Solid Waste Center Grading and Civil Improvements

Solicitation # 06925
Posted 5/1/25, 2:00 AM
No Updates
Due 5/21/25, 6:00 PM
Source
No public source available
Similar Opportunities
The City of Aspen, Colorado is seeking professional design services through RFP #2025-188 for the West End Stormwater Infrastructure Replacement project, targeting underground storm utility, drainage, and surface infrastructure improvements in the West End neighborhood. The geographic scope covers the area east of 8th Street, south of Gillespie, west of Mill Street, and north of Main Street. Deliverables include comprehensive construction documents developed through four project phases:...
The Town of Milliken in Weld County, Colorado, is seeking a comprehensive roadway reconstruction project for Center Drive, spanning 2,750 linear feet from WCR 23 to the town limits. The procurement is a public works infrastructure improvement project solicited through Request for Proposals (RFP 05-2025), with a mandatory pre-bid meeting scheduled for May 20, 2025, and bid submissions due by May 28, 2025, at 1:00 PM. The project requires complete roadway reconstruction, including removing...
Pitkin County, Colorado, is seeking a qualified financial advisory firm to provide comprehensive services for the issuance and management of municipal debt through a Request for Proposals (RFP) numbered 064.25. The county aims to secure a professional partner to assist with several critical capital projects, including construction of a commercial terminal and airport improvements at the Aspen/Pitkin County Airport, a new public safety center/jail, a regional emergency communications center,...
The Colorado state government has issued a procurement opportunity for the PKAA, Walker Coal Regrade Project, which was posted on May 8, 2025, with a proposal submission deadline of May 27, 2025. This contract appears to be focused on a coal regrading initiative, likely involving site rehabilitation or reclamation work. The project seems to require specialized expertise in geological engineering, land restoration, and potentially environmental remediation techniques. Prospective contractors will...
The City of Canon City, located in Fremont County, Colorado, is seeking bids for the 2025 2A Justice Center Road Reconstruction Project (Bid #17-25), a comprehensive roadway infrastructure improvement initiative. The procurement involves reconstructing approximately 0.5 miles of roadway utilizing Full Depth Reclamation (FDR) with Cement Treated Subgrade (CTS) methodology. Specific project deliverables include constructing curb and gutter, sidewalk installations, drainage improvements, and...
Larimer County, Colorado is seeking sealed bids for a material supply and delivery contract for a geotextile sand filter (GSF) septic system, specifically for the Perry Stokes Airport located in Trinidad. The procurement involves a comprehensive set of septic system components, including 1,000-gallon and 2,000-gallon precast concrete septic tanks, a 1,000-gallon equalization tank, PVC piping, pump vault, control panel, Eljen modules, filter media sand, flushing valves, observation ports, and...
The City of Englewood Utilities Department is seeking qualified contractors to execute ServiCenter Space Improvements at Building 11, located at 2800 S. Platte River Drive in Englewood, Colorado. The procurement involves constructing a 3,684 square-foot building addition and remodeling 810 square feet of existing space to consolidate facility usage and enhance the Distribution & Collection Division's operational capabilities. The project will include adding two new sectional overhead...
The City of Glenwood Springs, Colorado, is soliciting qualifications from professional consulting firms to develop a comprehensive Stormwater Master Plan through Request for Proposal 2025-23P. The project requires a professional services consultant to perform a city-wide stormwater management strategy, with key deliverables including a GIS-based hydraulic model, drainage basin mapping, hydrology analysis, MS4 permit preparation, and a stormwater utility evaluation. The consultant will be...
The state and local contract opportunity identified as 681f5c708f97d4eeda060cf2 is a procurement by Pitkin County, Colorado for the LCC 25-4 Upgrade Electrical Systems/Bathroom Plumbing project. The contract seeks qualified contractors to perform comprehensive electrical system and bathroom plumbing upgrades at a specified location. Key objectives include modernizing existing electrical infrastructure and improving bathroom plumbing functionality, with a focus on enhancing system reliability and...
The state and local contract opportunity identified as 681f5c613eba138baf05d810 involves wastewater system repairs for John Martin SP, a project located in Denver County and Denver City, Colorado. The procurement is seeking contractors capable of executing comprehensive wastewater infrastructure maintenance and repair services. The project appears to focus on critical system upgrades and rehabilitation of existing wastewater infrastructure, with potential requirements including assessment,...

Pitkin County is seeking a qualified contractor to complete comprehensive civil construction services for the Solid Waste Center Grading and Civil Improvements project. The procurement involves approximately 100,000 cubic yards of civil grading, constructing a detailed stormwater system and 100-year storm pond, and installing a leachate pond system including specialized piping, liner installation, safety fencing, and electrical infrastructure. Proposals are due on May 21, 2025, by 2:00 PM MT, with a mandatory pre-proposal meeting scheduled for May 7, 2025, at 9:00 AM. The county will award a one-year contract with an anticipated start date of June 1, 2025, and project completion expected by December 2025. The evaluation criteria for proposals include 25% for project approach, 25% for similar work experience, 40% for estimated service costs, and 10% for references. Both primary contractors and subcontracted liner companies must demonstrate expertise in landfill liner systems, leak detection, and leachate management. Proposers are expected to align with the county's environmental priorities, focusing on climate action and carbon footprint reduction.

The procurement does not specify explicit set-aside designations or restrictions for disadvantaged enterprises. The project involves complex civil engineering work at an active landfill site in Snowmass Village, Colorado, requiring careful infrastructure integration and minimal disruption to existing operations. The total project scope encompasses approximately 10,406,338 cubic yards of earthwork, with comprehensive technical specifications for bid items including mobilization, phasing, quality control, earthwork, erosion control, and stormwater pond construction. While specific budget ranges are not explicitly detailed, the comprehensive nature of the project suggests a significant capital investment. The contract includes provisions for performance and payment bonds for contracts over $50,000, with a requirement that 80% of labor be Colorado-based. The project will involve extensive site preparation, including removing existing infrastructure, constructing new facility components, and implementing advanced environmental management systems for leachate and stormwater control.

Generated 5/2/25, 7:27 AM