Bridge Program RFP

Solicitation # 0557357573202
Posted 8/20/25, 2:00 AM
No Updates
Due 9/17/25, 6:00 PM
Source
View
Similar Opportunities
The Town of Buena Vista is seeking qualified contractors for the Whipple Bridge Deck Replacement Project, a procurement focused on infrastructure rehabilitation in the Buena Vista River Park. The project requires complete removal and replacement of existing timber decking and rub rails on the Whipple Trail Bridge, originally constructed in the early 1990s. Contractors must replace decking with 3x12 Douglas Fir Select Structural materials and 2x6 Douglas Fir #1 rails, with key objectives...
The state and local contract opportunity posted by Colorado and Arapahoe County involves a bridge repair project designated as OAAA, 2010, 082517 RTI Bridge Repair. The procurement appears to be focused on infrastructure maintenance and rehabilitation for a specific transportation infrastructure asset. The opportunity was officially posted on August 19, 2025, with proposals due by September 12, 2025, indicating a relatively standard procurement timeline of approximately three weeks for...
The Town of Firestone, located in Weld County, Colorado, is seeking an on-call traffic engineering consultant through a Request for Proposal (RFP) issued on August 4, 2025. The procurement is for comprehensive traffic engineering services, including development review, traffic engineering analysis, traffic operations and signal support, planning and policy support, public engagement, and additional technical services. Proposing consultants must submit a comprehensive proposal no more than 10...
The state and local contract opportunity pertains to a bridge repair project designated as OAAA, 2010, 082517 RTI Bridge Repair, located in Arapahoe County, Colorado. The procurement is specifically focused on comprehensive bridge infrastructure rehabilitation and repair services, with a targeted solicitation for qualified engineering and construction firms capable of executing complex transportation infrastructure maintenance. The contract was officially posted on August 14, 2025, with...

The Town of Snowmass Village, Colorado, is seeking proposals for a Bridge Program Master Planning project through a Request for Proposals (RFP) issued on August 20, 2025. The procurement targets a comprehensive maintenance strategy for 13 off-system bridges within town limits, including 4 non-major and 9 major vehicular bridges constructed between 1980 and 2023. Qualified engineering teams will be responsible for developing a master maintenance plan to proactively preserve bridge infrastructure, with specific deliverables including detailed bridge inspections, master planning documents with prioritized annual projects, and construction documents for the top prioritized project. The RFP requires proposers to submit a comprehensive team summary, similar project experience, team resumes, proposed schedule, and detailed pricing breakdown. Evaluation criteria will focus on team portfolio, project experience, schedule, proposal quality, and cost. Key dates include a pre-proposal online conference on September 2, 2025, at 10:00 AM, proposal submissions due by September 17, 2025, at 2:00 p.m., anticipated contract award during the week of September 22, 2025, and project completion expected by July 15, 2026.

While no specific set-aside designations or restrictions on respondent types are explicitly mentioned, the RFP suggests a competitive procurement process open to engineering firms with demonstrated bridge infrastructure expertise. The project budget is currently set at $250,000 for planning and design work, covering comprehensive bridge assessment and master planning. The bridges include various types such as Concrete Double T Prestress Girder, Concrete on I-beam, Concrete Slab, Concrete Rigid Frame, Concrete Box Girder, and Timber Laminated Girder. Recent repairs to Bridge SNO 7 (Wood Bridge) have already been completed, including new decking, siding, and structural girder repairs, which will be considered in the overall planning approach. The 2024 CDOT inspection reports indicate that all bridges are currently in fair to good condition, with the master planning effort aimed at maintaining this status and preventing future major repair requirements. Existing documentation, including inspection reports and as-built repair plans, will be provided to support the selected engineering team's planning process.

Generated 8/20/25, 8:46 PM