The Town of Woodstock in Vermont is seeking proposals from qualified trail design professionals or firms to conduct a comprehensive assessment and design project for the Billings Park trail system. The primary objectives of this contract opportunity include evaluating the existing trail network, identifying accessibility improvements, and developing recommendations for enhancing safety and durability. Specific deliverables will include a thorough on-site survey, a comprehensive report with actionable recommendations, and proposed design modifications for the trail system. The project focuses on improving trail connections with the adjacent National Park, addressing current erosion and maintenance challenges, and upgrading trails that were not originally designed to modern standards. The procurement is identified by State Local Contract Opportunity ID 6896084dd3e4c6e03d0b6fce, with proposals due on August 28, 2025. The project area is located in Washington County and specifically involves the Billings Park trail network, excluding the Faulkner Park parcel. Potential respondents must demonstrate expertise in trail design, assessment, and management, with a particular emphasis on challenging terrain and sustainable trail development. While the contract opportunity documentation does not explicitly outline specific set-aside designations or vendor restrictions, interested firms should be prepared to demonstrate professional qualifications in trail design and landscape engineering. The project is situated in a geographically complex area between two heavily used trail systems, suggesting that respondents will need specialized technical expertise in terrain assessment and trail infrastructure design. No specific budget range or award value was disclosed in the original procurement documentation. The project scope suggests a comprehensive professional services engagement that will require advanced technical skills in trail assessment, landscape design, and environmental consideration. Firms interested in responding should carefully review the detailed requirements and be prepared to provide a comprehensive proposal that addresses the complex terrain and specific improvement objectives of the Billings Park trail system.