ADVANCED WATER PURIFICATION PROGRAM - TRES RIOS
- The City of Tucson is conducting a competitive procurement for a Construction Manager at Risk (CMAR) contract to perform internal pipe renewals on critical water transmission mains using Carbon Fiber Reinforced Polymer (CFRP) rehabilitation techniques. The solicitation targets concrete pressure pipe infrastructure, with potential project locations including Columbus Blvd 54in Pipeline, Valencia Rd, and pipelines ranging from 48" to 96" in diameter. Proposing firms must demonstrate...
- The City of Tucson and Tucson Water are seeking bids for the Mission Manor Main Replacement Phase III project, Invitation for Bid (IFB) No. 260107, located in the Mission Manor Neighborhood between Valencia Road and W. Bilby Road. The comprehensive infrastructure project involves relocating water distribution mains from alleys to streets, which includes installing approximately 24,000 linear feet of 6 and 8-inch ductile iron pipe, 429 water service connections, and 35 fire hydrants. The...
- The City of Phoenix is seeking qualifications for a Galvanized Water Service Line Replacement (WIFA) 2-Step Job Order Contract to address infrastructure needs related to the Lead and Copper Rule Revision (LCRR). The procurement will replace substandard water service lines on both city and customer sides of water meters, with qualifications to be submitted via the City's eProcurement Portal before 12:00 PM on May 30, 2025. The selection process will identify up to three contractors through a...
- Pima County has issued an Invitation for Bids (IFB-2500018281) for Digester and Centrifuge Sludge Feed Tank Cleaning services at the Tres Rios Water Treatment Facility located in Tucson, Arizona. The multi-supplier contract seeks to establish a framework for cleaning six digesters, each with a 1.5 million gallon capacity, with an anticipated cleaning of one digester per year. Suppliers must have been in business for at least three consecutive years and possess a Confined Space Entry Program that...
- The Pima County Regional Flood Control District is seeking Statements of Qualifications (SOQs) from engineering firms to provide comprehensive design services for the Drexel to Valencia East Bank Restoration project located in Tucson, Arizona. The primary scope involves conducting a feasibility study and preparing design documents for a proposed Soil Cement Bank Protection and River Park along the east bank of the Santa Cruz River between Drexel Road and Valencia Road. Design services will focus...
- The City of Tucson is seeking a consulting firm to develop a city-operated solar empowerment program for low-income single-family homeowners through Request for Proposal (RFP) No. 240128. The primary objective is to increase solar energy adoption among low-income households, with a specific goal of ensuring a minimum 20% reduction in participants' monthly energy bills. The consultant will be responsible for comprehensive program development, including assessing the local solar market,...
The City of Tucson Water Department is seeking a Progressive Design-Build (PDB) contract for the Advanced Water Purification Program at the Tres Rios site, located in Pima County, Arizona. The project aims to design and construct an Advanced Water Purification Facility (AWPF) capable of producing 2.5 million gallons per day (MGD) of potable water through advanced treatment of secondary effluent from the Tres Rios Water Reclamation Facility. Key deliverables include multiple design packages (Preliminary Design Report, 30%, 60%, and 100%), comprehensive cost models, procurement plans, and risk registers, with a collaborative approach to project execution. The procurement will be conducted through a two-step process, with an initial evaluation of Statements of Qualifications (SOQs) followed by interviews with shortlisted firms. Evaluation criteria will be weighted as follows: 45% Project Approach, 25% Relevant Project Experience, 20% Project Team Structure and Key Personnel, 5% Design-Builder Profile, and 5% Subcontractor Selection Plan. The RFQ was published on October 15, 2025, with a pre-submittal meeting scheduled for November 3, 2025, and SOQs due on December 17, 2025. The project is anticipated to be completed by June 1, 2031. The procurement includes Disadvantaged Business Enterprise (DBE) provisions and is subject to Davis-Bacon and Related Acts (DBRA) labor standards. Small Business Enterprise (SBE) program provisions apply to this contract, which requires contractors to demonstrate good faith efforts to include small businesses as prime contractors, subcontractors, joint venture partners, or suppliers. The project has a substantial funding commitment from the Bureau of Reclamation, with a total project budget of $86.7 million. Contractors must comply with specific requirements, including prevailing wage rates, overtime regulations, and certified payroll submissions. The project emphasizes collaborative delivery, with the Design-Builder expected to work closely with Tucson Water, HDR Engineering Inc. (Owner's Advisor), and an Operations Manager at Risk (OMAR). Subcontractors must be carefully selected and documented, with potential consequences for non-compliance including withholding payments, contract termination, and disqualification from future bidding. The project is part of Tucson's broader One Water 2100 Plan, aimed at diversifying water resources and addressing water supply challenges, including PFAS-related well shutdowns.
Name | Description | Size | Type | Posted |
|---|---|---|---|---|
RFQ_260120_Technical_Attachments.pdf | 35MB | 10/15/25 | ||
RFQ_260120_Detailed_Evaluation_Criteria.pdf | 134KB | 10/15/25 | ||
SBE_Provisions_Revised_May_2024_Includes_Subcontractor_Modification_Form.docx | 337KB | Document | 8/19/25 | |
BOR_Terms_and_Conditions.pdf | 160KB | 10/15/25 | ||
Offer_and_Acceptance.pdf | 87KB | 8/19/25 |