- The Pennsylvania Department of Transportation is requesting bids on the Soldier Bridge replacement project in Jefferson County, Winslow Township (State Route 2031, Section 555), with bids due July 30, 2026 and a public bid opening at 11:00 a.m. that same day. This is a federally funded project subject to the Build America, Buy America Act, which restricts use of foreign-manufactured materials with limited exceptions. Prequalification is required to submit bids. The scope encompasses demolition...
- The Pennsylvania Department of Transportation is requesting bids for the I-83 South Bridge AMTRAK Early Action Project on State Route 0083, Section OCS, in Dauphin County, Harrisburg, with bids due July 30, 2026. This is a state-funded (100 percent non-federal) construction project subject to prevailing wage requirements and mandatory contractor prequalification. The work spans 1,000 linear feet from South Front Street to Paxton Creek. The scope includes installation of drilled caisson...
- Delaware County Department of Public Works is seeking sealed bids for bridge maintenance and repairs at County Bridge #135 (4th Avenue over Stony Creek) and County Bridge #243 (2nd Avenue over Stony Creek) in Folsom, Pennsylvania, with bids due August 5, 2026 at 11:00 a.m. through PennBid and a pre-bid conference on July 14, 2026 at 10:00 a.m. at Bridge #135. Public works diversity goals require good faith efforts to achieve 10 percent local worker participation and 10 percent minority and...
- The Pennsylvania Department of Transportation is procuring on behalf of the City of Lebanon a North Lincoln Avenue Bridge replacement over the Quittapahilla Creek in Lebanon County, with bids due July 16, 2026 at 11:00 a.m. The project is federally funded and subject to Buy America and Build America Act requirements; prevailing wage rates apply. Prequalification of bidders is required; no pre-bid meeting is scheduled. The scope is bridge replacement on State Route 7301, Section BRG, spanning 310...
- The Pennsylvania Department of Transportation is requesting sealed bids for demolition of six residential parcels and associated miscellaneous construction work on the PA 63/PA 309 Connector Phase 3 project in Hatfield and Hilltown Townships, Bucks and Montgomery Counties, with bids due July 30, 2026 at 11:00 a.m. This is a 100% state-funded project subject to prevailing wage requirements and contractor prequalification. The scope encompasses lump-sum demolition of six parcels (132, 133, 134,...
- The Township of Lower Merion, Pennsylvania, is requesting sealed bids for the 2026 ADA Curb Cut Replacement project (Contract 26-20-0073-0049-0050), with proposals due July 9, 2026 at 11:00 a.m. via the PennBid Program. The Township encourages Minority Business Enterprise (MBE) and Women Business Enterprise (WBE) participation, and bidders must make best effort to hire minority and women business enterprises. The scope includes demolition of existing curb ramps, saw cutting and removal of...
The Pennsylvania Department of Transportation is requesting bids for Montgomery Run Bridge Renovation on State Route 1004 in Clearfield County, with bids due July 30, 2026 at 11:00 a.m. The scope includes furnishing and placing an 8'-0" x 5'-0" precast reinforced concrete box culvert with inlet and outlet sections over an unnamed tributary to Montgomery Creek, approximately 585 linear feet of approach paving using Superpave asphalt mixture designs (207 tons base course, approximately 139 tons wearing course), guide rail upgrades, and miscellaneous construction in Lawrence Township. Prequalification is required. The estimated contract value falls in the $500,000 to $999,999.99 range, with structure work comprising 42% of the total. The anticipated notice to proceed is September 14, 2026, and required completion is August 19, 2027. Prevailing wage requirements apply under the Pennsylvania Prevailing Wage Act. The contractor must comply with Equal Employment Opportunity provisions including systematic recruitment through minority publications and organizations, Worker Protection and Investment certification, erosion and sediment pollution control plans approved by the Clearfield County Conservation District, Build America Buy America Act provisions for federally-sourced materials, and Pennsylvania's Reciprocal Limitations Act regarding in-state bidder preferences. Diverse Business requirements apply to this non-federally funded construction project. The contractor must submit certified payroll records, material certifications, and as-built documentation including post-construction stormwater management requirements before final payment. Payment for stored materials may be authorized under specific conditions. No pre-bid meeting is scheduled. All addenda are posted electronically through the Electronic Contract Management System (ECMS).
Name | Description | Size | Type | Posted |
|---|---|---|---|---|
831273padot3410.pdf | 887KB | 7/1/26 |