SPE7M1-16-r-0007
Awarded Award Notice Posted
- Solicitation number
- SPE7M1-16-R-0007
- Agency
- Land and Maritime Defense Logistics Agency, Department of Defense
- Awarded
- to General Dynamics Mission Systems, Inc.
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- SPE7M817C0018 Federal contract award
- NAICS code
- 334519 Other Measuring and Controlling Device Manufacturing
- PSC
- Not on record
Notice details come from SAM.gov. Updated .
Notice text
3 versions
Update #3 · Latest ·
Added: Jan 13, 2016 3:46 pm Modified: Nov 09, 2016 8:52 amTrack Changes
This notice is being amended to re-open solicitation SPE7M1-16-R-0007 on November 25, 2016 with a closing date of December 29, 2016 at 1 PM EST.
The PR quantity has been increased to 300 units. Price breaks will also be requested with ranges from 100 to 400 units.
First Article Testing Applies to all non-waived, non-approved sources.
Specifications, plans, or drawings are not available.
This acquisition is for supplies for which the Government does not possess complete, unrestrictive technical data; therefore, the Government intends to solicit and contract with only approved sources under the authority of 10 U.S.C. 2304(c)(1).
Approved Sources waived for First Article Testing:
GENERAL DYNAMICS OTS (AEROSPACE) (21562) P/N 467-3
GENERAL DYNAMICS MISSION SYSTEMS (3CYA2) P/N 467-3
Conditionally approved source, needs to pass First Article Testing for full approval:
WYVERN TECHNOLOGIES INC (0C8D3) P/N 467-3
NOTE: THIS IS A RESTRICTED SOURCE ITEM AND REQUIRES ENGINEERING SOURCE APPROVAL BY THE GOVERNMENT DESIGN CONTROL ACTIVITY.
NOTE: THIS IS A RESTRICTED SOURCE ITEM MANUFACTURED TO THE OEM DRAWING(S) CITED HEREIN AND AS OF THE DATE OF THIS SOLICITATION ONLY THE SOURCE(S) CITED BELOW HAS/HAVE BEEN PREQUALIFIED TO MANUFACTURE THE ITEM. OFFERS BASED ON SUPPLYING OTHER MANUFACTURER'S PARTS SHALL BEACCOMPANIED BY TECHNICAL AND OTHER DATA SUFFICIENT TO EVALUATE THE ITEM FOR THE INTENDED APPLICATION AS PER DLAI 3200.1, ENCL 6. SAID EVALUATION MAY TAKE AN EXTENDED PERIOD OF TIME AND MAY THEREFORE BE APPLICABLE TO FUTURE PROCUREMENTS. FINAL APPROVAL AUTHORITY RESTS WITH THE GOVERNMENT DESIGN CONTROL ACTIVITY.
Type of Set-Aside: Unrestricted
Update #2 ·
Added: Jan 13, 2016 3:46 pm
Modified: Feb 17, 2016 12:58 pmTrack Changes
***This notice is being amended to extend the closing date for Solicitation:
SPE7M1-16-R-0007 to 3/16/2016***
NSN(s): 6625-013035847
Item Description: MONITOR, VOLTAGE DEVIATION
Manufacturer's Code and Part Number (if applicable):
GENERAL DYNAMICS OTS (AEROSPACE), 21562 P/N 467-3
GENERAL DYNAMICS ADVANCED 3CYA2 P/N 467-3
Drawing Number (if applicable): N/A
Specification Number (if applicable): N/A
Qualification Requirements (e.g. QPL) and where information on qualification requirements may be obtained. (if applicable): N/A
Quantity (including option quantity): 134 EACH
Unit of Issue: EACH
Destination Information: (SW3218) DLA Distribution, San Diego, Ca
Delivery Schedule: 350 DAYS
All responsible sources may submit an offer/quote which shall be considered.
One or more of the items under this acquisition may be subject to an Agreement on Government Procurement approved and implemented in the United States by the Trade Agreements Act of 1979.
All offers shall be in the English language and in U.S. dollars.
All interested suppliers may submit an offer.
Based upon market research, the Government is not using the policies contained in Part 12, Acquisition of Commercial Items, in its solicitation for the described supplies or services. However, interested persons may identify to the contracting officer their interest and capability to satisfy the Government's requirement with a commercial item within 15 days of this notice
The Contracting Officer may utilize on-line Reverse Auctioning as a means of conducting price discussions under this solicitation. During the course of the on-line auction, offerors' proposed prices will be publicly disclosed to other offerors and anyone else having access to the on-line auction. This public disclosure is anonymous, meaning that each offeror's identity will be concealed from other offerors (although it will be known to the Government), and only generic identifiers will be used publicly for each offeror's proposed pricing (e.g., "Offeror A"). By submitting a proposal in response to the solicitation, offerors agree to participate in the Reverse Auction and that their prices may be publicly disclosed, including to other offerors, during the Reverse Auction. An offeror's final auction price will be considered its final proposal revision. No price revisions will be accepted after the close of the Reverse Auction, unless the Contracting Officer decides that further discussions are needed and final proposal revisions are again requested in accordance with FAR 15.307.
( X ) The solicitation will be available in FedBizOpps on its issue date of _1/27/2015____.
( X ) The Small Business size standard is 500 employees. (NAICS: 335921)
( X ) Specifications, plans or drawings are not available.
( X ) Proposed procurement contains Price Breaks for increased quantities:1 - 45 EA, 46 - 90 EA, 91 - 134 EA, and 135 - 162 EA
( X ) This acquisition is for supplies for which the Government does not possess complete, unrestrictive technical data; therefore, the Government intends to solicit and contract with only approved sources under the authority of 10 U.S.C. 2304(c)(1). Approved sources are: _
GENERAL DYNAMICS OTS (AEROSPACE), 21562 P/N 467-3
GENERAL DYNAMICS ADVANCED 3CYA2 P/N 467-3
( X ) While price may be a significant factor in the evaluation of offers, the final award decision will be based upon a combination of price, delivery, past performance and other evaluation factors as described in the solicitation.
10. TYPE OF SET-ASIDE: UNRESTRICTED
MONITOR, VOLTAGE DEVIATION
Configuration Change Management - Engineering Change Proposal, Requests
for Variance (Deviation or Waiver) February 2015
1. Requirements
A. The Configuration Change Management section of SAE EIA-649-1
Configuration Management Requirement for Defense Contracts, Paragraph
3.3, shall be used for Configuration Control of material purchased under
this contract.
B. Furnished item(s) shall conform to the approved configuration
requirements/revision specified, unless a Pre-Production Request for
Variance (deviation) or a Post-Production Request for Variance (waiver),
is processed and approved as provided by Paragraph 3. in this Standard
Text Object (STO). Hereafter, the term #Request for Variance (RFV)#
will also include Requests for Deviations and Waivers.
2. The definitions from EIA-649-1 apply to items being procured under
this solicitation/contract, with the following clarification of
Deviation & Waiver:
A. Pre-Production RFV (previously known as deviation) requests
permission to produce a product that does not conform to contract
requirements/documentation for a limited amount of time and for
specified effectivity. (A deviation differs from an engineering change
in that an approved engineering change requires corresponding revision
of the item's current approved configuration documentation, whereas a
deviation does not.).
B. Post-Production RFV (previously known as waiver) requests
approval of product found during manufacture, or after having been
submitted for Government inspection or acceptance, that departs from
specified requirements, but nevertheless is considered suitable for use
"as is" or after repair by an approved method.
3. Contractor responsibilities.
A. An Engineering Change Proposal (ECP) is used to make permanent
changes in the Government technical data package (TDP). Pending
approval of an ECP, contractual relief should be requested in writing by
the Contractor using a RFV.
B. Refer to FAR Part 48 Value Engineering for cost saving
improvements to the Technical Data Package (TDP).
C. All ECPs submitted by the Contractor will be deemed routine.
If the Contractor considers an ECP as an emergency or urgent; they
shall include in their ECP submittal an explanation and all applicable
supporting documentation. All ECPs will be reviewed for a determination
on criticality, and, if concurred to be an emergency, the appropriate
processing time-frame negotiated with the ESAs will be followed and the
Contractor will be notified of anticipated response time.
D. For ECPs, Specification Change Notices (SCNs) or RFV, the
Contractor must submit the applicable documentation listed in
sub-paragraphs D.(1) through D.(4)to the Administrative Contracting
Officer(ACO), with an information copy to the Procuring Contracting
Officer (PCO). Failure to submit a complete legible package may result
in return of the ECP/RFV without processing.
(1) Documentation listed in Paragraph 3.3.1 (for ECPs), 3.3.2
(RFV), 3.3.3 (for SCNs) or 3.3.4 (for Notices of Revision (NORs)) of the
latest revision of EIA-649-1.
(2) DD Form 1692 (current revision) for ECP.
(3) DD Form 1694 (current revision) for RFV.
(4) DD Form 1695 (current revision) for NOR.
4. DLA#s responsibilities:
A. Upon receipt of the ECP or RFV, the PCO will ensure that the
applicable product specialist receives the copy from DCMA.
B. Within five (5) working days from the date of receipt of the
Contractor's ECP or RFV from DCMA, the PS must submit the requests and
any supporting documentation via a 339 to the appropriate Engineering
Support Activity (ESA), when applicable.
C. Routine ECPs will be processed within 90 days from receipt by
the ESA. RFVs will be evaluated and processed within 30 days from
receipt by the ESA or as negotiated with the ESA.
(1) The contractor will be notified in writing of approval by
the return of an approved copy of the ECP or RFV. Approval will be
reflected by signature of the contracting activity or a review activity
specifically identified in the contract.
(2) The contractor will be notified in writing of disapproval
including reason(s) for disapproval.
5. For an approved RFV or an approved ECP, when the request affects the
Contract, a modification will be issued to the contract incorporating
the applicable requirement changes. Only a Contracting Officer is
authorized to issue a modification incorporating the approved RFV and/or
ECP.
6. Questions regarding the status of previously submitted ECP or RFV
should be directed to the PCO.
7. The submission of an ECP or RFV by the Contractor does not affect
the required delivery date of the contract. If a delivery date change
is needed, it must be negotiated with the Contracting Officer and
documented via modification to the contract.
8. The period of time for evaluation and approval/disapproval of an ECP
and/or a RFV, as specified in Paragraph 4. C., shall not constitute
excusable delay in the performance of this Contract by the Contractor or
in any way relieve the contractor from compliance with the contract
delivery schedule. The submission of an ECP and/or RFV by the
Contractor shall not preclude the Government from exercising its rights
under any clause of the Contract. (End)
Hazard Communication Standard Notice:
Effective June 1, 2015, Federal Standard No. 313-E, Material Safety
Data, Transportation Data and Disposal Data for Hazardous Materials
Furnished to Government Activities, establishes the requirement for
preparation and submission of Safety Data Sheets (SDS) in lieu of
Material Safety Data Sheets (MSDS) by suppliers who provide hazardous
materials to government activities.
The Occupational Safety and Health Administration (OSHA) has modified
its Hazard Communication Standard (HCS) to conform to the United Nations
Globally Harmonized System of Classification and Labeling of Chemicals.
As a result of this change, GSA revised Federal Standard No. 313-E
requiring Safety Data Sheets for classifying chemicals and communicating
the applicable information on labels.
In accordance with the revised standard after June 1, 2015:
1. Suppliers will be required to submit, to the contracting officer for
review and approval prior to award, safety data sheets consistent with
the requirements found at 29 C.F.R. 1910.1200 for hazardous materials
delivered to the Government.
2. Suppliers will also be required to submit, to the contracting officer
for review and approval prior to award, hazardous warning labels in
accordance with 29 C.F.R. 1910.1200 for hazardous materials delivered to
the Government.
3. Finally, suppliers must train their employees on the new safety data
sheets, hazardous warning labels, and requirements of 29 C.F.R.
1910.1200.
For more information on SDS, refer to OSHAs website, available at:
https://www.osha.gov/dsg/hazcom/ghs-final-rule.html.
For information on 29 C.F.R. 1910.1200, refer to the below link:
http://www.gpo.gov/fdsys/pkg/CFR-2009-title29-vol6/pdf/CFR-2009-title29-
vol6-sec1910-1200.pdf.
52.246-11 Higher Level Contract Quality Requirement (Manufacturers)
FAR CLAUSE 52.246-11 APPLIES. A QUALITY MANAGEMENT PROGRAM MEETING THE
REQUIREMENTS OF ISO 9001:2008; A PROGRAM COMPARABLE TO ISO 9001:2008
(EXAMPLE SAE AS 9100), THE FOLLOWING TAILORED VERSION OF ISO 9001:2008;
OR A PROGRAM COMPARABLE TO THE TAILORED VERSION OF ISO 9001:2008
(EXAMPLE SAE AS 9003) IS REQUIRED. MIL-I-45208 AND MIL-Q-9858 ARE
OBSOLETE AND NO LONGER CONSIDERED SUITABLE WHEN HIGHER LEVEL QUALITY IS
REQUIRED. IN THE TAILORED VERSION OF THE ISO 9001:2008, ANY REFERENCES
WHICH CITE THE ENTIRE INTERNATIONAL STANDARD ARE INTERPRETED AS
EXCLUSIONS TO THIS DOCUMENT.
DLA TAILORED HIGHER LEVEL QUALITY CLAUSE FROM ISO 9001:2008
4.1 General requirements, [excluding reference to 1.2 and excluding NOTE
3 c)]
4.2.1 General, [excluding subparagraph a)]
4.2.2 Quality manual, [excluding subparagraph a)]
4.2.3 Control of documents
4.2.4 Control of records
5.1 Management commitment
5.3 Quality policy
6.2.2 Competence, training and awareness
6.4 Work environment
7.1 Planning of product realization, [excluding NOTE 2]
7.2.1 Determination of requirements related to the product
7.2.2 Review of requirements related to the product
7.2.3 Customer communication
7.3.7 Control of design and development changes
7.4.1 Purchasing process
7.4.3 Verification of purchased product
7.5.1 Control of production and service provision
7.5.3 Identification and traceability
7.5.4 Customer property
7.5.5 Preservation of product
7.6 Control of monitoring and measuring equipment
8.1 General, [excluding subparagraph b) and subparagraph c)]
8.2.2 Internal audit
8.2.4 Monitoring and measurement of product
8.3 Control of nonconforming product
8.5.2 Corrective action
8.5.3 Preventive action
NOTE: THIS IS A RESTRICTED SOURCE ITEM AND
REQUIRES ENGINEERING SOURCE APPROVAL BY THE
GOVERNMENT DESIGN CONTROL ACTIVITY.
NOTE: THIS IS A RESTRICTED SOURCE ITEM
MANUFACTURED TO THE OEM DRAWING(S) CITED
HEREIN AND AS OF THE DATE OF THIS SOLICITATION
ONLY THE SOURCE(S) CITED BELOW HAS/HAVE BEEN
PREQUALIFIED TO MANUFACTURE THE ITEM.
OFFERS BASED ON SUPPLYING OTHER MANUFACTURER'S
PARTS SHALL BE ACCOMPANIED BY TECHNICAL AND
OTHER DATA SUFFICIENT TO EVALUATE THE ITEM FOR
THE INTENDED APPLICATION AS PER DLAI 3200.1,
ENCL 6. SAID EVALUATION MAY TAKE AN EXTENDED
PERIOD OF TIME AND MAY THEREFORE BE APPLICABLE
TO FUTURE PROCUREMENTS. FINAL APPROVAL AUTHORITY
REST WITH THE GOVERNMENT DESIGN CONTROL
ACTIVITY.
APPROVED SOURCES:
(3CYA2) P/N 467-3
(21562) P/N 467-3
SPECIFICATION
THIS ITEM HAS TECHNICAL DATA SOME OR ALL OF WHICH IS SUBJECT TO
EXPORT-CONTROL REGULATIONS. DISTRIBUTION OF THE TECHNICAL DATA
AND ELIGIBILITY FOR AWARD ARE LIMITED TO THOSE SUPPLIERS QUALIFIED
THROUGH JCP CERTIFICATION, OR TO THOSE LICENSED BY EITHER THE
DEPARTMENTS OF STATE OR COMMERCE; OR TO FOREIGN SUPPLIERS PURSUANT TO
INTERNATIONAL AGREEMENTS.
TO APPLY FOR JCP CERTIFICATION, COMPLETE DD FORM 2345, MILITARY
CRITICAL TECHNICAL DATA AGREEMENT, FORM IS AVAILABLE AT THE WORLD WIDE
WEB ADDRESS HTTP://WWW.DLIS.DLA.MIL/JCP OR BY WRITING TO:
DLA LOGISTICS INFORMATION SERVICE
FEDERAL CENTER
74 WASHINGTON AVE., NORTH
BATTLE CREEK, MI 49037-3084
TO MANUFACTURE THIS ITEM, NON-JCP CERTIFIED SUPPLIERS MUST SUBMIT A
CURRENT MANUFACTURING LICENSE AGREEMENT, TECHNICAL ASSISTANCE AGREEMENT,
DISTRIBUTION AGREEMENT OR OFF-SHORE PROCUREMENT AGREEMENT APPROVED BY
THE DIRECTORATE OF DEFENSE TRADE CONTROLS WITH THE OFFER, UNLESS AN
EXEMPTION UNDER THE PROVISIONS OF ITAR SECTION, 125.4 EXEMPTIONS OF
GENERAL APPLICABILITY, AND/OR EAR PART 740 ARE APPLICABLE.
NON-JCP CERTIFIED SUPPLIERS SEEKING EXPORT CONTROLLED TECHNICAL
DATA ARE REQUIRED TO PROVIDE THE CONTRACTING OFFICER WITH AN
APPLICABLE AGREEMENT OR IDENTIFY WHICH ITAR/EAR EXEMPTION APPLIES TO
RECEIVE A COPY OF THE EXPORT CONTROLLED TECHNICAL DATA.
NOTE: JCP CERTIFIED CONTRACTORS WHO RECEIVE TECHNICAL DATA PURSUANT TO
THEIR DD FORM 2345 CERTIFICATION MAY NOT FURTHER DISSEMINATE SUCH DATA
UNLESS FURTHER DISSEMINATION OF THE TECHNICAL DATA IS EXPRESSLY
PERMITTED BY DODD 5230.25.
This item requires Item Unique Identification (IUID) in accordance with
the enclosed/referenced IUID technical requirements and MIL-STD-130.
DFARS 252.211-7003 clause applies.
1. VOLTAGE MONITOR
2. NSN 6625013035847
3. P/N 467-3,
4. THE FOLLOWING SPECIFICATIONS/STANDARDS, ETC., WILL BE USED IN LIEU OF
THE DATA INDICATED. THE SUPERSEDED DATA WILL NOT BE FURNISHED UNLESS SO
INDICATED.
5. THE SOURCES/MATERIALS IF LISTED ON THE SPECIFICATION, STANDARDS AND
DRAWINGS ARE THE ONLY SOURCES/MATERIALS FOR THOSE ITEMS. ANY
SUBSTITUTIONS SHALL HAVE PRIOR APPROVAL BY THE COGNIZANT OO-ALC
ENGINEERING ACTIVITY.
6. IUID (ITEM UNIQUE IDENTIFIER) REQUIREMENTS AND EXPECTATIONS WHICH THE
CONTRACTOR MUST ENSURE ARE COMPLIED WITH.
7. CONTRACTORS DRAWINGS SHALL BE CHANGED OR SUPPLEMENTED BY CONTRACTOR
FOR IUID COMPLIANCE.
A. LABEL SHALL CONTAIN ALL DATA ON EXISTING LABEL, (IF EXISTING LABEL IS
TO BE REPLACED), ONLY DELETE EXISTING LABEL WITH GOVERNMENT ENGINEERING
PERMISSION.
B. USE HRI (HUMAN READABLE) AND MACHINE READABLE MATRIX. (USAF NOT
EQUIPED TO READ BARCODE).
C. IUID MATRIX NEEDS TO BE HIGHLY VISIBLE, IN A LOCATION EASILY
ACCESSIBLE.
D. IUID MARKING MUST BE PERMANENT.
E. MIL-STD-130, ANSI/AIM BCII, ISO 15434, ISO 15415, AND ISO 15418
F. IUID MARKING SPECIFICATIONS.
1. MINIMUM 1/8 INCH LETTERING ON HUMAN READABLE TO INCLUDE:
A. CAGE (17V)
B. P/N (1P)
C. SERIAL NUMBER (IS)
2. MINIMUM 1/4 INCH SQUARE ON MACHINE READABLE 2D MATRIX -CONSTRUCT 2 -
TO INCLUDE
A. CAGE (17V)
B. P/N (1P)
C. SERIAL NUMBER (IS)
8. EFFECTIVE 9 MAY 2005 THE DEPARTMENT OF THE AIR FORCE ISSUED AN AIR
WORTHINESS ADVISORY (M-05-01)
REGARDING THE USE OF LEAD-FREE SOLDER IN ELECTRICAL AND ELECTRONIC
MILITARY PRODUCTS. TO DATE, NO LEAD-FREE SOLDER FORMULATION HAS MATCHED
THE RELIABILITY AND PERFORMANCE QUALITIES OF THE STANDARD LEADED
SOLDERS. THEREFORE, UNTIL SUCH TIME AS A SUITABLE, RELIABLE LEAD-FREE
SOLDER REPLACEMENT IS IDENTIFIED, ALL ELECTRONIC EQUIPMENT SUPPLIERS
SHALL CONTINUE TO PROVIDE THE DEPARTMENT OF THE AIR FORCE WITH ITEMS
WHICH MEET ALL PERFORMANCE, COMPATIBILITY, AND RELIABILITY STANDARDS
PREVIOUSLY ESTABLISHED WITH LEADED SOLDERS. FAILURE TO DO SO, COULD
ADVERSELY IMPACT THE PERFORMANCE AND RELIABILITY OF WEAPON SYSTEMS
AFFECTING NATIONAL SECURITY.
9. THE USE OF LEAD-FREE SOLDER OR LEAD-FREE PLATED COMPONENTS IN
MILITARY ELECTRONIC PRODUCTS IS CONSIDERED A FLIGHT SAFETY AND NATIONAL
SECURITY CONCERN. FOR THIS REASON THE US AIR FORCE WANTS TO BE NOTIFIED
WHEN LEAD-FREE COMPONENTS AND MANUFACTURING PROCESSES HAVE BEEN
IMPLEMENTED. AS PART OF SATISFACTORY COMPLIANCE WITH THE REQUIREMENTS OF
THIS CONTRACT THE US AIR FORCE REQUIRES NOTIFICATION ON A NO-COST BASIS
WHEN ANY OF THE FOLLOWING CONDITIONS EXIST:
1. COMMERCIAL OFF-THE-SHELF (COTS) OR ANY OTHER ELECTRICAL COMPONENTS
THAT CONTAIN LEAD-FREE SOLDER OR LEAD-FREE PLATED COMPONENTS ARE USED IN
THE END-ITEM.
2. ANY LEAD-FREE COMPONENT OR PART USED TO MANUFACTURE THE END ITEM THAT
IS NOT IDENTIFIED WITH A SEPARATE PART NUMBER OR DESIGNATION.
10. IF NO LEAD-FREE, LEAD-FREE PLATED COTS OR ANY OTHER LEAD-FREE
ELECTRICAL OR ELECTRONICS COMPONENTS EXIST IN THE MANUFACTURED END-ITEM,
THE CONTRACTOR SHALL PROVIDE WRITTEN CERTIFICATION OF COMPLIANCE AS A
DELIVERABLE WITH THE CONTRACT.
1. USE INDUSTRY STANDARD IPC-1066, "MARKING, SYMBOLS AND LABELS FOR
IDENTIFICATION OF LEAD-FREE AND OTHER REPORTABLE MATERIALS IN LEAD-FREE
ASSEMBLIES, COMPONENTS AND DEVICES,"
2. INCLUDE THE PROGRAM ENGINEER'S EVALUATION OF THE PURCHASING/REPAIR
ITEM FOR ANY "LEAD-FREE" MILITARY PART(S) IN REFERENCE TO IT
S'RELIABILITY, PERFORMANCE AND COMPATIBILITY FOR THE SYSTEM.
11. POC FOR THIS MATTER IS THE ENGINEERING SUPPORT ACTIVITY (ESA).
12. PAGE 7, PARAGRAPH 3.2.3.2 OF 16PR145, REVISION "G" DOES NOT APPLY.
13. THIS IS AN AIRCRAFT PART. USE THE APPROPRIATE PORTION OF
MIL-STD-2000 THAT APPLIES AIRCRAFT SOLDERING FOR ALL SOLDERING
REQUIREMENTS.*NOTE: J-STD-001 MAYBE USED IN LIEU OF MIL-STD-
2000, IF SPEC MEETS OR EXCEEDS MIL-STD-2000
14. DEVIATIONS FROM SPECIFICATIONS IDENTIFIED IN CONTROL DRAWINGS ARE
NOT AUTHORIZED WITHOUT
PRIOR APPROVAL BY OO-ALC ENGINEERING.
15. THE SOURCE FOR ANTI-SABOTAGE LACQUER (MATERIAL 114-136305) IF
REQUIRED IS AVAILABLE FROM:
ORANGE PRODUCTS COMPANY
CAGE 01195
PH: 214-438-7321
UNDER THE NAME "TORQUE SEAL (F-900), COLOR RED.
16. AN ADDITIONAL SOURCE FOR SOME OF THE SUB COMPONENTS IS:
EXCEL INTERNATIONAL
PH: 805-446-1740
HTTP://WWW.SILCOM.COM/EXCEL
THE USE OF ANY CLASS I OZONE-DEPLETING SUBSTANCE
(ODS) IN THE DESIGN, MANUFACTURING, TESTING,
CLEANING, OR ANY OTHER PROCESS FOR THIS ITEM
UNDER ANY MILITARY OR FEDERAL SPECIFICATION,
STANDARD OR DRAWING REFERENCED IN THIS ITEM
DESCRIPTION IS "PROHIBITED" UNLESS THE SEPARATE
WRITTEN APPROVAL OF THE CONTRACTING OFFICER IS
OBTAINED. THIS PROHIBITION SUPERSEDES ALL
SPECIFICATION REQUIREMENTS BUT DOES NOT
ALLEVIATE ANY PRODUCT PERFORMANCE REQUIREMENTS.
THIS DOES NOT APPLY TO COMMERCIAL ITEMS, AS
DEFINED IN "FAR 11.001" OR TO PART-NUMBERED-
ONLY ITEMS.
CRITICAL APPLICATION ITEM
GENERAL DYNAMICS OTS (AEROSPACE), 21562 P/N 467-3
GENERAL DYNAMICS ADVANCED 3CYA2 P/N 467-3
Update #1 ·
Added: Jan 13, 2016 3:46 pm
NSN(s): 6625-013035847
Item Description: MONITOR, VOLTAGE DEVIATION
Manufacturer's Code and Part Number (if applicable):
GENERAL DYNAMICS OTS (AEROSPACE), 21562 P/N 467-3
GENERAL DYNAMICS ADVANCED 3CYA2 P/N 467-3
Drawing Number (if applicable): N/A
Specification Number (if applicable): N/A
Qualification Requirements (e.g. QPL) and where information on qualification requirements may be obtained. (if applicable): N/A
Quantity (including option quantity): 134 EACH
Unit of Issue: EACH
Destination Information: (SW3218) DLA Distribution, San Diego, Ca
Delivery Schedule: 350 DAYS
All responsible sources may submit an offer/quote which shall be considered.
One or more of the items under this acquisition may be subject to an Agreement on Government Procurement approved and implemented in the United States by the Trade Agreements Act of 1979.
All offers shall be in the English language and in U.S. dollars.
All interested suppliers may submit an offer.
Based upon market research, the Government is not using the policies contained in Part 12, Acquisition of Commercial Items, in its solicitation for the described supplies or services. However, interested persons may identify to the contracting officer their interest and capability to satisfy the Government's requirement with a commercial item within 15 days of this notice
The Contracting Officer may utilize on-line Reverse Auctioning as a means of conducting price discussions under this solicitation. During the course of the on-line auction, offerors' proposed prices will be publicly disclosed to other offerors and anyone else having access to the on-line auction. This public disclosure is anonymous, meaning that each offeror's identity will be concealed from other offerors (although it will be known to the Government), and only generic identifiers will be used publicly for each offeror's proposed pricing (e.g., "Offeror A"). By submitting a proposal in response to the solicitation, offerors agree to participate in the Reverse Auction and that their prices may be publicly disclosed, including to other offerors, during the Reverse Auction. An offeror's final auction price will be considered its final proposal revision. No price revisions will be accepted after the close of the Reverse Auction, unless the Contracting Officer decides that further discussions are needed and final proposal revisions are again requested in accordance with FAR 15.307.
( X ) The solicitation will be available in FedBizOpps on its issue date of _1/27/2015____.
( X ) The Small Business size standard is 500 employees. (NAICS: 335921)
( X ) Specifications, plans or drawings are not available.
( X ) Proposed procurement contains Price Breaks for increased quantities:1 - 45 EA, 46 - 90 EA, 91 - 134 EA, and 135 - 162 EA
( X ) This acquisition is for supplies for which the Government does not possess complete, unrestrictive technical data; therefore, the Government intends to solicit and contract with only approved sources under the authority of 10 U.S.C. 2304(c)(1). Approved sources are: _
GENERAL DYNAMICS OTS (AEROSPACE), 21562 P/N 467-3
GENERAL DYNAMICS ADVANCED 3CYA2 P/N 467-3
( X ) While price may be a significant factor in the evaluation of offers, the final award decision will be based upon a combination of price, delivery, past performance and other evaluation factors as described in the solicitation.
10. TYPE OF SET-ASIDE: UNRESTRICTED
MONITOR, VOLTAGE DEVIATION
Configuration Change Management - Engineering Change Proposal, Requests
for Variance (Deviation or Waiver) February 2015
1. Requirements
A. The Configuration Change Management section of SAE EIA-649-1
Configuration Management Requirement for Defense Contracts, Paragraph
3.3, shall be used for Configuration Control of material purchased under
this contract.
B. Furnished item(s) shall conform to the approved configuration
requirements/revision specified, unless a Pre-Production Request for
Variance (deviation) or a Post-Production Request for Variance (waiver),
is processed and approved as provided by Paragraph 3. in this Standard
Text Object (STO). Hereafter, the term #Request for Variance (RFV)#
will also include Requests for Deviations and Waivers.
2. The definitions from EIA-649-1 apply to items being procured under
this solicitation/contract, with the following clarification of
Deviation & Waiver:
A. Pre-Production RFV (previously known as deviation) requests
permission to produce a product that does not conform to contract
requirements/documentation for a limited amount of time and for
specified effectivity. (A deviation differs from an engineering change
in that an approved engineering change requires corresponding revision
of the item's current approved configuration documentation, whereas a
deviation does not.).
B. Post-Production RFV (previously known as waiver) requests
approval of product found during manufacture, or after having been
submitted for Government inspection or acceptance, that departs from
specified requirements, but nevertheless is considered suitable for use
"as is" or after repair by an approved method.
3. Contractor responsibilities.
A. An Engineering Change Proposal (ECP) is used to make permanent
changes in the Government technical data package (TDP). Pending
approval of an ECP, contractual relief should be requested in writing by
the Contractor using a RFV.
B. Refer to FAR Part 48 Value Engineering for cost saving
improvements to the Technical Data Package (TDP).
C. All ECPs submitted by the Contractor will be deemed routine.
If the Contractor considers an ECP as an emergency or urgent; they
shall include in their ECP submittal an explanation and all applicable
supporting documentation. All ECPs will be reviewed for a determination
on criticality, and, if concurred to be an emergency, the appropriate
processing time-frame negotiated with the ESAs will be followed and the
Contractor will be notified of anticipated response time.
D. For ECPs, Specification Change Notices (SCNs) or RFV, the
Contractor must submit the applicable documentation listed in
sub-paragraphs D.(1) through D.(4)to the Administrative Contracting
Officer(ACO), with an information copy to the Procuring Contracting
Officer (PCO). Failure to submit a complete legible package may result
in return of the ECP/RFV without processing.
(1) Documentation listed in Paragraph 3.3.1 (for ECPs), 3.3.2
(RFV), 3.3.3 (for SCNs) or 3.3.4 (for Notices of Revision (NORs)) of the
latest revision of EIA-649-1.
(2) DD Form 1692 (current revision) for ECP.
(3) DD Form 1694 (current revision) for RFV.
(4) DD Form 1695 (current revision) for NOR.
4. DLA#s responsibilities:
A. Upon receipt of the ECP or RFV, the PCO will ensure that the
applicable product specialist receives the copy from DCMA.
B. Within five (5) working days from the date of receipt of the
Contractor's ECP or RFV from DCMA, the PS must submit the requests and
any supporting documentation via a 339 to the appropriate Engineering
Support Activity (ESA), when applicable.
C. Routine ECPs will be processed within 90 days from receipt by
the ESA. RFVs will be evaluated and processed within 30 days from
receipt by the ESA or as negotiated with the ESA.
(1) The contractor will be notified in writing of approval by
the return of an approved copy of the ECP or RFV. Approval will be
reflected by signature of the contracting activity or a review activity
specifically identified in the contract.
(2) The contractor will be notified in writing of disapproval
including reason(s) for disapproval.
5. For an approved RFV or an approved ECP, when the request affects the
Contract, a modification will be issued to the contract incorporating
the applicable requirement changes. Only a Contracting Officer is
authorized to issue a modification incorporating the approved RFV and/or
ECP.
6. Questions regarding the status of previously submitted ECP or RFV
should be directed to the PCO.
7. The submission of an ECP or RFV by the Contractor does not affect
the required delivery date of the contract. If a delivery date change
is needed, it must be negotiated with the Contracting Officer and
documented via modification to the contract.
8. The period of time for evaluation and approval/disapproval of an ECP
and/or a RFV, as specified in Paragraph 4. C., shall not constitute
excusable delay in the performance of this Contract by the Contractor or
in any way relieve the contractor from compliance with the contract
delivery schedule. The submission of an ECP and/or RFV by the
Contractor shall not preclude the Government from exercising its rights
under any clause of the Contract. (End)
Hazard Communication Standard Notice:
Effective June 1, 2015, Federal Standard No. 313-E, Material Safety
Data, Transportation Data and Disposal Data for Hazardous Materials
Furnished to Government Activities, establishes the requirement for
preparation and submission of Safety Data Sheets (SDS) in lieu of
Material Safety Data Sheets (MSDS) by suppliers who provide hazardous
materials to government activities.
The Occupational Safety and Health Administration (OSHA) has modified
its Hazard Communication Standard (HCS) to conform to the United Nations
Globally Harmonized System of Classification and Labeling of Chemicals.
As a result of this change, GSA revised Federal Standard No. 313-E
requiring Safety Data Sheets for classifying chemicals and communicating
the applicable information on labels.
In accordance with the revised standard after June 1, 2015:
1. Suppliers will be required to submit, to the contracting officer for
review and approval prior to award, safety data sheets consistent with
the requirements found at 29 C.F.R. 1910.1200 for hazardous materials
delivered to the Government.
2. Suppliers will also be required to submit, to the contracting officer
for review and approval prior to award, hazardous warning labels in
accordance with 29 C.F.R. 1910.1200 for hazardous materials delivered to
the Government.
3. Finally, suppliers must train their employees on the new safety data
sheets, hazardous warning labels, and requirements of 29 C.F.R.
1910.1200.
For more information on SDS, refer to OSHAs website, available at:
https://www.osha.gov/dsg/hazcom/ghs-final-rule.html.
For information on 29 C.F.R. 1910.1200, refer to the below link:
http://www.gpo.gov/fdsys/pkg/CFR-2009-title29-vol6/pdf/CFR-2009-title29-
vol6-sec1910-1200.pdf.
52.246-11 Higher Level Contract Quality Requirement (Manufacturers)
FAR CLAUSE 52.246-11 APPLIES. A QUALITY MANAGEMENT PROGRAM MEETING THE
REQUIREMENTS OF ISO 9001:2008; A PROGRAM COMPARABLE TO ISO 9001:2008
(EXAMPLE SAE AS 9100), THE FOLLOWING TAILORED VERSION OF ISO 9001:2008;
OR A PROGRAM COMPARABLE TO THE TAILORED VERSION OF ISO 9001:2008
(EXAMPLE SAE AS 9003) IS REQUIRED. MIL-I-45208 AND MIL-Q-9858 ARE
OBSOLETE AND NO LONGER CONSIDERED SUITABLE WHEN HIGHER LEVEL QUALITY IS
REQUIRED. IN THE TAILORED VERSION OF THE ISO 9001:2008, ANY REFERENCES
WHICH CITE THE ENTIRE INTERNATIONAL STANDARD ARE INTERPRETED AS
EXCLUSIONS TO THIS DOCUMENT.
DLA TAILORED HIGHER LEVEL QUALITY CLAUSE FROM ISO 9001:2008
4.1 General requirements, [excluding reference to 1.2 and excluding NOTE
3 c)]
4.2.1 General, [excluding subparagraph a)]
4.2.2 Quality manual, [excluding subparagraph a)]
4.2.3 Control of documents
4.2.4 Control of records
5.1 Management commitment
5.3 Quality policy
6.2.2 Competence, training and awareness
6.4 Work environment
7.1 Planning of product realization, [excluding NOTE 2]
7.2.1 Determination of requirements related to the product
7.2.2 Review of requirements related to the product
7.2.3 Customer communication
7.3.7 Control of design and development changes
7.4.1 Purchasing process
7.4.3 Verification of purchased product
7.5.1 Control of production and service provision
7.5.3 Identification and traceability
7.5.4 Customer property
7.5.5 Preservation of product
7.6 Control of monitoring and measuring equipment
8.1 General, [excluding subparagraph b) and subparagraph c)]
8.2.2 Internal audit
8.2.4 Monitoring and measurement of product
8.3 Control of nonconforming product
8.5.2 Corrective action
8.5.3 Preventive action
NOTE: THIS IS A RESTRICTED SOURCE ITEM AND
REQUIRES ENGINEERING SOURCE APPROVAL BY THE
GOVERNMENT DESIGN CONTROL ACTIVITY.
NOTE: THIS IS A RESTRICTED SOURCE ITEM
MANUFACTURED TO THE OEM DRAWING(S) CITED
HEREIN AND AS OF THE DATE OF THIS SOLICITATION
ONLY THE SOURCE(S) CITED BELOW HAS/HAVE BEEN
PREQUALIFIED TO MANUFACTURE THE ITEM.
OFFERS BASED ON SUPPLYING OTHER MANUFACTURER'S
PARTS SHALL BE ACCOMPANIED BY TECHNICAL AND
OTHER DATA SUFFICIENT TO EVALUATE THE ITEM FOR
THE INTENDED APPLICATION AS PER DLAI 3200.1,
ENCL 6. SAID EVALUATION MAY TAKE AN EXTENDED
PERIOD OF TIME AND MAY THEREFORE BE APPLICABLE
TO FUTURE PROCUREMENTS. FINAL APPROVAL AUTHORITY
REST WITH THE GOVERNMENT DESIGN CONTROL
ACTIVITY.
APPROVED SOURCES:
(3CYA2) P/N 467-3
(21562) P/N 467-3
SPECIFICATION
THIS ITEM HAS TECHNICAL DATA SOME OR ALL OF WHICH IS SUBJECT TO
EXPORT-CONTROL REGULATIONS. DISTRIBUTION OF THE TECHNICAL DATA
AND ELIGIBILITY FOR AWARD ARE LIMITED TO THOSE SUPPLIERS QUALIFIED
THROUGH JCP CERTIFICATION, OR TO THOSE LICENSED BY EITHER THE
DEPARTMENTS OF STATE OR COMMERCE; OR TO FOREIGN SUPPLIERS PURSUANT TO
INTERNATIONAL AGREEMENTS.
TO APPLY FOR JCP CERTIFICATION, COMPLETE DD FORM 2345, MILITARY
CRITICAL TECHNICAL DATA AGREEMENT, FORM IS AVAILABLE AT THE WORLD WIDE
WEB ADDRESS HTTP://WWW.DLIS.DLA.MIL/JCP OR BY WRITING TO:
DLA LOGISTICS INFORMATION SERVICE
FEDERAL CENTER
74 WASHINGTON AVE., NORTH
BATTLE CREEK, MI 49037-3084
TO MANUFACTURE THIS ITEM, NON-JCP CERTIFIED SUPPLIERS MUST SUBMIT A
CURRENT MANUFACTURING LICENSE AGREEMENT, TECHNICAL ASSISTANCE AGREEMENT,
DISTRIBUTION AGREEMENT OR OFF-SHORE PROCUREMENT AGREEMENT APPROVED BY
THE DIRECTORATE OF DEFENSE TRADE CONTROLS WITH THE OFFER, UNLESS AN
EXEMPTION UNDER THE PROVISIONS OF ITAR SECTION, 125.4 EXEMPTIONS OF
GENERAL APPLICABILITY, AND/OR EAR PART 740 ARE APPLICABLE.
NON-JCP CERTIFIED SUPPLIERS SEEKING EXPORT CONTROLLED TECHNICAL
DATA ARE REQUIRED TO PROVIDE THE CONTRACTING OFFICER WITH AN
APPLICABLE AGREEMENT OR IDENTIFY WHICH ITAR/EAR EXEMPTION APPLIES TO
RECEIVE A COPY OF THE EXPORT CONTROLLED TECHNICAL DATA.
NOTE: JCP CERTIFIED CONTRACTORS WHO RECEIVE TECHNICAL DATA PURSUANT TO
THEIR DD FORM 2345 CERTIFICATION MAY NOT FURTHER DISSEMINATE SUCH DATA
UNLESS FURTHER DISSEMINATION OF THE TECHNICAL DATA IS EXPRESSLY
PERMITTED BY DODD 5230.25.
This item requires Item Unique Identification (IUID) in accordance with
the enclosed/referenced IUID technical requirements and MIL-STD-130.
DFARS 252.211-7003 clause applies.
1. VOLTAGE MONITOR
2. NSN 6625013035847
3. P/N 467-3,
4. THE FOLLOWING SPECIFICATIONS/STANDARDS, ETC., WILL BE USED IN LIEU OF
THE DATA INDICATED. THE SUPERSEDED DATA WILL NOT BE FURNISHED UNLESS SO
INDICATED.
5. THE SOURCES/MATERIALS IF LISTED ON THE SPECIFICATION, STANDARDS AND
DRAWINGS ARE THE ONLY SOURCES/MATERIALS FOR THOSE ITEMS. ANY
SUBSTITUTIONS SHALL HAVE PRIOR APPROVAL BY THE COGNIZANT OO-ALC
ENGINEERING ACTIVITY.
6. IUID (ITEM UNIQUE IDENTIFIER) REQUIREMENTS AND EXPECTATIONS WHICH THE
CONTRACTOR MUST ENSURE ARE COMPLIED WITH.
7. CONTRACTORS DRAWINGS SHALL BE CHANGED OR SUPPLEMENTED BY CONTRACTOR
FOR IUID COMPLIANCE.
A. LABEL SHALL CONTAIN ALL DATA ON EXISTING LABEL, (IF EXISTING LABEL IS
TO BE REPLACED), ONLY DELETE EXISTING LABEL WITH GOVERNMENT ENGINEERING
PERMISSION.
B. USE HRI (HUMAN READABLE) AND MACHINE READABLE MATRIX. (USAF NOT
EQUIPED TO READ BARCODE).
C. IUID MATRIX NEEDS TO BE HIGHLY VISIBLE, IN A LOCATION EASILY
ACCESSIBLE.
D. IUID MARKING MUST BE PERMANENT.
E. MIL-STD-130, ANSI/AIM BCII, ISO 15434, ISO 15415, AND ISO 15418
F. IUID MARKING SPECIFICATIONS.
1. MINIMUM 1/8 INCH LETTERING ON HUMAN READABLE TO INCLUDE:
A. CAGE (17V)
B. P/N (1P)
C. SERIAL NUMBER (IS)
2. MINIMUM 1/4 INCH SQUARE ON MACHINE READABLE 2D MATRIX -CONSTRUCT 2 -
TO INCLUDE
A. CAGE (17V)
B. P/N (1P)
C. SERIAL NUMBER (IS)
8. EFFECTIVE 9 MAY 2005 THE DEPARTMENT OF THE AIR FORCE ISSUED AN AIR
WORTHINESS ADVISORY (M-05-01)
REGARDING THE USE OF LEAD-FREE SOLDER IN ELECTRICAL AND ELECTRONIC
MILITARY PRODUCTS. TO DATE, NO LEAD-FREE SOLDER FORMULATION HAS MATCHED
THE RELIABILITY AND PERFORMANCE QUALITIES OF THE STANDARD LEADED
SOLDERS. THEREFORE, UNTIL SUCH TIME AS A SUITABLE, RELIABLE LEAD-FREE
SOLDER REPLACEMENT IS IDENTIFIED, ALL ELECTRONIC EQUIPMENT SUPPLIERS
SHALL CONTINUE TO PROVIDE THE DEPARTMENT OF THE AIR FORCE WITH ITEMS
WHICH MEET ALL PERFORMANCE, COMPATIBILITY, AND RELIABILITY STANDARDS
PREVIOUSLY ESTABLISHED WITH LEADED SOLDERS. FAILURE TO DO SO, COULD
ADVERSELY IMPACT THE PERFORMANCE AND RELIABILITY OF WEAPON SYSTEMS
AFFECTING NATIONAL SECURITY.
9. THE USE OF LEAD-FREE SOLDER OR LEAD-FREE PLATED COMPONENTS IN
MILITARY ELECTRONIC PRODUCTS IS CONSIDERED A FLIGHT SAFETY AND NATIONAL
SECURITY CONCERN. FOR THIS REASON THE US AIR FORCE WANTS TO BE NOTIFIED
WHEN LEAD-FREE COMPONENTS AND MANUFACTURING PROCESSES HAVE BEEN
IMPLEMENTED. AS PART OF SATISFACTORY COMPLIANCE WITH THE REQUIREMENTS OF
THIS CONTRACT THE US AIR FORCE REQUIRES NOTIFICATION ON A NO-COST BASIS
WHEN ANY OF THE FOLLOWING CONDITIONS EXIST:
1. COMMERCIAL OFF-THE-SHELF (COTS) OR ANY OTHER ELECTRICAL COMPONENTS
THAT CONTAIN LEAD-FREE SOLDER OR LEAD-FREE PLATED COMPONENTS ARE USED IN
THE END-ITEM.
2. ANY LEAD-FREE COMPONENT OR PART USED TO MANUFACTURE THE END ITEM THAT
IS NOT IDENTIFIED WITH A SEPARATE PART NUMBER OR DESIGNATION.
10. IF NO LEAD-FREE, LEAD-FREE PLATED COTS OR ANY OTHER LEAD-FREE
ELECTRICAL OR ELECTRONICS COMPONENTS EXIST IN THE MANUFACTURED END-ITEM,
THE CONTRACTOR SHALL PROVIDE WRITTEN CERTIFICATION OF COMPLIANCE AS A
DELIVERABLE WITH THE CONTRACT.
1. USE INDUSTRY STANDARD IPC-1066, "MARKING, SYMBOLS AND LABELS FOR
IDENTIFICATION OF LEAD-FREE AND OTHER REPORTABLE MATERIALS IN LEAD-FREE
ASSEMBLIES, COMPONENTS AND DEVICES,"
2. INCLUDE THE PROGRAM ENGINEER'S EVALUATION OF THE PURCHASING/REPAIR
ITEM FOR ANY "LEAD-FREE" MILITARY PART(S) IN REFERENCE TO IT
S'RELIABILITY, PERFORMANCE AND COMPATIBILITY FOR THE SYSTEM.
11. POC FOR THIS MATTER IS THE ENGINEERING SUPPORT ACTIVITY (ESA).
12. PAGE 7, PARAGRAPH 3.2.3.2 OF 16PR145, REVISION "G" DOES NOT APPLY.
13. THIS IS AN AIRCRAFT PART. USE THE APPROPRIATE PORTION OF
MIL-STD-2000 THAT APPLIES AIRCRAFT SOLDERING FOR ALL SOLDERING
REQUIREMENTS.*NOTE: J-STD-001 MAYBE USED IN LIEU OF MIL-STD-
2000, IF SPEC MEETS OR EXCEEDS MIL-STD-2000
14. DEVIATIONS FROM SPECIFICATIONS IDENTIFIED IN CONTROL DRAWINGS ARE
NOT AUTHORIZED WITHOUT
PRIOR APPROVAL BY OO-ALC ENGINEERING.
15. THE SOURCE FOR ANTI-SABOTAGE LACQUER (MATERIAL 114-136305) IF
REQUIRED IS AVAILABLE FROM:
ORANGE PRODUCTS COMPANY
CAGE 01195
PH: 214-438-7321
UNDER THE NAME "TORQUE SEAL (F-900), COLOR RED.
16. AN ADDITIONAL SOURCE FOR SOME OF THE SUB COMPONENTS IS:
EXCEL INTERNATIONAL
PH: 805-446-1740
HTTP://WWW.SILCOM.COM/EXCEL
THE USE OF ANY CLASS I OZONE-DEPLETING SUBSTANCE
(ODS) IN THE DESIGN, MANUFACTURING, TESTING,
CLEANING, OR ANY OTHER PROCESS FOR THIS ITEM
UNDER ANY MILITARY OR FEDERAL SPECIFICATION,
STANDARD OR DRAWING REFERENCED IN THIS ITEM
DESCRIPTION IS "PROHIBITED" UNLESS THE SEPARATE
WRITTEN APPROVAL OF THE CONTRACTING OFFICER IS
OBTAINED. THIS PROHIBITION SUPERSEDES ALL
SPECIFICATION REQUIREMENTS BUT DOES NOT
ALLEVIATE ANY PRODUCT PERFORMANCE REQUIREMENTS.
THIS DOES NOT APPLY TO COMMERCIAL ITEMS, AS
DEFINED IN "FAR 11.001" OR TO PART-NUMBERED-
ONLY ITEMS.
CRITICAL APPLICATION ITEM
GENERAL DYNAMICS OTS (AEROSPACE), 21562 P/N 467-3
GENERAL DYNAMICS ADVANCED 3CYA2 P/N 467-3
Attachments
| File | Type | Posted |
|---|---|---|
| SPE7M116R0007_-_JA_reviewed_Redacted.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| SPE7M1-16-r-0007 | Award Notice | |
| SPE7M1-16-r-0007 | Award Notice |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity