IFB - Lift Station Decommissioning

Solicitation # 2025012
Posted 9/16/25, 2:00 AM
No Updates
Due 10/13/25, 6:00 PM
Source
View
Similar Opportunities
The Pagosa Springs Sanitation General Improvement District (PSSGID) is soliciting bids for a comprehensive sewer replacement project located in the McCabe Creek area north of Pagosa Springs, Colorado. The procurement involves replacing 1,350 linear feet of sewer pipe, including seven manholes along the existing alignment, with critical crossings over McCabe Creek and a ditch. Key project deliverables include utility infrastructure replacement, precise trench construction, creek crossing...
Parker Water & Sanitation District is seeking bids for the Denver Basin Well Sites Phase II and Pipeline project located in Douglas County, Colorado. The project encompasses the construction of an 8-inch raw water pipeline, Badger Gulch Well Site development, yard piping, meter vault installation, electrical and instrumentation work, gravel access road construction, and a blowdown pond. Key deliverables include developing approximately 6,500 feet of raw waterline connecting the Ridgegate...
Charlotte Water is soliciting sealed bids for the Sugar Creek Wastewater Resource Recovery Facility (WRRF) Influent Pump Station Building Stabilization project located at 5301 Closeburn Rd in Charlotte, NC. The procurement is a construction contract focused on arresting settlement of the Influent Pump Station Building's Electrical Room and Dumpster Room. Specific project deliverables include installing helical screw foundation piles or micropiles, pressure grouting the annual space beneath the...
The City of Aurora, Colorado is seeking a general contractor for a Stormwater Corrugated Metal Pipe (CMP) Rehabilitation project (Project No. 6083A) involving comprehensive infrastructure improvements. The procurement targets the rehabilitation of approximately 976 linear feet of CMP stormwater pipelines, including cleaning, inspection, point repairs, pipe replacement with reinforced concrete pipe, and cured-in-place pipe (CIPP) lining using steam and water cure techniques. Bidders must...

In 2022, PWSD completed the Cherry Creek Interceptor (CCI) pipeline project, which diverts a portion of flows from the District's South Water Reclamation Facility (SWRF) and allows flows from three (3) lift stations to be conveyed by gravity to the North Water Reclamation Facility (NWRF). This pipeline eliminated the need for the lift stations, which have since been taken offline and cleaned, and some equipment salvaged by District staff. The Contractor shall be responsible for assisting with salvage of additional equipment, installing plugs in discharge pipelines, demolition and hauling of remaining infrastructure, and restoration and revegetation of property to match surrounding conditions. The Contractor will also be responsible for demolition of several manholes that were bypassed when CCI was put into service.

Posted 9/16/25