Repair/Relocate/Replace Sluice Gate Controls

Closed Solicitation Posted

Solicitation number
FA446022Q0007
Agency
Air Mobility Command Air Force, Department of Defense
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
811310 Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance
PSC
J063 Maint/Repair/Rebuild Of Equipment- Alarm, Signal, And Security Detection Systems
Place of performance
Little Rock AFB, Arkansas 72099, United States

Notice details come from SAM.gov. Updated .

Notice text

4 versions

Update #4 · Latest ·

AMENDMENT 1 - 6/17/2022 

The purpose of this amendment is to include questions regarding part numbers with photos of the elctrical panel. 

________________________________________________________________

AMENDMENT 1 - 6/16/2022 

The purpose of this amendment is to extend the offers due date from 6/17/2022 to 6/24/2022

________________________________________________________________

AMENDMENT 1 - 5/25/2022 

The purpose of this amendment is to include a site visit scheduled for the 7th of June @ 9:00 am. Due to limited parking please meet at the Little Rock AFB visitors center where a shuttle will transport you to the site. PLEASE NOTE: The shuttle will only perform one round trip so please be ready to go by 9:10 am or you will miss the site visit. You will be required to get a bas access pass. Please bring a valid form of ID (Drivers license or State ID).

__________________________________________________________________

The contractor shall furnish four (4) D-21 Monaco control panels, motherboards, zone cards, power supply, battery backup, panel enclosures, wire, cable, unistrut rack, conduit and any other components or parts needed for full operational status of the sluice gates, excluding gate motors. All enclosures, conduit, and other electrical or control material must be rated for use in wet outdoor locations. At each of the four gates, the contractor shall remove existing control units, enclosures, and mounts, install new enclosures, mounts, and Monaco control panels and components at a new height of 80 inches above the walkway (approximately 40 inches above current height). The contractor shall raise the lightning arrestor, antenna, and cable to a height of 80 inches above the walkway and replace antenna, lightning arrestor, and cable if needed. The contractor shall lengthen or replace electrical connection from the panel to the component enclosures as needed. The contractor shall program the new panels and complete a full test of the system to ensure full turn-key operation and connection to the Little Rock AFB Fire Department for remote operation of the sluice gates. The contractor is not responsible for relocation or raising of the electrical panels or replacement of the gate control motors if non-operational.

Update #3 ·

AMENDMENT 1 - 6/16/2022 

The purpose of this amendment is to extend the offers due date from 6/17/2022 to 6/24/2022

________________________________________________________________

AMENDMENT 1 - 5/25/2022 

The purpose of this amendment is to include a site visit scheduled for the 7th of June @ 9:00 am. Due to limited parking please meet at the Little Rock AFB visitors center where a shuttle will transport you to the site. PLEASE NOTE: The shuttle will only perform one round trip so please be ready to go by 9:10 am or you will miss the site visit. You will be required to get a bas access pass. Please bring a valid form of ID (Drivers license or State ID).

__________________________________________________________________

The contractor shall furnish four (4) D-21 Monaco control panels, motherboards, zone cards, power supply, battery backup, panel enclosures, wire, cable, unistrut rack, conduit and any other components or parts needed for full operational status of the sluice gates, excluding gate motors. All enclosures, conduit, and other electrical or control material must be rated for use in wet outdoor locations. At each of the four gates, the contractor shall remove existing control units, enclosures, and mounts, install new enclosures, mounts, and Monaco control panels and components at a new height of 80 inches above the walkway (approximately 40 inches above current height). The contractor shall raise the lightning arrestor, antenna, and cable to a height of 80 inches above the walkway and replace antenna, lightning arrestor, and cable if needed. The contractor shall lengthen or replace electrical connection from the panel to the component enclosures as needed. The contractor shall program the new panels and complete a full test of the system to ensure full turn-key operation and connection to the Little Rock AFB Fire Department for remote operation of the sluice gates. The contractor is not responsible for relocation or raising of the electrical panels or replacement of the gate control motors if non-operational.

Update #2 ·

AMENDMENT 1 - 5/25/2022 

The purpose of this amendment is to include a site visit scheduled for the 7th of June @ 9:00 am. Due to limited parking please meet at the Little Rock AFB visitors center where a shuttle will transport you to the site. PLEASE NOTE: The shuttle will only perform one round trip so please be ready to go by 9:10 am or you will miss the site visit. You will be required to get a bas access pass. Please bring a valid form of ID (Drivers license or State ID).

__________________________________________________________________

The contractor shall furnish four (4) D-21 Monaco control panels, motherboards, zone cards, power supply, battery backup, panel enclosures, wire, cable, unistrut rack, conduit and any other components or parts needed for full operational status of the sluice gates, excluding gate motors. All enclosures, conduit, and other electrical or control material must be rated for use in wet outdoor locations. At each of the four gates, the contractor shall remove existing control units, enclosures, and mounts, install new enclosures, mounts, and Monaco control panels and components at a new height of 80 inches above the walkway (approximately 40 inches above current height). The contractor shall raise the lightning arrestor, antenna, and cable to a height of 80 inches above the walkway and replace antenna, lightning arrestor, and cable if needed. The contractor shall lengthen or replace electrical connection from the panel to the component enclosures as needed. The contractor shall program the new panels and complete a full test of the system to ensure full turn-key operation and connection to the Little Rock AFB Fire Department for remote operation of the sluice gates. The contractor is not responsible for relocation or raising of the electrical panels or replacement of the gate control motors if non-operational.

Update #1 ·

The contractor shall furnish four (4) D-21 Monaco control panels, motherboards, zone cards, power supply, battery backup, panel enclosures, wire, cable, unistrut rack, conduit and any other components or parts needed for full operational status of the sluice gates, excluding gate motors. All enclosures, conduit, and other electrical or control material must be rated for use in wet outdoor locations. At each of the four gates, the contractor shall remove existing control units, enclosures, and mounts, install new enclosures, mounts, and Monaco control panels and components at a new height of 80 inches above the walkway (approximately 40 inches above current height). The contractor shall raise the lightning arrestor, antenna, and cable to a height of 80 inches above the walkway and replace antenna, lightning arrestor, and cable if needed. The contractor shall lengthen or replace electrical connection from the panel to the component enclosures as needed. The contractor shall program the new panels and complete a full test of the system to ensure full turn-key operation and connection to the Little Rock AFB Fire Department for remote operation of the sluice gates. The contractor is not responsible for relocation or raising of the electrical panels or replacement of the gate control motors if non-operational.

Attachments

Files attached to this notice, newest first
File Type Posted
Questions.pdf PDF
Solicitation - FA446022Q0007.pdf PDF
PWS Sluice gates.pdf PDF
Wage Determination Rev 19.pdf PDF

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity