San Antonio Water System (SAWS) is requesting sealed bids to repair leaks in the water distribution system on a work order basis under Solicitation No. CO-00914, with bids due August 19, 2026 at 2:00 p.m. CST, and a non-mandatory pre-bid meeting on August 4 at SAWS Headquarters in San Antonio. Bidders must demonstrate a 21 percent aspirational goal for Small, Minority, and Woman-owned Business (SMWB) participation certified by the South Central Texas Regional Certification Agency through a...
- The City of Gatesville is requesting bids for a 15-inch gravity wastewater main replacement along State Highway 36 and Main Street, including connections to the existing system, with bids due August 18, 2026 at 2:00 p.m. via BeaconBid. The City is an Affirmative Action/Equal Opportunity Employer and encourages proposals from Section 3 Residents, Minority Business Enterprises, Small Business Enterprises, Women Business Enterprises, and Labor Surplus Area firms — stated as encouragement, not a...
- San Antonio Water System is soliciting bids for a one-time purchase of two combination jet/vacuum sewer cleaning machines, with proposals due August 10, 2026. The scope comprises two complete units, each consisting of a 66,000 GVWR single-cab chassis truck with an installed 10-cubic-yard (minimum) capacity, single-engine combination jet/vacuum sewer cleaning machine. The specifications establish minimum technical and operational requirements for compatibility with SAWS fleet infrastructure;...
- The San Antonio Water System (SAWS) is requesting proposals for water main condition assessment services on the Central Water Integration Pipeline (CWIP) using non-destructive electromagnetic testing and acoustic leak detection, with proposals due August 21, 2026 at 2:00 p.m. CDT. The scope covers two separate project locations totaling 4.9 miles of 30-inch to 36-inch prestressed concrete cylinder pipe (PCCP) and ductile iron (DI) pipe. Project 1 spans approximately 3.7 miles of 36-inch PCCP...
- The City of San Juan, Texas is requesting sealed proposals for Phase Two rehabilitation of an existing wastewater treatment plant's facilities, equipment, and related appurtenances under Texas Water Development Board CWSRF Project No. 73796, with proposals due August 18, 2026 at 10:00 a.m. The project is subject to American Iron and Steel requirements, Davis-Bacon prevailing wage requirements, Equal Employment Opportunity regulations (41 CFR Part 60-4), and Contract Work Hours and Safety...
- The City of Houston is requesting competitive bids for site-specific sanitary sewer rehabilitation including pipe bursting, cured-in-place pipe lining, point repairs, sewer replacement, and service lateral repairs and reconnections, with bids due August 20, 2026. MBE and WBE participation goals of 14% and 5%, respectively, apply. The scope encompasses cleaning and televising gravity sanitary sewers, construction and rehabilitation of manholes, removal of existing pipe liners, and pavement and...
- The City of Corpus Christi, Texas is requesting bids for waterline and wastewater improvements at the ONSWTP Navigation Pump Station (Project 22405, RFB 7399), with bids due August 12, 2026 at 2:00 p.m. CT and a mandatory pre-bid conference and site visit on July 22, 2026. A contractor self-performance requirement of 50% applies. The scope encompasses installation of approximately 8,600 linear feet of 36-inch waterline and 1,500 linear feet of 30-inch waterline with all valves, fittings, and...
- San Antonio Water System is requesting sealed proposals for water main construction on Toutant-Beauregard Road and Wurzbach Road, with proposals due August 26, 2026. The project involves installation of approximately 30 linear feet of 6-inch DI pipe, 48 LF of 8-inch DI pipe, 2,370 LF of 12-inch DI pipe, 6,953 LF of 16-inch DI pipe, and 10 LF of 24-inch DI pipe via open cut; 1,043 LF of 24-inch to 30-inch steel casing installed by jacking or boring; surface restoration including pavement...
San Antonio Water System (SAWS) is requesting sealed bids for replacement and installation of slide gates, filters, pump stations, and associated civil improvements at the Steve M. Clouse Water Recycling Center, with bids due August 25, 2026, and a non-mandatory pre-bid meeting and site visit on August 5, 2026 at 1:00 PM CDT at 3495 Valley Road, San Antonio, Texas. SAWS requires bidders to comply with the Small Business Opportunities Program (SBOP) by submitting a Good Faith Effort Plan demonstrating commitment to subcontracting with small, minority, and woman-owned businesses certified by the South Central Texas Regional Certification Agency. Bids exceeding $10,000 with contractors having 15 or more employees must include nondiscrimination provisions complying with Executive Order 11246. The scope includes installation of ten 12"×12" slide gates in first-stage aeration basins, replacement of Aqua Diamond filters in four tertiary treatment tanks (eight filters per tank), installation of two access hatches at the drying bed pump station, replacement of two gravity belt thickener feed pumps, and removal and disposal of sand filter materials from tertiary treatment basins. Work is performed at the SMC WRC in San Antonio. The contract includes lump-sum pricing for primary items with mobilization and demobilization capped at five percent of base bid, five intermediate demobilization and remobilization events, and four allowances totaling $75,000 (civil, mechanical, electrical, and permitting). Contract completion is required within 540 calendar days after Authorization to Proceed. Bidders must submit a bid bond or certified check equal to five percent of total bid price. Performance and payment bonds in the full contract amount are required upon award unless contract amount does not exceed $25,000. Technical questions are due August 11, 2026 at 3:00 PM CDT; answers will be posted by August 18, 2026. Contract award is anticipated within 60 days after bid opening to the lowest responsible bidder. The contract documents reference City of San Antonio Standard Specifications for Public Works Construction (June 2008) and SAWS Specifications for Water & Sanitary Sewer Construction (February 2021).
Name | Description | Size | Type | Posted |
|---|---|---|---|---|
Specs FINAL SIGNED.pdf | 37MB | 8/5/26 |