Whitetail Dam Reconstruction

Closed Pre-Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest solicitation from .

Solicitation number
140L3621R0001
Agency
Bureau of Land Management Department of the Interior
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Z2KA Repair Or Alteration Of Dams
Place of performance
Carter County Alzada Mt Usa

Notice details come from SAM.gov. Updated .

About this opportunity

The Bureau of Land Management, Montana State Office intends to solicit proposals to reconstruct Whitetail Dam located 27.4 miles northwest of Alzada, Montana. Work will include dewatering the reservoir and construction area, excavating portions of the existing dam and foundation, reconstructing the dam embankment with fill and imported materials, and constructing a new principal spillway, outlet conduit, inlet structure, stilling basin, and road gravel surfacing. Evaluation will utilize the Lowest Price Technically Acceptable source selection procedure, with proposals due May 11th, 2021 and award anticipated for June 16th, 2021.

This acquisition is set aside for total small business and estimated between $500,000 to $1,000,000. The applicable NAICS code is 237990 for Heavy and Civil Engineering Construction, with a $39.5 million small business size standard. The successful contractor must commence work within 10 days of notice to proceed and complete all work within 167 calendar days, including final cleanup.

Notice text

The Department of Interior, Bureau of Land Management (BLM), Montana State Office intends to solicit proposals for repair of Whitetail Dam located in Carter County approximately 27.4 miles northwest of Alzada, Montana. BLM will issue Solicitation Number 140L3621R0001 via https://beta.sam.gov/search?index=opp, at the link provided in this notice. The principal components of the work to be performed include the following tasks:

1. Dewater reservoir and construction area.

2. Excavate a portion of the existing dam embankment and foundation to remove existing outlet works pipe and construction of the new outlet works.

3. Reconstruct the dam embankment including:

a. Placement of compacted fill from onsite borrow sources,

b. Placement of imported rock for riprap slope protection along a portion of the upstream face,

c. Placement and compaction of imported sand and gravel for internal filter and drain features.

4. Construct precast concrete spillway riser for a new principal spillway.

5. Construct concrete encased, precast reinforced concrete pipe outlet conduit.

6. Construct precast concrete low-level inlet structure.

7. Construct grouted riprap stilling basin.

8. Place road gravel surfacing along the crest of the dam.

9. Reclaim all disturbed areas including staging areas and temporary roads. Reclamation consists of preparation of the soil for seeding but does not include seeding. Seeding of the reclaimed areas will be completed by Others.

Pursuant to Part 15 and Part 36 of the Federal Acquisition Regulations, BLM intends to issue a Request for Proposal (RFP) on or around April 9, 2021. The estimated price range of this acquisition is between $500,000 and $1,000,000. BLM anticipates issuing the RFP under the total small business set-aside program. The applicable North American Industry Classification System (NAICS) Code is 237990 and the associated Small Business Size Standard is $39.5 Million.

This acquisition will utilize the Lowest Priced Technically Acceptable (LPTA) procedures to make a best value award. A firm-fixed priced contract is contemplated. Proposals will be due on or around May 11, 2021 at BLM's Montana State Office, 5001 Southgate, Billings, Montana.

The Government anticipates award of this procurement on or around June 16, 2021. The successful contractor will be required to commence work within 10 calendar days after the date the Contractor receives the notice to proceed and complete the entire work ready for use within 167 calendar days. The time stated for completion shall include final cleanup of the premises.

For further information about the requirement, offerors should contact Christine Mundt at cmundt@blm.gov or at (406) 896-5030.

All prospective contractors must be registered in the System for Award Management (SAM) in order to be eligible for award. If you have not updated SAM since October of 2020, you are advised to update early to be sure you are in compliance with the expanded Section 889 prohibitions on not using certain covered technology products.

The successful contractor shall electronically submit all payment requests for the anticipated contract through the U.S. Department of the Treasury's Invoice Processing Platform (IPP). If the contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the contractor must submit a waiver request in writing to the Contracting Officer with its offer.

Attachments

Files attached to this notice, newest first
File Type Posted
PSN-Dam Reconstruction_1.docx DOCX document

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Award Notice - Whitetail Dam Reconstruction Award Award Notice
Whitetail DAM reconstruction Latest solicitation Solicitation
Whitetail Dam Reconstruction This notice · Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity