QSAP.pdf
PDF 99 KB Posted
- Attached to
- WY- KO REFURBISHED BREAKER Federal contract opportunity
- Solicitation number
- 140R6A20Q0004
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140R6A20Q0004_Amd_0002.pdf | ||
| Sol_140R6A20Q0004_Amd_0001.pdf | ||
| Westinghouse 75DHP500 Nameplate_0001.pdf | ||
| Sol_140R6A20Q0004.pdf | ||
| KO MV BRK VENDOR BID EVAL.pdf | ||
| Performance Work Statement.pdf | ||
| Wage Determination.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN (QSAP)
Kortes Medium Voltage Circuit Breaker Refurbishment
DESCRIPTION WHAT WHO WHEN WHERE METHOD
A1 a Arc chutes.
Check condition
Vendor Upon arrival Vendor's facility
Vendor's facility b Contact wipe Check Vendor Upon arrival Vendor's facility
Vendor's facility c Contact Gap Check Vendor Upon arrival Vendor's facility
Vendor's facility d Phase insulators. Check Vendor Upon arrival Vendor's facility
Vendor's facility e Mechanical integrity of all moving parts. Check Vendor Upon arrival Vendor's facility
Vendor's facility f Interphase barriers. Check Vendor Upon arrival Vendor's facility
Vendor's facility g Frame and all castings for cracks. Check Vendor Upon arrival Vendor's facility
Vendor's facility
DESCRIPTION WHAT WHO WHEN WHERE METHODTASK
CONTRACT NO.:
CONTRACTOR:
CONTRACTING OFFICER
INSPECTOR(S)
TASK
h Operation of racking mechanism. Check Vendor Upon arrival Vendor's facility
Vendor's facility i Finger clusters. Check Vendor Upon arrival Vendor's facility
Vendor's facility j Auxiliary switches, wiring, and contacts (change of state). Check Vendor Upon arrival Vendor's facility
Vendor's facility k All position indicators and operations counter. Check Vendor Upon arrival Vendor's facility
Vendor's facility l Minimum and maximum coil operating voltages. Check Vendor Upon arrival Vendor's facility
Vendor's facility m Manual and electric open and close operations. Check Vendor Upon arrival Vendor's facility
Vendor's facility n Anti-pump feature.
Check for proper operation
Vendor Upon arrival Vendor's facility
Vendor's facility o Electrical and mechanical safety interlocks.
Check for proper operation
Vendor Upon arrival Vendor's facility
Vendor's facility
DESCRIPTION WHAT WHO WHEN WHERE METHOD
p Racking device and check interlocks.
Check for proper operation
Vendor Upon arrival Vendor's facility
Vendor's facility q Geared motor. Check Vendor Upon arrival Vendor's facility
Vendor's facility r Under-voltage release. Check Vendor Upon arrival Vendor's facility
Vendor's facility s Opening and closing release. Check Vendor Upon arrival Vendor's facility
Vendor's facility
A2 Insulation resistance Check Vendor Upon arrival Vendor's facility
Vendor's facility
All testing will be performed at 15kVDC.
Individual tests on primary current carrying components will be performed to include phase to phase, phase to ground, and testing of each pole piece, with the main contacts open.
Minimum acceptance value is 1GΩ or greater
DESCRIPTION WHAT WHO WHEN WHERE METHOD
A3 Insulation resistance of Secondary (control) circuits to ground Check Vendor Upon arrival Vendor's facility
Vendor's facility
Testing of the spring charging motor will be conducted at 500VDC.
Minimum acceptance value is 2MΩ or greater.
A4 Circuit breaker opening and closing Test Vendor Upon arrival Vendor's facility
Vendor's facility
At normal operating control voltage.
A5 Main contact Low resistance test
Vendor Upon arrival Vendor's facility
Vendor's facility
Ductor
A6 Circuit breaker trip features.
Test for proper operation
Vendor Upon arrival Vendor's facility
Vendor's facility
B1 All bearings, trip coils, closing coils, and closing latch pivot pin Replace Vendor During refurbishme nt
Vendor's facility
B2 Limit switch contacts Burnish or polish
Vendor During refurbishme nt
Vendor's facility
B3 Terminal connections Check and repair as needed
Vendor During refurbishme nt
Vendor's facility
C1 Individual moving components Lubricate Vendor During re-assembly
Vendor's facility
In accordance with equipment manufacturer's recommendations
DESCRIPTION WHAT WHO WHEN WHERE METHOD
C2 All latches, roller clearances, adjustable spring tensions and mechanical adjustments within the operating mechanism
Adjust Vendor During re-assembly
Vendor's facility
Per the applicable manufacturer’s specification and/or instruction bulletin.
C3 Main and arcing contact simultaneous make and wipe (main contact pressure) Adjust Vendor During re-assembly
Vendor's facility
Per manufacturer’s specifications.
C4 Wiring for the auxiliary circuits of the circuit breakers Replace Vendor During re-assembly
Vendor's facility
Use conductor rated for 600V with XHHW or
THHN insulation capable of withstanding 60°C temperature rise above ambient. Conductor ampacity ratings shall meet or exceed that of the original manufacturer. Ring type terminals shall be used for termination of all control wiring where applicable. These lugs shall be installed with tooling certified for the particular type and brand of lug to be installed.
a Manual and electrical functions Operation Test
Vendor During as-left testing
Vendor's facility
DESCRIPTION WHAT WHO WHEN WHERE METHOD
b Coil
Check pick-up, minimum and maximum coil operating voltages.
Vendor During as-left testing
Vendor's facility c Breaker manual and electrical operations Test Vendor During as-left testing
Vendor's facility
A minimum of five (5) manual and five (5) electrical d Anti-pump feature Verify proper operation
Vendor During as-left testing
Vendor's facility
D1 e Electrical and mechanical safety interlocks.
Verify proper operation
Vendor During as-left testing
Vendor's facility f Indicating devices, including all visual indicators & operational counter.
Check operation
Vendor During as-left testing
Vendor's facility
D2 Circuit breaker opening and closing timing Test Vendor During as-left testing
Vendor's facility
At normal operating control voltage.
D3 Main contact resistance checks Low resistance test
Vendor During as-left testing
Vendor's facility
Maximum acceptable readings will be per manufacturer specifications.
E1 "As-found" operation and condition. Report Vendor Preparing reports
Vendor's facility
E2 All replaced components replaced Report Vendor Preparing reports
Vendor's facility
DESCRIPTION WHAT WHO WHEN WHERE METHOD
E3 All testing performed Report Vendor Preparing reports
Vendor's facility
Sheet1