Runway Rubber Removal & Repainting
Awarded Award Notice Posted
- Solicitation number
- FA4608-16-R-0026
- Agency
- Global Strike Command Air Force, Department of Defense
- Awarded
- to Babcock Sdv, LLC
- Set-aside
- Service-Disabled Veteran-Owned Small Business
Opportunity facts
- Contract number
- FA4608-16-P-0048 Federal contract award
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- PSC
- Not on record
- Place of performance
- Barksdale AFB, LA Barksdale AFB, Louisiana 71110, United States
Notice details come from SAM.gov. Updated .
Notice text
4 versions
Update #4 · Latest ·
Added: Aug 30, 2016 11:55 am
QUESTION 1: How do I acknowledge your amendment to add attachment 6 into this solicitation when you did not send a SF30?
ANSWER 1: If you read in section J of the solicitation, the attachment was listed correctly. However, it was not added in the fbo.gov solicitation as an attachment until it was identified to be missing from the attachment list on fbo.gov. To acknowledge it, simply send the completed attachment with your proposal.
QUESTION 2: What is the due date? Is it 6 September 2016 or 10 October 2016?
ANSWER 2: 6 September 2016 at the time specified on fbo.gov and in the solicitation.
Update #3 ·
Added: Jul 18, 2016 6:07 pm
Modified: Aug 02, 2016 5:56 pmTrack Changes
The NAICS for this project is 237310 and the small business size standard is $36.5M. Work consists of the removal of rubber deposits on both the north and south ends of the runway. All white runway markings, excluding the edge lines, will be partially paint removed to knock off any non-adhered paint. The centerline stripes that fall within the rubber removal area will be completely removed during the rubber removal process. Contractor will be required to repaint the runway markings in accordance with the Statement of Work. Work will take place on the runway at Barksdale AFB, LA.
The contractor is required to provide all labor, equipment, transportation, materials, quality control, and supervision necessary to fulfill the requirement at Barksdale AFB, Louisiana, in accordance with the project statement of work. The Request for Proposal will be available on or about 2 August 2016. The Request for Proposal will close on 6 September 2016 @3:00pm CST. The Performance Period for this project is based on the scheduled airfield closure dates. Work is typically done over a long weekend or holidays. If work is not completed it will continue to the next scheduled airfield shutdown dates. This acquisition is set-aside 100% for Service Disabled Vereran-Owned Small Business in accordance with FAR Part 19.14. The Request for Proposal will be available by electronic transmission only at www.fbo.gov. Potential contractors must be currently registered in the System for Award Management (SAM) to be eligible for award; see webpage www.sam.gov. All proposals shall be valid for 120 calendar days after the Request for Proposal closing to be considered responsive. The magnitude of this project is between $100,000.00 and $250,000.00.
Update #2 ·
Added: Jul 18, 2016 6:07 pm
Modified: Jul 22, 2016 9:33 amTrack Changes
The NAICS for this project is 237310 and the small business size standard is $36.5M. Work consists of the removal of rubber deposits on both the north and south ends of the runway. All white runway markings, excluding the edge lines, will be partially paint removed to knock off any non-adhered paint. The centerline stripes that fall within the rubber removal area will be completely removed during the rubber removal process. Contractor will be required to repaint the runway markings in accordance with the Statement of Work. Work will take place on the runway at Barksdale AFB, LA.
The contractor is required to provide all labor, equipment, transportation, materials, quality control, and supervision necessary to fulfill the requirement at Barksdale AFB, Louisiana, in accordance with the project statement of work. The Request for Proposal will be available on or about 2 August 2016. The Request for Proposal will close on or about 1 September 2016. The Performance Period for this project is based on the scheduled airfield closure dates. Work is typically done over a long weekend or holidays. If work is not completed it will continue to the next scheduled airfield shutdown dates. This acquisition is set-aside 100% for Service Disabled Vereran-Owned Small Business in accordance with FAR Part 19.14. The Request for Proposal will be available by electronic transmission only at www.fbo.gov. Potential contractors must be currently registered in the System for Award Management (SAM) to be eligible for award; see webpage www.sam.gov. All proposals shall be valid for 120 calendar days after the Request for Proposal closing to be considered responsive. The magnitude of this project is between $100,000.00 and $250,000.00.
Update #1 ·
Added: Jul 18, 2016 6:07 pm
The NAICS for this project is 237310 and the small business size standard is $36.5M. Work consists of the removal of rubber deposits on both the north and south ends of the runway. All white runway markings, excluding the edge lines, will be partially paint removed to knock off any non-adhered paint. The centerline stripes that fall within the rubber removal area will be completely removed during the rubber removal process. Contractor will be required to repaint the runway markings in accordance with the Statement of Work. Work will take place on the runway at Barksdale AFB, LA.
The contractor is required to provide all labor, equipment, transportation, materials, quality control, and supervision necessary to fulfill the requirement at Barksdale AFB, Louisiana, in accordance with the project statement of work. The Request for Proposal will be available on or about 2 August 2016. The Request for Proposal will close on or about 1 September 2016. The Performance Period for this project is based on the scheduled airfield closure dates. Work is typically done over a long weekend or holidays. If work is not completed it will continue to the next scheduled airfield shutdown dates. This acquisition is set-aside 100% for HubZone certified Small Businesses in accordance with FAR Part 19.13. The Request for Proposal will be available by electronic transmission only at www.fbo.gov. Potential contractors must be currently registered in the System for Award Management (SAM) to be eligible for award; see webpage www.sam.gov. All proposals shall be valid for 120 calendar days after the Request for Proposal closing to be considered responsive. The magnitude of this project is between $100,000.00 and $250,000.00.
Attachments
| File | Type | Posted |
|---|---|---|
| Questions_and_Answers.docx | DOCX document | |
| Attachment_6_-_Insurance_Form.pdf | ||
| Attachment_7_-_Wage_Determination_LA160014.pdf | ||
| Attachment_5_-_AF66.pdf | ||
| Attachment_1_-_Specifications_04_2.pdf | ||
| Attachment_3_-_North_ _South_Runway_Diagram.pdf | ||
| Attachment_7_-_Wage_Determination_LA160014.pdf | ||
| Attachment_8_-_Special_Contract_Requirements.pdf | ||
| Attachment_2_-_Specifications_97_17.pdf | ||
| Attachment_4_-_Environmental_Req'ts_(Jun_16).pdf | ||
| FA4608-16-R-0026_-_RFP_Fall_Rubber_Removal.pdf |
Show all 11
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity