Replace Semi-Portable Ramp with Permanent Ramp at Track 5
Awarded Award Notice Posted
- Solicitation number
- W911SA-17-B-2006
- Agency
- MICC Fort McCoy Mission and Installation Contracting Command, Department of Defense
- Awarded
- to RHI LLC
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- W911SA-17-C-2022 Federal contract award
- NAICS code
- 238110 Poured Concrete Foundation and Structure Contractors
- PSC
- Not on record
- Place of performance
- Fort McCoy, Wisconsin 54656, United States
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
Added: Jul 05, 2017 12:49 pm Solicitation posted 7/5/17 MMH
Update #1 ·
Added: Jun 14, 2017 8:25 am
The Mission and Installation Contracting Command Center, Fort McCoy, Wisconsin has a requirement to Replace Semi-Portable Ramp with Permanent Ramp at Track 5.Work to be performed under this firm, fixed price contract will be within the North American Industry Classification System (NAICS) Code 238110 with a small business size standard of $15,000,000.
Solicitation W911SA-17-B-2006 will be issued as an Invitation for Bids (IFB) using the procedures outlined in Federal Acquisition Regulation (FAR) Part 14. It is anticipated that this requirement will be awarded as a single award, firm fixed-price contract.
This solicitation will be a 100% Small Business Set aside.
Project magnitude is over $250,000.00 and $500,000.00
Period of Performance will be 80 days after the notice to proceed.
MICC Fort McCoy intends to issue the solicitation within 60 days of this pre solicitation notice. The site visit date and time will be provided with the solicitation once it is issued.
Do not contact the Contract Specialist for requests to change the set aside or to state your interest. Parties interested in the solicitation should access the web page (fbo.gov) for the future issuance of the solicitation, associated documents, and solicitation amendments; contractors will not be directly notified of solicitation amendments.
Attachments
| File | Type | Posted |
|---|---|---|
| W911SA-17-B-2006_Preliminary_Bid_Opening_Results.pdf | ||
| W911SA-17-B-2006_Attachment_One_AT_OPSEC.pdf | ||
| W911SA-17-B-2006_Attachment_Four_Wage_Determination.docx | DOCX document | |
| W911SA-17-B-2006_Attachment_Five_SF_24.pdf | ||
| W911SA-17-B-2006_Solicitation.docx | DOCX document | |
| W911SA-17-B-2006_Attachment_Three_Drawings.pdf | ||
| W911SA-17-B-2006_Attachment_Two_Specifications.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Replace Semi-Portable Ramp with Permanent Ramp at Track 5 | Award Notice | |
| Replace Semi-Portable Ramp with Permanent Ramp at Track 5 | Award Notice |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity