Rip Rap for John Martin Dam
Awarded Award Notice Posted
- Solicitation number
- W912PP-16-T-0099
- Agency
- ENDIST Albuquerque US Army Corps of Engineers, Department of Defense
- Awarded
- to Tezak Heavy Equipment, LLC
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- W912PP16P0087 Federal contract award
- NAICS code
- 212319 Other Crushed and Broken Stone Mining and Quarrying
- PSC
- Not on record
- Place of performance
- 29955 County Rd. 25.75 Hasty, Colorado 81044, United States
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
Added: Aug 18, 2016 12:45 pm Modified: Aug 23, 2016 5:26 pmTrack Changes
Statement of Requirements (SOR)
John Martin Dam Rip Rap
1.0 General: The US Army Corps of Engineers, Albuquerque District, is in need of 2,400 tons of granite riprap, per the requirements listed below. The delivery location below is in Hasty, Colorado for the John Martin Lake Project.
1.1 Description of Requirements: The 2,400 tons of Riprap must meet the following minimum requirements.
• Quantity:
o 800 tons Granite rip rap ranging in size from 9" to 22"
o 800 tons Granite rip rap ranging in size from 18" to 24"
o 800 tons Granite rip rap ranging in size from 24" to 36"
• Quality:
o Freeze-Thaw Durability: Rip rap shall have a percent loss of no more than 0.1% as measured by ASTM D5312-12
o Soundness: Rip rap shall have a percent loss of no more than 0.5% as measured by ASTM D5240
o Rip rap rock type, durability, and soundness shall be shown in test reports from the source quarry dated no more than 1 year prior to contract award date; test reports must be approved by the Operations POC prior to purchase and delivery of rip rap.
1.2 Delivery Location: 2,400 tons of granite rip rap shall be delivered to the location listed below, and as directed by the John Martin Maintenance Supervisor. Rip Rap shall be stockpiled such that it can be moved safely by site personnel with available equipment; coordinate with the Maintenance Supervisor on this requirement.
Latitude: 38° 3'17.11"N, Longitude: 102°56'5.95"W (See image of location below).
1.3 Delivery Time: Riprap shall be delivered within 45 calendar days of date of contract award.
1.4 Submittals: Riprap quality testing reports as described in Section 1.1 shall be submitted for each material gradation with the offeror's bid. After award and upon delivery the Contractor shall submit reports showing quality test results as well as tickets showing tonnage of each gradation delivered.
1.5 Points of Contact:
This Riprap is for the USACE - John Martin Lake Project
29955 County Rd. 25.75
Hasty, CO 81044
(719) 336-3476
Lake Manager: Karen Downey
Karen.S.Downey@usace.army.mil
(719) 336-3476
Maintenance Supervisor: Kerry Roesch
Kerry.P.Roesch@usace.army.mil
(719) 336-3476
Operations POC: Tracy Aragon
Tracy.R.Aragon@usace.army.mil
(505) 342-3319
1.6 Invoices: Invoices shall be provided to the following:
• CEFC-L4invoices@usace.army.mil
• Gari.S.Wells@usace.army.mil
• Tracy.R.Aragon@usace.army.mil
• Bernadette.L.Armijo@usace.army.mil
1.7 Bid Option 1: An additional 800 tons of Granite rip rap ranging in size from 18" to 24"
1.8 Bid Option 2: An additional 800 tons of Granite rip rap ranging in size from 24" to 36"
Update #1 ·
Added: Aug 18, 2016 12:45 pm
The US Army Corps of Engineers, Albuquerque District, is in need of 1,500 cubic yards of granite riprap, per the requirements listed below. Please note the delivery location below is in Hasty, Colorado for the John Martin Lake Project.
Description of Requirements: The 1,500 cubic yards of Riprap must meet the following minimum requirements.
• Quantity:
o 500 CY Granite rip rap ranging in size from 9" to 22"
o 500 CY Granite rip rap ranging in size from 18" to 24"
o 500 CY Granite rip rap ranging in size from 24" to 36"
• Quality:
o Freeze-Thaw Durability: Rip rap shall have a percent loss of no more than 0.1% as measured by ASTM D5312-12
o Soundness: Rip rap shall have a percent loss of no more than 0.5% as measured by ASTM D5240
o Rip rap rock type, durability, and soundness shall be shown in test reports from the source quarry dated no more than 1 year prior to contract award date; test reports must be approved by the Operations POC prior to purchase and delivery of rip rap.
Riprap shall be delivered within 45 calendar days of date of contract award to:
29955 County Rd. 25.75
Hasty, CO 81044
(719) 336-3476
Attachments
| File | Type | Posted |
|---|---|---|
| Amendment0001.pdf | ||
| SolicitationW912PP-16-T-0099.pdf |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity