Rice Creek Road Restoration

Awarded Award Notice Posted

Solicitation number
AG-82B1-S-09-0048
Agency
Operations Center Intermountain Economic Recovery Operations, Department of Agriculture
Awarded
to Kesler Construction Inc.
Set-aside
HUBZone

Opportunity facts

Contract number
AG-82B1-C-09-0062 Federal contract award
NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Not on record
Place of performance
Boise National Forest Cascade Ranger District Cascade, Idaho 83611, United States

Notice details come from SAM.gov. Updated .

Notice text

Added: Jul 14, 2009 5:00 pm The USDA Forest Service, Boise National Forest, intends to acquire by contract the restoration of Rice Creek Road. The project consists of clearing, cofferdam construction, culvert excavation and backfill, placing riprap, providing the associated soil erosion and pollution control, embankment and roadway construction, borrow excavation, aggregate surfacing, waste material disposal, providing and installing construction warning (traffic control) signs, applying seed mix and mulch, and cleanup.



The project site can be reached by taking Highway 55 from Boise, Idaho to the junction Forest Highway 22. Take Forest Highway 22 (Warm Lake Highway) east to the junction of National Forest System Road (NSFR) 474 (near Warm Lake). Take NSFR 474 south approximately 2 miles to intersection with NFSR #409. The project begins on NFSR #474 to NFSR #478 approximately 5.62 miles. Project continues on NFSR # 478 for 2.81 miles to the project termini. From Boise, the total distance is approximately 105 miles on pavement and 2 miles on gravel roads.





The Forest Service intends to issue a solicitation for this project utilizing FAR Part 14 procedures for sealed bidding. This acquisition is 100 percent set-aside for HUBzone Business concerns. A single firm-fixed price type contract will be awarded to the responsible Bidder (IAW FAR Part 9, Contractor Qualifications) whose bid is of the lowest total price that meets the technical requirements outlined in the solicitation.



Payment Protection will be required for this project and Davis-Bacon wage rates will apply to any resulting contract. This solicitation will be available on or about July 28, 2009. The period of performance for this project will be 365 days from issuance of a Notice to Proceed, which is anticipated to be issued on or about September 15, 2009.



All responsible sources may submit a bid which will be considered by the government. In accordance with FAR 4.1102(a), prospective contractors must be registered in the Central Contractor Registration (CCR) database prior to award of a contract. Lack of registration in the CCR on the part of the bidder will render a bidder ineligible for award. Bidders may obtain information on registration and annual confirmation requirements by calling 888-227-2423, or via the Internet at http://www.ccr.gov//.

Attachments

Files attached to this notice, newest first
File Type Posted
J5_FS ARRA SIGN DETAILS.pdf PDF
Wage Determination —
J3_fire precautions.doc DOC document
J2.Rice Creek Road Restoration Project FSSS.doc DOC document
AG-82B1-S-09-0048.doc DOC document
J1.Rice Creek Road Project Plans.pdf PDF
SF1442.pdf PDF

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity