Trinity intake remote operated vehicle inspection
Awarded Award Notice Posted
- Solicitation number
- R15PS00040
- Agency
- Bureau of Reclamation Department of the Interior
- Awarded
- to Refuse Solutions, Inc.
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- INR15PX00019 Federal contract award
- NAICS code
- 561990 All Other Support Services
- PSC
- Not on record
- Place of performance
- Trinity Dam Lewiston, California 96052, United States
Notice details come from SAM.gov. Updated .
Notice text
5 versions
Update #5 · Latest ·
Added: Oct 23, 2014 2:48 pm Modified: Nov 07, 2014 12:24 pmTrack Changes
Amendment 4 is being issued to extend the response due date from to 12:00 p.m. MT, Friday, November 7, 2014 to 8:00 a.m. MT, Thursday, November 13, 2014. All other terms and conditions remain unchanged.
Perform underwater inspection of the interior of the intake structure from the top of the intake structure to the fixed wheel gate (FWG) utilizing a remote operated vehicle (ROV) in accordance with the performance work statement and the attached specifications and drawings. Inspection will include high definition video (1080p) of the entire interior of the intake structure and sonar imaging capabilities to capture dimensions of critical areas of the intake structure. The objective is to completely and thoroughly document the condition of the trash rack structure, the face of hemispherical intake bulkhead, the condition of the interior concrete in the conduit and areas of any damage, the condition and dimensions of the hemispherical bulkhead seat surface, and the condition of the upstream face of the FWG. The inspection will include very detailed documentation of any observed damage or other abnormalities detected during the inspection. Footage from the video inspection will be used by Reclamation to generate a photogrammetric 3D model of the tunnel interior.
Update #4 ·
Added: Oct 23, 2014 2:48 pm
Modified: Nov 03, 2014 9:00 amTrack Changes
Amendment 3 is being issued to change the response due date from 12:00 p.m. MT, Monday, November 3, 2014 to 12:00 p.m. MT, Friday, November 7, 2014.
All other terms and conditions remain unchanged.
Perform underwater inspection of the interior of the intake structure from the top of the intake structure to the fixed wheel gate (FWG) utilizing a remote operated vehicle (ROV) in accordance with the performance work statement and the attached specifications and drawings. Inspection will include high definition video (1080p) of the entire interior of the intake structure and sonar imaging capabilities to capture dimensions of critical areas of the intake structure. The objective is to completely and thoroughly document the condition of the trash rack structure, the face of hemispherical intake bulkhead, the condition of the interior concrete in the conduit and areas of any damage, the condition and dimensions of the hemispherical bulkhead seat surface, and the condition of the upstream face of the FWG. The inspection will include very detailed documentation of any observed damage or other abnormalities detected during the inspection. Footage from the video inspection will be used by Reclamation to generate a photogrammetric 3D model of the tunnel interior.
Update #3 ·
Added: Oct 23, 2014 2:48 pm
Modified: Oct 29, 2014 11:26 amTrack Changes
Amendment 2 is being issued to include the quotation submittal instructions.
All quotations are to be sent via email to theContract Specialist with a courtesy copy to the Contracting Offer as follows:
Contract Specialist
Jennifer McCord
jmccord@usbr.gov
Contracting Officer
Synthia Archuleta
sarchuleta@usbr.gov
Amendment 1 is being issued to change this requirement from a small business set-aside to a full and open competition. All other terms and conditions remain unchanged.
Perform underwater inspection of the interior of the intake structure from the top of the intake structure to the fixed wheel gate (FWG) utilizing a remote operated vehicle (ROV) in accordance with the performance work statement and the attached specifications and drawings. Inspection will include high definition video (1080p) of the entire interior of the intake structure and sonar imaging capabilities to capture dimensions of critical areas of the intake structure. The objective is to completely and thoroughly document the condition of the trash rack structure, the face of hemispherical intake bulkhead, the condition of the interior concrete in the conduit and areas of any damage, the condition and dimensions of the hemispherical bulkhead seat surface, and the condition of the upstream face of the FWG. The inspection will include very detailed documentation of any observed damage or other abnormalities detected during the inspection. Footage from the video inspection will be used by Reclamation to generate a photogrammetric 3D model of the tunnel interior.
Update #2 ·
Added: Oct 23, 2014 2:48 pm
Modified: Oct 29, 2014 10:48 amTrack Changes
Amendment 1 is being issued to change this requirement from a small business set-aside to a full and open competition. All other terms and conditions remain unchanged.
Perform underwater inspection of the interior of the intake structure from the top of the intake structure to the fixed wheel gate (FWG) utilizing a remote operated vehicle (ROV) in accordance with the performance work statement and the attached specifications and drawings. Inspection will include high definition video (1080p) of the entire interior of the intake structure and sonar imaging capabilities to capture dimensions of critical areas of the intake structure. The objective is to completely and thoroughly document the condition of the trash rack structure, the face of hemispherical intake bulkhead, the condition of the interior concrete in the conduit and areas of any damage, the condition and dimensions of the hemispherical bulkhead seat surface, and the condition of the upstream face of the FWG. The inspection will include very detailed documentation of any observed damage or other abnormalities detected during the inspection. Footage from the video inspection will be used by Reclamation to generate a photogrammetric 3D model of the tunnel interior.
Update #1 ·
Added: Oct 23, 2014 2:48 pm Perform underwater inspection of the interior of the intake structure from the top of the intake structure to the fixed wheel gate (FWG) utilizing a remote operated vehicle (ROV) in accordance with the performance work statement and the attached specifications and drawings. Inspection will include high definition video (1080p) of the entire interior of the intake structure and sonar imaging capabilities to capture dimensions of critical areas of the intake structure. The objective is to completely and thoroughly document the condition of the trash rack structure, the face of hemispherical intake bulkhead, the condition of the interior concrete in the conduit and areas of any damage, the condition and dimensions of the hemispherical bulkhead seat surface, and the condition of the upstream face of the FWG. The inspection will include very detailed documentation of any observed damage or other abnormalities detected during the inspection. Footage from the video inspection will be used by Reclamation to generate a photogrammetric 3D model of the tunnel interior.
Attachments
| File | Type | Posted |
|---|---|---|
| SOW-PWS_Trinity_Intake_ROV_Inspection_(1).docx | DOCX document | |
| Trinity_River_ROV_T_C.rtf | RTF text file | |
| Drawings.pdf | ||
| COMBINED_SYNOPSIS_(1).docx | DOCX document |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity