Z1NZ--Replace Fire Pump Controllers, Design-Build
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 36C24421R0099
- Agency
- Veterans Integrated Service Network 4 Veterans Health Administration, Department of Veterans Affairs
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- PSC
- Z1NZ Maintenance Of Other Utilities
- Place of performance
- Lebanon VA Medical Center 1700 S Lincoln Avenue
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 4 seeks design-build services to replace three fire pump controllers and associated equipment at the Lebanon VA Medical Center in Lebanon, Pennsylvania. A two-phase evaluation process will be conducted to select a prime contractor that is a SDVOSB and partners with an engineering firm to complete designs and construction. Phase I submissions are due by September 7, 2021 and will be evaluated to determine which offerors qualify for Phase II. Phase II will be awarded as a firm-fixed-price contract to the best value offeror based on technical evaluation factors and price.
There is no set-aside designated for this requirement. The primary NAICS code is 236220 for commercial and industrial building construction with a size standard of $39.5 million. The project scope must be completed in accordance with all applicable regulations and is estimated to cost between $250,000 and $500,000. Design and construction services shall provide replacement of the three fire pump controllers within existing buildings at the Lebanon facility and be completed within 180 days of notice to proceed.
Notice text
POSTING - Solicitation AND ATTACHMENTS for PHASE I
The Veterans Integrated Service Network #04 (VISN 04) Contracting Office / Lebanon Veteran Administration Medical Center is issuing the attached solicitation with attachments and subsequently the VA intends on awarding a single, Firm-Fixed-Price contract that will be the Best Value to the Government based on evaluation factors and price. The project will be for the selection of a prime contractor (Construction contractor NAICS code 236220 Commercial & Industrial Building & Construction, with a size standard of $39.5 million). The prime contractor to contract/partner with an architect/engineering firm to provide design-build services necessary for completion of designs and the objective Replace Fire Pump Controllers (This is a Design-Build project).
Note: This notice is for Phase I submittals only at this time. ALL Qualified PHASE I Offerors that are 100% SDVOSB may submit for Phase I. After Phase I evaluation is complete, ONLY Offerors that are selected for Phase II will be notified with instructions for Phase II proposal submission
Project Scope Summary
The Design-Build team shall provide all, labor, materials, tools and equipment, and design-build services necessary for design and construction of a project described here along with other specified tasks as further defined in a request for proposal (RFP) for Replace Fire Pump Controllers Project No. 595-22-104. The project shall be designed and completed in accordance with current VA guidelines, EPA requirements, VA Specifications and developed specifically to meet local requirements for the Lebanon VA Medical Center in Lebanon PA. The resultant contract of this procurement is to provide required design completion of the referenced project and perform construction of completed design work.
Selection/Administration:
This project is a Best Value two-phase design-build solicitation. The Phase I offers will be evaluated to determine which of the offerors will be selected to make an offer in Phase II of the solicitation. The Request for Proposal shall set forth the requirements for responding to Phase I of the solicitation as well as all evaluation factors for both Phases I and Phase II.
Phase II solicitation will be issued in an amendment as a Request for Proposal (RFP) conducted in accordance with Federal Acquisition Regulations (FAR) Parts 36.3 and 15 and will be evaluated in accordance with the evaluation factors therein.
Total project anticipated between $250,000 and $500,000.
Attachments
| File | Type | Posted |
|---|---|---|
| S02 EXHIBIT B - Calculation of Self-Performed Work.docx | DOCX document | |
| P01 SOW - Replace Fire Pump Controllers.doc | DOC document | |
| S02 Solicitation 36C24421R0099 8-05-21.docx | DOCX document | |
| S02 Records Management Language for Contracts.docx | DOCX document | |
| S02 EXHIBIT A - Project Example.docx | DOCX document | |
| 36C24421R0099_2.docx | DOCX document | |
| S02 Wage Determination 7-23-21.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Replace Fire Pump Controllers - Design Build | Award Notice | |
| Z1NZ--Replace Fire Pump Controllers, Design-Build | Solicitation | |
| Z1NZ--595-22-104 Replace Fire Pump Controllers, Design-Build | Pre-Solicitation |