- The South Carolina Department of Health and Environmental Control (DHEC) Underground Storage Tank (UST) Management Division issued a solicitation for groundwater sampling investigation services at regulated UST system facilities. The contract seeks a Certified UST Site Rehabilitation Contractor to perform comprehensive environmental sampling activities, including monitoring well sampling, gauging, potable well sampling, surface water sampling, and air sample collection. Estimated procurement...
- The South Carolina Department of Health & Environmental Control (DHEC) has issued an Invitation for Bid (IFB) solicitation for small scope assessment investigations at underground storage tank (UST) facilities in Richland County. The procurement seeks services to perform Initial Groundwater Assessments (IGWA), Tier I assessments, and monitoring well installations for petroleum releases at regulated UST sites, following the South Carolina UST Programmatic Quality Assurance Program Plan (QAPP)...
- The South Carolina Department of Health and Environmental Control (DHEC) issued Solicitation Number 5400021245 for Small Scope Assessment Investigations at Underground Storage Tank (UST) facilities throughout the state. The procurement seeks a certified Class I UST Site Rehabilitation Contractor to perform Initial Groundwater Assessments (IGWA), Tier I assessments, and monitoring well installations at petroleum release sites, with a focus on Richland County. The contractor must employ South...
- The South Carolina Department of Health and Environmental Control (DHEC) Underground Storage Tank (UST) Management Division issued an Invitation for Bid (IFB) solicitation for Tier II Environmental Assessment Investigations at Underground Storage Tank Facilities. The procurement seeks comprehensive environmental assessment services, including site-specific work plan preparation, receptor surveys, comprehensive surveys, ground penetrating radar surveys, soil borings, well installation, sample...
- The South Carolina Department of Health and Environmental Control (SC DHEC) is soliciting bids for Analytical Laboratory Services related to Underground Storage Tank (UST) environmental testing, with the procurement focused on comprehensive laboratory analysis of petroleum samples across multiple matrices including groundwater, drinking water, soil, air, and free-phase products. The solicitation (5400026807) requires contractors to perform analytical services with estimated quantities ranging...
- The South Carolina Department of Health and Environmental Control (DHEC) is procuring a Tier II Contract for Underground Storage Tank (UST) Environmental Assessment Investigations under Solicitation Number 5400024540. The primary objective of this procurement is to conduct comprehensive environmental remediation and assessment services for underground storage tank facilities within Richland County. Specifically, the contract requires contractors to perform site characterization, remedial...
- The South Carolina Department of Health and Environmental Control (DHEC) Underground Storage Tank (UST) Management Division is issuing an Invitation for Bid (IFB) for a Granular Activated Carbon (GAC) contract to install and maintain environmental remediation units at petroleum-contaminated sites throughout South Carolina. The solicitation requires bidders to be South Carolina-certified Site Rehabilitation Contractors (Class I or Class II) with an approved Annual Contractor Quality Assurance...
- The South Carolina Department of Health and Environmental Control (DHEC) has issued an Invitation for Bid (IFB) for Analytical Laboratory Services for Petroleum Samples, specifically targeting regulated underground storage tank (UST) sites in Richland County. The procurement seeks a laboratory capable of analyzing samples from soil borings, monitoring wells, drinking water wells, surface water features, and ambient air at sites with petroleum releases. Required analytical services include...
- The South Carolina Department of Health & Environmental Control (DHEC) has issued an Invitation for Bid (IFB) for comprehensive underground storage tank (UST) removal and environmental assessment services across seven abandoned retail fuel facilities in the state. The project requires a qualified contractor to remove USTs, conduct limited environmental assessments, and perform site remediation at locations including Stuckeys Convenience Store, Nickelpumper 233, Rhode Shop Rite, Curlee...
- The South Carolina Department of Health and Environmental Control (DHEC) has issued an Invitation for Bid for corrective action services related to Underground Storage Tank (UST) Permit #08424 located at Max Brian, 8910 Highway 9, Inman, South Carolina. The procurement seeks a South Carolina-certified Class I Site Rehabilitation Contractor to perform comprehensive environmental remediation, focusing on preventing further migration of free-phase product and reducing chemical concentrations to...
The South Carolina Department of Health and Environmental Control (DHEC), Underground Storage Tank (UST) Management Division, is procuring groundwater sampling services for petroleum release sites throughout the state via an Invitation for Bid (IFB). The contract seeks two contractors to conduct comprehensive environmental investigations, including sampling of monitoring wells, public and private potable wells, surface water features, and air samples, with site-specific work plans (SSWPs) provided for each location. Contractors must be South Carolina Certified UST Site Rehabilitation Contractors and are required to accept a minimum of 24 SSWP requests monthly, submit SSWPs within 20 days of request, and perform sampling within 30 days of SSWP approval. The procurement requires contractors to complete detailed environmental procedures, including volumetric groundwater purging, water supply sampling, various sampling methodologies, report preparation, and mapping services. Key deadlines include a bid submission deadline of June 3, 2021, at 2:30 PM ET, with a non-mandatory pre-bid conference held on May 13, 2021, at 10:00 AM via Microsoft Teams. The contract term is one year with two one-year renewal options, potentially spanning a maximum of three years from June 14, 2021, to June 13, 2024. The solicitation does not specify explicit set-aside designations for disadvantaged businesses. Contractors must meet specific qualifications, including maintaining Commercial General Liability insurance of $1,000,000 per occurrence, Auto Liability of $1,000,000 per accident, and Worker's Compensation with statutory limits. All environmental reports must be signed and sealed by a licensed Professional Engineer or Professional Geologist registered in South Carolina. While specific budget ranges are not explicitly stated, the bid schedule includes unit costs for numerous sampling and reporting activities, suggesting a comprehensive and potentially substantial contract value. The procurement will award contracts to the two lowest responsive and responsible bidders, with the lowest bidder designated as the principal contractor and the next lowest as the secondary contractor. Late fees of $25 per day (not exceeding 20% of the total agreement cost) will be applied for missed deadlines. All activities will be funded by the UST Management Division, with a laboratory contractor providing sample containers and covering sample shipment costs.
Name | Description | Size | Type | Posted |
|---|---|---|---|---|
SOLICITATION.pdf | 745KB | 11/20/25 | ||
ATTACHMENT A- BID SCHED.xlsx | 15KB | Spreadsheet | 11/20/25 | |
ATTACHMENT B- QAPP 4.0.pdf | 3MB | 11/20/25 | ||
NOTICE OF INTENT TO AWARD.pdf | 19KB | 11/20/25 | ||
AMENDMENT 1.pdf | 341KB | 11/20/25 |