Sandy Lake Dam Rehab Project
Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- W912ES20B0018
- Agency
- ENDIST St Paul US Army Corps of Engineers, Department of Defense
- Responses due
- Not on record
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Z2KA Repair Or Alteration Of Dams
- Place of performance
- Libby MN 55760 USA
Notice details come from SAM.gov. Updated .
About this opportunity
This pre-solicitation notice is for the rehabilitation of Sandy Lake Dam. The U.S. Army Corps of Engineers, St. Paul District, will procure services to repair deteriorated concrete, remove and replace stoplogs and gates, install new slide gates and a stoplog dewatering system in sluice bays, remove the upstream timber apron and install a new concrete and sheet pile cutoff. A new electrical power system including controls will also be installed in the existing pump house. Proposals will be evaluated based on technical qualifications, past performance, and price. Questions regarding this opportunity are due by July 15th with responses and any modifications to requirements provided by August 1st.
This procurement is set aside for total small business concerns. It is designated under NAICS 237310 for highway, street, and bridge construction and PSC C211 for construction of dams and reservoirs. No incumbent or current contractor is identified. The period of performance and budget are not specified but the scope of work suggests this will be a sizable contract given the extent of the dam rehabilitation required.
Notice text
The work in this procurement includes rehabilitation of the dam structure at Sandy Lake Dam. Rehabilitation tasks include repair of deteriorated concrete, removal and replacement of stoplogs in the lock bay, installation of new slide gates and a stoplog dewatering system in six sluice bays, installation of a duel-leaf slide gate in the log sluice bay, removal of the upstream timber apron, installation of a new upstream concrete apron, installation of a new sheet pile cutoff, and installation of three-phase electrical power to the dam, including new gate controls. A new power panel and operator controls will be located in an existing pump house building – a portion of which will need to be enclosed with this project to provide a suitable sheltered environment.
Notice history
| Notice | Type | Posted |
|---|---|---|
| Sandy Lake Dam Rehab Project | Award Notice | |
| Sandy Lake Dam Rehab Project | Solicitation | |
| Sandy Lake Dam Rehab Project | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity