Amendment0001.pdf
PDF 45 KB Posted
- Attached to
- Rip Rap for John Martin Dam Federal contract opportunity
- Solicitation number
- W912PP-16-T-0099
About this file
Amendment 0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SolicitationW912PP-16-T-0099.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
a. REASON FOR CHANGE: This amendment is being issued to modify the Statement of Requirements and to extend the due date for the quote to 2:00 PM, Monday, August 29, 2016. See Statement of Requirements, changes/additions have been highlighted.
b. All other terms and conditions remain unchanged.
////////////////////////////////////////LAST ITEM////////////////////////////////////////
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 23-Aug-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912PP-16-T-0099
X 9B. DATED (SEE ITEM 11)
17-Aug-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
23-Aug-2016
CODE
US ARMY ENGINEER DISTRICT, ALBUQUERQUE
4101 JEFFERSON PLAZA NE
ALBUQUERQUE NM 87109-3435
W912PP 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912PP-16-T-0099
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 26-Aug-2016 02:00 PM to 29-Aug-2016 02:00 PM.
SUPPLIES OR SERVICES AND PRICES
CLIN 0002
The CLIN extended description has changed from Additional 500 CY Granite rip rap ranging in size from 18” to 24”**Option 1, if awarded, shall have the same delivery period as the items included in Line Item 0001 and would not require a seprate delivery charge.** to Additional 500 CY (800 Tons) Granite rip rap ranging in size from 18” to 24”**Option 1, if awarded, shall have the same delivery period as the items included in Line Item 0001 and would not require a seprate delivery charge.**.
CLIN 0003
The CLIN extended description has changed from Additional 500 CY Granite rip rap ranging in size from 24” to 36”**Option 2, if awarded, shall have the same delivery period as the items included in Line Item 0001 and would not require a seprate delivery charge.** to Additional 500 CY (800 tons)Granite rip rap ranging in size from 24” to 36”**Option 2, if awarded, shall have the same delivery period as the items included in Line Item 0001 and would not require a seprate delivery charge.**.
The following have been modified:
STATEMENT OF REQUIREMENT
Statement of Requirements (SOR)
John Martin Dam Rip Rap
1.0 General: The US Army Corps of Engineers, Albuquerque District, is in need of 2,400 tons of granite riprap, per the requirements listed below. The delivery location below is in Hasty, Colorado for the John Martin Lake Project.
1.1 Description of Requirements: The 2,400 tons of Riprap must meet the following minimum requirements.
Quantity:
o 800 tons Granite rip rap ranging in size from 9” to 22” o 800 tons Granite rip rap ranging in size from 18” to 24” o 800 tons Granite rip rap ranging in size from 24” to 36”
Quality:
o Freeze-Thaw Durability: Rip rap shall have a percent loss of no more than 0.1% as measured by
ASTM D5312-12
o Soundness: Rip rap shall have a percent loss of no more than 0.5% as measured by ASTM D5240 o Rip rap rock type, durability, and soundness shall be shown in test reports from the source quarry dated no more than 1 year prior to contract award date; test reports must be approved by the Operations POC prior to purchase and delivery of rip rap.
1.2 Delivery Location: 2,400 tons of granite rip rap shall be delivered to the location listed below, and as directed by the John Martin Maintenance Supervisor. Rip Rap shall be stockpiled such that it can be moved safely by site personnel with available equipment; coordinate with the Maintenance Supervisor on this requirement.
Latitude: 38° 3'17.11"N, Longitude: 102°56'5.95"W (See image of location below).
1.3 Delivery Time: Riprap shall be delivered within 45 calendar days of date of contract award.
1.4 Submittals: Riprap quality testing reports as described in Section 1.1 shall be submitted for each material gradation with the offeror’s bid. After award and upon delivery the Contractor shall submit reports showing quality test results as well as tickets showing tonnage of each gradation delivered.
1.5 Points of Contact:
This Riprap is for the USACE – John Martin Lake Project 29955 County Rd. 25.75
Hasty, CO 81044
(719) 336-3476
Lake Manager: Karen Downey Karen.S.Downey@usace.army.mil
(719) 336-3476
Maintenance Supervisor: Kerry Roesch Kerry.P.Roesch@usace.army.mil
(719) 336-3476
Operations POC: Tracy Aragon Tracy.R.Aragon@usace.army.mil
(505) 342-3319
1.6 Invoices: Invoices shall be provided to the following:
CEFC-L4invoices@usace.army.mil Gari.S.Wells@usace.army.mil Tracy.R.Aragon@usace.army.mil Bernadette.L.Armijo@usace.army.mil
1.7 Bid Option 1: An additional 800 tons of Granite rip rap ranging in size from 18” to 24”
1.8 Bid Option 2: An additional 800 tons of Granite rip rap ranging in size from 24” to 36”
(End of Summary of Changes)