- The Virginia Department of Transportation is requesting bids for construction of a roundabout on Route 40 in Nottoway County, from 0.046 miles west of Route 750 to 0.063 miles east of Route 750, with bids due July 22, 2026 and award no later than 60 days after bid opening. Prequalification is required. The contract is federally funded under the Surface Transportation Program (FHWA Number STP-067-4(037)) and subject to Davis-Bacon prevailing wage requirements, with wage rates established by the...
- The Virginia Department of Transportation is requesting bids for a roundabout construction project on Route 15 from 0.055 miles west of Griffin Boulevard to 0.045 miles east of Griffin Boulevard in Prince Edward County, with bids due July 22, 2026 at 10:00 a.m. Prequalification is required for all bidders — a mandatory eligibility gate. The scope encompasses site preparation, drainage infrastructure, pavement demolition and replacement, utilities installation (water and sanitary sewer...
- Virginia Department of Transportation is soliciting bids for construction of a roundabout and R-Cut intersection on Route 17 in Fauquier County, spanning 0.206 miles south of Carters Run Road to Whiting Road, with bids due July 22, 2026 at 10:00 a.m. Prequalification is required to bid. The scope encompasses roundabout and intersection construction with stormwater management facilities, drainage systems, excavation (approximately 26,228 cubic yards), asphalt concrete placement (approximately...
- Loudoun County, Virginia is soliciting bids for construction of a single-lane roundabout at the intersection of Route 50 and Everfield Drive (Route 3423) in Aldie under IFB 831028, with bids due August 4, 2026 at 4:00 p.m. Eastern Time and a public bid opening to follow virtually via Microsoft Teams. Bidders must be prequalified through the Virginia Department of Transportation (VDOT) — a mandatory eligibility filter. A Virginia Class A Contractor license is also required. The scope includes...
- The Virginia Department of Transportation is requesting bids for Smart Scale – Intersection Safety Improvements on Route 301 in King George County, spanning 0.215 miles south of University Drive to 0.263 miles north of University Drive, with bids due July 22, 2026. Prequalification is required; bids are submitted electronically through Bidx at 10:00 a.m. This is a federally funded project under the NHS/FHWA program (NHPP-048-6(077)) subject to DBE requirements under 49 CFR Part 26. Prevailing...
- The Virginia Department of Transportation is soliciting bids for Smart Scale road widening on Route 1947 from 0.052 miles south of Route 5088 to Route 628 in Roanoke County, with bids due July 22, 2026. Prequalification is required. The contract is federally funded under the Federal Highway Administration's Surface Transportation Block Grant Program (RSTP-5128(589)), triggering Davis-Bacon prevailing wage requirements and Equal Employment Opportunity compliance. The scope encompasses clearing...
- The Virginia Department of Transportation is requesting bids for Smart Scale intersection improvements on Route 58 in Mecklenburg County (0.165 miles west to 0.100 miles east of Route 643), with electronic bids due July 22, 2026 at 10:00 a.m. through Bidx and prequalification required to bid. The scope includes site preparation, drainage infrastructure, pavement work, traffic control, signalization, and utility modifications. Major work items total 4,077 cubic yards regular excavation, 3,301...
- The Virginia Department of Transportation is soliciting bids for Smart Scale – Intersection Improvements on Route 460 in Roanoke and Botetourt Counties, with bids due July 22, 2026 at 10:00 a.m. VDOT prequalification is mandatory for eligibility. The scope encompasses intersection improvements at multiple locations in the Salem District, including drainage systems, pavement rehabilitation, utility relocations, traffic signal modifications, and erosion control measures across over 2,900 line...
- The Virginia Department of Transportation is requesting bids for pedestrian improvements on Route 60 in Buena Vista from 0.019 miles west of Route 501 to 0.029 miles east of Route 501, with bids due July 22, 2026, and project completion by July 22, 2027. Prequalification is required. This is a Federal-aid highway project subject to prevailing wage rates and Davis-Bacon wage standards. The scope encompasses drainage infrastructure (concrete pipe, drop inlets, manholes), grading, erosion and...
- The Virginia Department of Transportation is requesting bids for turn lane improvements on Route 52 in Wythe County (Smart Scale Project Number U000-139-260, C501), with bids due July 22, 2026 at 10:00 a.m. VDOT prequalification is required to bid. The project is federally funded under the Surface Transportation Program and subject to Davis-Bacon prevailing wage requirements. The scope encompasses clearing and grubbing, drainage infrastructure (concrete pipes, drop inlets, storm sewers), asphalt...
The Virginia Department of Transportation is inviting bids for roundabout construction on Route 646 in Prince George County, extending from 0.086 miles east of Route 630 to 0.310 miles north of Route 646, with bids due July 22, 2026 at 10:00 a.m. Prequalification is required. This project is federally funded through the Surface Transportation Program (FHWA Number STP-5A27(970)) and is subject to Davis-Bacon Act prevailing wage requirements and DBE participation standards. The scope encompasses site clearing and grubbing, storm sewer installation (15-inch, 18-inch, and 30-inch by 19-inch elliptical pipes), approximately 2,675 cubic yards of regular excavation and 10,187 cubic yards of borrow excavation, approximately 3,160 tons of asphalt concrete placement across three types, reinforced concrete pavement, curb and gutter installation, water main installation (6-inch through 16-inch diameter piping), erosion control, temporary traffic control, signage, pavement markings, and landscaping including trees, shrubs, and seeding. Work is performed in Prince George County. Contractors must comply with Virginia Department of Transportation 2020 Road and Bridge Specifications and 2022 supplements. Substantial completion is due August 6, 2027, with a disincentive of $1,350 per calendar day for delays beyond that date. The final project completion date is December 1, 2027. A five percent bid bond is required as a proposal guarantee. Prevailing wage rates are established by the U.S. Department of Labor, including electricians at $36.85 per hour plus $14.13 fringe, truck drivers at $15.53 to $18.25 per hour, and equipment operators and laborers at $12.89 to $24.66 per hour base rates with associated fringe benefits. The contract includes provisions for fuel, steel, and asphalt price adjustments at the contractor's option, with fuel adjustment factors ranging from 0.071 to 3.5 gallons per unit.
Name | Description | Size | Type | Posted |
|---|---|---|---|---|
829877vadotA73_111704.pdf | 2MB | 6/22/26 |