Sandy Lake Dam Rehab Project
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W912ES20R0008
- Agency
- ENDIST St Paul US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Z2KA Repair Or Alteration Of Dams
- Place of performance
- Libby MN 55760 USA
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Army Corps of Engineers Engineering District St Paul is seeking proposals to rehabilitate the Sandy Lake Dam structure located in Libby, MN. The solicitation seeks repair of deteriorated concrete, replacement of stoplogs in the lock bay and slide gates in six sluice bays, installation of a new stoplog dewatering system and dual-leaf slide gate in the log sluice bay. Proposers must also remove the upstream timber apron and install a new upstream concrete apron and sheet pile cutoff. Three-phase electrical power and new gate controls will be provided to the dam and located in an enclosed area of an existing on-site pumphouse. The evaluation criteria are not specified and the deadline for proposals is August 27, 2020.
This total small business set-aside opportunity has a place of performance in Libby, MN. Rehabilitation tasks include repairing the dam structure over an unspecified timeline. Solicitation number W912ES20R0008 was issued by the Department of the Army Corps of Engineers Engineering District St Paul for an estimated budget that is undisclosed. NAICS code 237990 and PSC code C211 apply. No incumbent or current contractors were named.
Notice text
Sandy Lake Dam Rehabilitation Project
This project consists of the rehabilitation of the dam structure at Sandy Lake Dam. Rehabilitation tasks include repair of deteriorated concrete, removal and replacement of stoplogs in the lock bay, installation of new slide gates and a stoplog dewatering system in six sluice bays, installation of a dual-leaf slide gate in the log sluice bay, removal of the upstream timber apron, installation of a new upstream concrete apron, installation of a new sheet pile cutoff, and installation of three-phase electrical power to the dam, including new gate controls. A new power panel and operator controls will be located in an existing pumphouse building - a portion of which w ill need to be enclosed with this project to provide a suitable sheltered environment.
Attachments
| File | Type | Posted |
|---|---|---|
| Amendment 2 Sandy Lake.pdf | ||
| Attachment 2 Sandy Lake Dam .pdf | ||
| Attachment 1 Sandy Lake Dam .pdf | ||
| Amendment 1.pdf | ||
| W912ES20R0008_SPECS .pdf | ||
| W912ES20R0008_PLANS.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Sandy Lake Dam Rehab Project | Award Notice | |
| Sandy Lake Dam Rehab Project | Solicitation | |
| Sandy Lake Dam Rehab Project | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity