Switchgear Replacement Building 30 at DLA Distribution San Joaquin CA DDJC

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
SP3300-23-B-0004
Agency
Distribution Defense Logistics Agency, Department of Defense
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
238210 Electrical Contractors and Other Wiring Installation Contractors
PSC
Z2NZ Repair Or Alteration Of Other Utilities
Place of performance
California 95304, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks replacement of the switchgear at Building 30 of the Defense Logistics Agency Distribution facility in San Joaquin, California. The contractor will demolish the existing substation equipment and install new 1000/1333 KVA dry type transformers, 15kV switches, and switchboards. The contractor must complete the work within 365 days of the notice to proceed, coordinate all power outages, and adhere to all safety and regulatory requirements. Proposals were due by August 31, 2023 and will be evaluated based on technical qualifications, past performance, and price.

This is a total small business set-aside solicitation. The primary NAICS code is 238210 and PSC code is R499. Potential incumbents include Lead Builders Inc., Midwest Electrical Construction, and GJC INC, who submitted bids between $2,670,000 and $4,800,646. The place of performance is the Defense Logistics Agency Distribution facility located at Tracy, CA 95304. The solicitation seeks replacement of switchgear for one building and requires completion of services within 365 days of award.

Notice text

4 versions

Update #4 · Latest ·

*****Bid Abstract Posted*****

*SEE ATTACHMENT Bid Abstract 23B0004*

******Amendment 0002 is being issue to Revise Bid Opening to August 31, 2023 at 3:00 PM eastern standard time. 

*SEE ATTACHMENT SP330023B00040002*

******Amendment 0001 is being issued to answer a vendor question.

*SEE ATTACHMENT SP330023B00040001*

See Solicitation Attached as "SP330023B0004 FINAL.PDF"

Note:  The following project description is for the purpose of general information and is not intended to include and describe every feature or item or to define the scope of work.

PROJECT DESCRIPTION:   

This project will consist of providing all labor, supervision, materials, tools, and equipment to the “Building 30 Switchgear Replacement” project.

The project includes the following work:

The work includes Contractor is to provide all labor, supervision, materials, tools, and equipment to replace building 30 Substation and related Switchgear per SOW and specifications.

SEE ATTACHMENTS

Update #3 ·

******Amendment 0002 is being issue to Revise Bid Opening to August 31, 2023 at 3:00 PM eastern standard time. 

*SEE ATTACHMENT SP330023B00040002*

******Amendment 0001 is being issued to answer a vendor question.

*SEE ATTACHMENT SP330023B00040001*

See Solicitation Attached as "SP330023B0004 FINAL.PDF"

Note:  The following project description is for the purpose of general information and is not intended to include and describe every feature or item or to define the scope of work.

PROJECT DESCRIPTION:   

This project will consist of providing all labor, supervision, materials, tools, and equipment to the “Building 30 Switchgear Replacement” project.

The project includes the following work:

The work includes Contractor is to provide all labor, supervision, materials, tools, and equipment to replace building 30 Substation and related Switchgear per SOW and specifications.

SEE ATTACHMENTS

Update #2 ·

******Amendment 0001 is being issued to answer a vendor question.

*SEE ATTACHMENT SP330023B00040001*

See Solicitation Attached as "SP330023B0004 FINAL.PDF"

Note:  The following project description is for the purpose of general information and is not intended to include and describe every feature or item or to define the scope of work.

PROJECT DESCRIPTION:   

This project will consist of providing all labor, supervision, materials, tools, and equipment to the “Building 30 Switchgear Replacement” project.

The project includes the following work:

The work includes Contractor is to provide all labor, supervision, materials, tools, and equipment to replace building 30 Substation and related Switchgear per SOW and specifications.

SEE ATTACHMENTS

Update #1 ·

See Solicitation Attached as "SP330023B0004 FINAL.PDF"

Note:  The following project description is for the purpose of general information and is not intended to include and describe every feature or item or to define the scope of work.

PROJECT DESCRIPTION:   

This project will consist of providing all labor, supervision, materials, tools, and equipment to the “Building 30 Switchgear Replacement” project.

The project includes the following work:

The work includes Contractor is to provide all labor, supervision, materials, tools, and equipment to replace building 30 Substation and related Switchgear per SOW and specifications.

SEE ATTACHMENTS

Attachments

Show all 14

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Switchgear Replacement Building at DLA Distribution San Joaquin CA DDJC Award Award Notice
Switchgear Replacement Building 30 at DLA Distribution San Joaquin CA DDJC This notice · Latest solicitation Solicitation
Switchgear Replacement Building 30 at DLA Distribution San Joaquin CA DDJC Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity