WY- KO refurbished breaker

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
140R6A20Q0004
Agency
Bureau of Reclamation Department of the Interior
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
238210 Electrical Contractors and Other Wiring Installation Contractors
PSC
5925 Circuit Breakers

Notice details come from SAM.gov. Updated .

Notice text

3 versions

Update #3 · Latest ·

Closing Date has been extended to Thursday, August 20, 2020, at 4:00 pm Mountain Time.

All other information in the Original Solicitation posted on July 30, 2020, remains unchanged.

All required documentation per the Performance Work Statement must be received in order for the quote to be considered.

Update #2 ·

Provide Additional Information

Update #1 ·

This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement and attachments constitute the only solicitation; proposals are being requested and a written solicitation will not be issued. Consider this solicitation (#140R6A20Q0004) as a Request for Quotes (RFQ). This solicitation documents and incorporates provisions and clauses in effect through Federal Acquisition Circular 2019-03. This solicitation is set-aside for small business. NAICS 238210. The small business size is $16.5 million. The resulting purchase order will be a firm-fixed price type contract.

Line Item #10 Westinghouse Breaker Refurbish

PERFORMANCE WORK STATEMENT

1.0 BACKGROUND

A Westinghouse 75-DHP-250 medium voltage breaker needs to be refurbished. This is a spare breaker at Kortes power plant that has been scavenger for parts to keep the unit breakers operational. The Contractor will have to replace the latch pin, trip coil, and close coil in this breaker for they have been removed and used in another breaker.

2.0 SCOPE

Complete refurbishment of the breaker back to like new condition

2.1 LOCATION

The work to be performed under this contract will be performed at the contractor's facility.

2.2 SHIPPING:

The medium voltage breaker will be packaged by the Bureau of Reclamation (Reclamation). Reclamation will provide forklift and personnel to load and unload the breaker at Reclamation's warehouse. The FOB destination is Bureau of Reclamation, 205 Chamberlain Rd. Mills WY 82644. The contractor will contact the Contract Specialist Audrey Whetham at 307-261-5619 or e-mail at awhetham@uabr.gov three days before picking up and before returning with the date and the time they will be at Reclamation, so the forklift and personnel are available. Loading hours are Monday through Thursday from 7:30 am to 4:00 pm excluding weekends and federal holidays.

The weight of the medium voltage breaker is approximately 750 pounds. Its dimension are 73.8" H x 31.25" W x 36.27" D

3.0 TASKS

Visual Inspection and Operational Testing - Visually inspect circuit breaker for any missing or damaged components prior to commencement of testing. Record breaker nameplate, operations counter and any anomalies found. A detailed Inspection report documenting all test results, observations, findings and recommendations will be prepared as described in Task E below. All test equipment shall have a NIST traceable certification, include a copy of the NIST certificates as part of the inspection report.

Perform "as-found" inspection and operational testing, consisting of:

a. Check condition of Arc chutes.

b. Check contact wipe.

c. Check contact gap.

d. Check phase insulators.

e. Check mechanical integrity of all moving parts.

f. Check interphase barriers.

g. Check frame and all castings for cracks.

h. Check operation of racking mechanism.

i. Check finger clusters.

j. Check auxiliary switches, wiring, and contacts (change of state).

k. Check all position indicators and operations counter.

l. Check minimum and maximum coil operating voltages.

m. Check manual and electric open and close operations.

n. Check for proper operation of anti-pump feature.

o. Check for proper operation of electrical and mechanical safety interlocks.

p. Check for proper operation of racking device and check interlocks.

q. Check geared motor.

r. Check under-voltage release.

s. Check opening and closing release.

Perform insulation resistance (megger) testing. All testing will be performed at 15kVDC. Individual tests on primary current carrying components will be performed to include phase to phase, phase to ground, and testing of each pole piece, with the main contacts open. Minimum acceptance value is 1G ohm or greater.

Insulation resistance checks of secondary (control) circuits, to ground, will be conducted.

Testing of the spring charging motor will be conducted at 500VDC. Minimum acceptance value is 2M

ohm or greater.

Perform circuit breaker opening and closing tests at normal operating control voltage.

Perform main contact resistance checks (Ductor Test).

Test for proper operation of applicable circuit breaker trip features.

Refurbishment - The circuit breaker is to be disassembled to sub-assembly and individual component level as follows. Each component will be thoroughly cleaned and inspected for cracks, deterioration, or worn areas with special consideration given to latch surfaces, cams, rollers, followers, and pivot areas. Equipment that is found to be excessively worn is to be replaced. Standard refurbish kit(s) used by the contractor shall be listed in detail in the initial bid.

Replace with new all bearings, trip coils, closing coils, and closing latch pivot pin

The operating mechanism, main contact moving and stationary assemblies, draw-out bar assembly and

jackshaft assembly will completely disassembled to the individual component level.

Any moving parts and/or components on other sub-assemblies requiring lubrication will also be

disassembled.

Control devices will be disassembled to check for internal damage. The electrical control device

will be disassembled and inspected for worn/degraded contacts, proper formation of armatures and

cracked housings.

Limit switch contacts will be burnished and/or polished as required.

Coils will be checked, as will all terminal connections.

Plate components that show excessive wear to the plated surfaces

Breaker Re-Assembly - All parts found to be worn excessively worn are to be replaced

Each individual moving component, including pivot pins, needle, roller and sleeve bearings, thrust

washers; cams and gears will be lubricated per specific manufacturer's standards.

All latches, roller clearances, adjustable spring tensions and mechanical adjustments within the

operating mechanism will be setup per the applicable manufacturer's specification and/or

instruction bulletin.

Main and arcing contact simultaneous make and wipe (main contact pressure) will be adjusted per

manufacturer's specifications.

The auxiliary circuits of the circuit breakers shall be rewired using conductor rated for 600V with

XHHW or THHN insulation capable of withstanding 60°C temperature rise above ambient. Conductor

ampacity ratings shall meet or exceed that of the original manufacturer. Ring type terminals shall

be used for termination of all control wiring where applicable. These lugs shall be installed with

tooling certified for the particular type and brand of lug to be installed.

Final Testing- As Left - Perform "as-left" electrical and operational testing, consisting of:

Perform operational testing to include:

a. Manual and electrical functional operation tests.

b. Check pick-up, minimum and maximum coil operating voltages.

c. A minimum of five (5) manual and five (5) electrical functional operational tests.

d. Verify proper operation of anti-pump feature

e. Verify proper operation of electrical and mechanical safety interlocks.

f. Check operation of indicating devices, including all visual indicators & operational counter.

Perform circuit breaker opening and closing timing tests at normal operating control voltage.

Perform main contact resistance checks (Ductor). Maximum acceptable readings will be per

manufacturer specifications.

Documentation - The following documentation shall be provided for each circuit breaker traceable by serial number.

A report of the "As-found" operation and condition.

A listing of all components replaced.

A report on the all testing conducted

3.1 GENERAL WORK PLAN

The contractor shall provide a written work plan along with their initial quote. At a minimum, the written work plan shall address all the items listed in section 3.0 Task

3.2 COMPANY EXPERIENCE

Company experience is an objective criterion that determines whether the contractors has or has not performed similar work. Therefore, the contractor shall furnish a list (no more that five) of Federal, State, or commercial projects similar in scope, complexity, and magnitude to the work required under this solicitation that the contractor has completed with the last three (3) years. These projects must clearly demonstrate the contractor's successful ability to accomplish projects in a timely and satisfactory manner. At a minimum, the contractor shall provide the following information for each project:

Name of the Customer (Agency or Commercial)

Contractor number, type, date, name of project

Description of the Work

Initial contract amount and final contract amount

Name, telephone number, and e-mail address of a point of contact for the customer that may be contacted to confirm and verify the information provided

Award will be made to the responsible offeror submitting a quote which conforms to the solicitation and is the most advantageous to Reclamation, considering the factors and any significant sub-factors listed in this purchase order.

In the evaluation of quotes, all evaluation factors (general work plan, company experience, price) other than cost or price, when combined, are considered to be significantly more important than cost or price. Included in evaluation is the attached Vendor Bid Evaluation Checklist.

Reclamation may not evaluate reference with incorrect or missing phone numbers and contact names, which may potentially result in a less favorable rating of the contractor's quote.

4.0 GOVERNMENT-FURNISHED PROPERTY & MATERIALS

The following table summarizes the description of Government property, cost if damaged or lost, unique item identifier and condition for the exciters that the Government will be releasing to the contractor while repairing.

Description of Property Quantity and Unit of Measure Acquisition Cost if Damaged or Lost Unique Item Identifier Condition

75-DHP-250

Breaker 1 each $1,199.99 Westinghouse Moderate

5.0 PERIOD OF PERFORMANCE

The term of the PO will be August 24, 2020 through December 31, 2020.

6.0 CONTRACTOR PERSONNEL

Contractor employees shall comply will all federal, state, and local laws.

7.0 CONTRACTOR QUALITY CONTROL PLAN

Quality control procedures shall ensure that bearing dimensions are within all requirements of the manufacturer instructions for a Porcel-Line DHP type Magnetic Air Circuit Breaker.

8.0 QUALITY ASSURANCE EVALUATOR (QAE)

The CO has designated the employee listed in Section 12 of this Performance Work Statement as the QAE to act as the authorized representative, who assists in the technical administration of the PO. The CO has not authorized the QAE to make any contractual commitments, or to authorize any contractual changes on the Government's behalf. If any doubt exists as to the extent of the authority of the QAE, the contractor shall contact the CO for guidance before taking action on the matter. The QAE will determine whether the contractor has satisfied the expected quality level as per the contractual requirements.

9.0 PERFORMANCE CRITERIA

The QAE will document acceptable and unacceptable PO performance. When the QAE considers the contractor's performance to be unsatisfactory, the QAE will report the information to the CO. The CO may require the contractor to explain, in writing, the cause of the poor performance, any corrective actions the contractor has already taken to obtain an acceptable level and any future corrective actions the contractor will utilize to prevent unacceptable performance.

The contractor's administration personnel may be required to meet with the QAE, as determined necessary, to discuss the contractor's performance, to include actual or potential problems. All parties shall make a mutual good faith effort to resolve any issues. All parties to the discussion shall review and sign written minutes of the meeting. Should the contractor not concur with the minutes, the contractor shall state any areas of non-concurrence in writing to the CO within 7 business days of receipt of the minutes. Whenever the CO issues a Purchase Order Discrepancy Report, the QAE will hold a meeting if the contractor requests such a meeting.

10.0 PERFORMANCE REQUIREMENTS SUMMARY TABLE (PRST)

The following table summarizes the tasks, the performance standard, monitoring method, and disincentives for not meeting performance standards.

Task Description

Performance Standard Method of Monitoring

Disincentives

All Tasks

All tasks with no deviation in timeliness or quality

100% Inspection

Reports

(1) Re-work at contractor's expense.

11.0 GOVERNMENT REMEDIES

All work shall be subject to inspection, approval, and acceptance by the Government. The Government will compare the contractor's performance to industry standards and will not exclude common sense considerations as applied by the QAE. The CO will follow the requirements of FAR Clause 52.212-4 for the contractor's failure to correct nonconforming services. The Government will consider work incomplete when any one of the following conditions exits:

- The contractor did not perform the task.

If the performance of any required service is unsatisfactory, and poor performance is clearly the fault of the contractor, the Government may reduce the PO price to reflect the reduced value of defective services, if the Government gives the contractor a written Purchase Order Discrepancy Report prior to executing such payment deductions.

The CO will determine the payment deduction amount by calculating the percentage of acceptable services performed by the contractor. The Government will use the total number of deficiencies found to determine the percentage found unacceptable. The percentage found unacceptable subtracted from 100 percent will determine the percentage acceptable.

12.0 RECLAMATION POINTS OF CONTACT

Audrey Whetham - Contract Specialist

Bureau of Reclamation - WYAO

P.O. Box 1630

Mills WY 82644

307-261-5619 (phone)

307-261-5691 (fax)

awhetham@usbr.gov

FOB Destination (Mills WY) do not list freight/shipping separately - see section 2.2 for shipping details.

In accordance with the procedures in FAR Part 12 and 13, RFQ Number 140R6A20Q0004 is available for viewing through electronic commerce via https://beta.sam.gov/.

The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation is the lowest price and technically acceptable.

The following provisions and clauses apply to this solicitation:

FEDERAL ACQUISITION REGULATIONS

1. 52.204-7 System for Award Management

2. 52.204-13 System for Award Management Maintenance

3. 52.204-16 Commercial and Government Entity Code Reporting

4. 52.204-18 Commercial and Government Entity Code Maintenance

5. 52.204-19 Incorporation by Reference of Representations and Certifications

6. 52.204-21 Basic Safeguarding of Covered Contractor Information Systems

7. 52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities

8. 52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment

9. 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment

10. 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations

11. 52.212-1 Instructions to Offerors - Commercial Items

12. 52.212-2 Evaluation - Commercial Items

13. 52.212-3 Offeror Representations and Certifications-Commercial Items

14. 52.212-4 Contract Terms and Conditions - Commercial Items

15. 52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders - Commercial Items

a. Specific FAR clauses included in 52.212-5 that are applicable to this requirement include: 52.219-28 Post Award Small Business Program Rerepresentation, 52.222-3 Convict Labor, 52.222-21 Prohibition of Segregated Facilities, 52.222-26 Equal Opportunity, 52.222-36 Equal Opportunity for Workers with Disabilities, 52.222-50 Combating Trafficking in Persons, 52.223-18 Encouraging Contractor Policies to Ban Text Messaging while Driving, 52.225-13 Restrictions on Certain Foreign Purchases, 52.222-41 Service Contract Labor Standards, 52.222-42 Statement of Equivalent Rates for Federal Hires, 52.222-55 Minimum Wages Under Executive Order 13658, 52.222-62 Paid Sick Leave Under Executive Order 13706

16. 52.219-6 Notice of Total Small Business Set-Aside (Deviation 2019-01)

17. 52.214-34 Submission of Offers in the English Language

18. 52.214-35 Submission of Offers in U.S. Currency

19. 52.222-49 Service Contract Labor Standards - Place of Performance Unknown

20. 52.225-1 Buy American - Supplies

21. 52.232-1 Payments

22. 52.232-33 Payment by Electronic Funds Transfer - System for Award Management

23. 52.232-39 Unenforceability of Unauthorized Obligations

24. 52.232-40 Providing Accelerated Payments to Small Business Subcontractors

25. 52.233-1 Disputes

26. 52.233-3 Protest after Award

27. 52.233-4 Applicable Law for Breach of Contract Claim

28. 52.237-2 Protection of Government Buildings, Equipment, and Vegetation

29. 52.242-15 Stop work Order

30. 52.245-1 Government Property Alternate I

31. 52.245-9 Use and Charges

32. 52.247-34 F.o.b. Destination

33. 1452.215-71 Use and Disclosure of Proposal Information - Department of the Interior

34. 1452.228-70 Liability Insurance - Department of the Interior

RECLAMATION ACQUISITION REGULATION

1. DOI - AAAP 0028 - Electronic Invoicing and Payment Requirements - Invoicing Processing Platform (IPP)

2. GP-7 Site Security

3. WBR 1452.223-81 Safety and Health Requirements

4. WBR 1452.223-82 Protecting Federal Employees and the Public from Exposure to Tobacco Smoke in the Federal Workplace

5. WBR 1452.225-82, Notice of World Trade Organization Government Procurement Agreement Evaluations--Bureau of Reclamation

6. WBR 1452.237-80 Security Requirements

Quotes are due no later than Wednesday, August 12, 2020, by 4:00 p.m. Mountain Time. Reclamation will consider all responsible sources who submit a timely quote for award. Contractors may submit quotes by e-mail to awhetham@usbr.gov or fax to 307- 261-5691.

NOTE: Effective August 1, 2012 any contractor to be awarded a government contract must be registered and active in System for Award Management (SAM). Contractors must register at www.sam.gov

Note: Contractor's must submit their Tax Identification Number and Data Universal Number with their offer

The Contractor agrees to perform the work required at the prices specified in the quote in strict accordance with the terms of this solicitation, if the offer is accepted by the Government in writing within 30 calendar days after the date responses are due.

For further information about this requirement, offerors should contact Audrey Whetham at awhetham@usbr.gov or call at 307- 261-5619.

Attachments

Files attached to this notice, newest first
File Type Posted
Sol_140R6A20Q0004_Amd_0002.pdf PDF
Sol_140R6A20Q0004_Amd_0001.pdf PDF
Westinghouse 75DHP500 Nameplate_0001.pdf PDF
Sol_140R6A20Q0004.pdf PDF
KO MV BRK VENDOR BID EVAL.pdf PDF
Performance Work Statement.pdf PDF
Wage Determination.pdf PDF
QSAP.pdf PDF

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
WY - KO Breaker Refurbish Award Award Notice
WY- KO refurbished breaker This notice · Latest solicitation Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity