Groce Creek Structure & Approaches (Wilmar) (S)
- The Arkansas Department of Transportation is soliciting bids on State Job No. 061748 to replace one bridge on Highway 600 (Mill Creek Structure & Approaches) in Garland County under a Federal-Aid Highway Construction Project, with bids due June 24, 2026. Potential bidders must contact ARDOT at pmd@ardot.gov or 501-569-2261 to become eligible bidders no later than 4:30 p.m. the day prior to letting. The scope includes clearing and grubbing, removal and disposal, earthwork, aggregate base...
- The Arkansas Department of Transportation is requesting sealed bids for bridge replacement and road reconstruction on Johnson Creek Structure & Approaches (State Job No. BR2814, Federal Aid Project BFPO-STPB-0028(61)) in Greene County, with bids due June 24, 2026. This is a federal-aid highway construction project subject to Davis-Bacon prevailing wage, Buy America material requirements, and FHWA oversight. The scope includes clearing and grubbing, removal and disposal of existing items,...
- The Arkansas Department of Transportation (ARDOT) is soliciting bids for construction of a quintuple 12' × 8' reinforced concrete box culvert and roadway approaches on Bredehoeft Road in Springtown, Benton County, under State Job No. CB0401 (Federal Aid Project BFPO-STPB-0004(81)), with bids due June 24, 2026. This is a federally funded project subject to Davis-Bacon wage requirements and prevailing wage determinations. The scope encompasses clearing and grubbing, earthwork, aggregate base...
- The Arkansas Department of Transportation (ARDOT) is soliciting bids on mill and overlay improvements to approximately 5.876 miles of Highway 7 in Garland County, with bids due June 24, 2026. This is a Federal Aid Project (STPSC-9210(62), State Job No. A60063) subject to Davis-Bacon wage requirements and DBE program requirements under 49 CFR Part 26. The scope includes asphalt concrete hot mix (ACHM) surface course installation, cold milling of existing asphalt pavement, ACHM patching,...
- The Arkansas Department of Transportation is soliciting bids on an overlay project covering approximately 0.63 mile of Drier Road and Leder Road in Arkansas County (Job SA0148), with proposals due June 24, 2026 at 10:00 a.m. This is a state aid county job subject to Arkansas State Highway Commission Standard Specifications for Highway Construction, Edition of 2014, and supplemental specifications addressing asphalt mixture design, recycled asphalt pavement quality control, and MASH-compliant...
- The Arkansas Department of Transportation is soliciting bids for an overlay of approximately 2.14 miles of County Road 8060 in Marion County (State Job No. SA4555), with proposals due June 24, 2026 at 10:00 a.m. Prospective bidders must register with ARDOT (pmd@ardot.gov or 501-569-2261) by 4:30 p.m. the day prior to the letting to become eligible. The scope includes aggregate base course, asphalt concrete hot mix surface course, ACHM patching, cold milling, pavement marking, maintenance of...
- The Arkansas State Highway Commission (ARDOT) is requesting bids for milling and inlay work on approximately 2.909 miles of Highway 71B in Benton County under State Job No. A90046, Federal Aid Project NHPP-9373(37), with bids due June 24, 2026. This is a Federal-aid highway project subject to Davis-Bacon prevailing wage requirements, Equal Employment Opportunity compliance, and related federal labor standards including Title VI of the Civil Rights Act, Section 504 of the Rehabilitation Act,...
- The Arkansas Department of Transportation is requesting bids on an asphalt overlay project in Eudora, Chicot County, covering approximately 1.31 miles of various city streets, with bids due June 24, 2026 at 10:00 a.m. under State Job No. C09008. The scope consists of asphalt concrete hot mix surface course, ACHM patching, maintenance of traffic, and miscellaneous items. Work must be completed by November 25, 2026. Bidders must comply with ARDOT's Standard Specifications for Highway...
- The Arkansas Department of Transportation is requesting sealed bids for the Bobby Harper Tunnel Pavement Friction Improvements project on Interstate 49 in Washington County, State Job No. A40056, with bids due June 24, 2026. Prospective bidders must be prequalified with ARDOT and registered to bid through Bid Express; authorization is required by contacting the Program Management Division at (501) 569-2261 no later than 4:30 p.m. the day prior to bid opening. The project encompasses overlay with...
- The Arkansas Department of Transportation is requesting sealed bids for highway reseal work on approximately 1.80 miles of Crossroads Road in Prairie County, State Job No. SA5955, with proposals due June 24, 2026 at 1:30 p.m. The scope consists of ACHM surface course, single asphalt surface treatment, pavement markings, maintenance of traffic, and miscellaneous items. Work must begin when ordered by the Engineer or within ten days of contract award, with project completion required by October...
The Arkansas Department of Transportation (ARDOT) is soliciting bids for the Groce Creek Structure & Approaches project in Wilmar, Drew County, with proposals due June 24, 2026. Prospective bidders must register with ARDOT at pmd@ardot.gov or 501-569-2261 by 4:30 PM the day prior to the letting to establish eligibility. The scope consists of replacing one bridge structure and constructing approaches on 0.043 mile of 7th Street, including clearing and grubbing, earthwork, aggregate base course, ACHM surface course, maintenance of traffic, erosion control items, pavement marking, one triple reinforced concrete box culvert with a total span of 35.33 feet, and miscellaneous items. The project is governed by the Arkansas State Highway Commission Standard Specifications for Highway Construction (2014 Edition) and supplemental and special provisions. Contractors must hold current licenses or registrations with the Arkansas Contractors Licensing Board for work valued at $50,000 or more and must provide evidence of subcontractor licensing. Bids must be submitted electronically and include bid bonds arriving by the specified deadline. Mobilization costs are limited to five percent of the subtotal. Minimum and maximum unit bid prices apply to asphalt binder, water, and precast concrete barrier relocation. The project is subject to environmental constraints including restrictions on tree clearing from May 1 through July 31 to protect Northern Long-eared bats, and prohibitions on demolition or construction of structures from March 1 through August 31 without written engineer approval to protect migratory bird nesting sites. Excavations within wellhead protection areas are limited to ten feet below normal ground surface. Liquidated damages are assessed on a working-day basis, ranging from $140 for projects under $100,000 to $3,500 for projects exceeding $30 million. All addenda must be acknowledged in the proposal submission.
Name | Description | Size | Type | Posted |
|---|---|---|---|---|
Bid Notice-Groce Creek Structure _ Approaches (Wilmar) (S).pdf | 3MB | 5/27/26 |