RECOVERY - Construct Main Floodway Levees (23rd St - FM 1015)
Awarded Award Notice Posted
- Solicitation number
- IBM09B0005
- Awarded
- to Longhorn Excavators Inc.
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- IBM09C0015 Federal contract award
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Not on record
- Place of performance
- Hidalgo County, Texas, United States
Notice details come from SAM.gov. Updated .
Notice text
3 versions
Update #3 · Latest ·
Added: May 11, 2009 3:23 pm Modified: Jun 26, 2009 8:02 pmTrack Changes
RECOVERY - This project is UNRESTRICTED. The magnitude of this project is between $25 million and $50 million. Provide all plant, labor and material for the construction of the Main floodway Levees (23rd St - FM 1015) in Hidalgo County Texas. This 43.2 mile levee reach has an estimated magnitude between $25 million and $50 million. Performance period is 367 calendar days. Work consists of preparation of removal and stockpiling, if suitable for reuse, of gravel/topsoil/caliche or riprap; removal of existing pavements and structures; clearing and grubbing, installation and maintenance of erosion control measures; silt fencing; construction entrances and exits. Work includes benched excavation; placement of embankment; placement of topsoil and riprap; and seeding of disturbed areas. Solicitation, plans and specifications have been posted on June 26, 2009. All responsible sources may submit a bid which shall be considered by the agency.
Update #2 ·
Added: May 11, 2009 3:23 pm Modified: Jun 12, 2009 10:30 amTrack Changes
RECOVERY - This project is UNRESTRICTED. The magnitude of this project is between $25 million and $50 million. Provide all plant, labor and material for the construction of the Main floodway Levees (23rd St - FM 1015) in Hidalgo County Texas. This 43.2 mile levee reach has an estimated magnitude between $25 million and $50 million. Performance period is 367 calendar days. Work consists of preparation of removal and stockpiling, if suitable for reuse, of gravel/topsoil/caliche or riprap; removal of existing pavements and structures; clearing and grubbing, installation and maintenance of erosion control measures; silt fencing; construction entrances and exits. Work includes benched excavation; placement of embankment; placement of topsoil and riprap; and seeding of disturbed areas. Solicitation, plans and specifications will be posted on or before June 19, 2009. All responsible sources may submit a bid which shall be considered by the agency.
Update #1 ·
Added: May 11, 2009 3:23 pm
RECOVERY - This project is UNRESTRICTED. The magnitude of this project is between $25 million and $50 million. Provide all plant, labor and material for the construction of the Main floodway Levees (23rd St - FM 1015) in Hidalgo County Texas. This 43.2 mile levee reach has an estimated magnitude between $25 million and $50 million. Performance period is 367 calendar days. Work consists of preparation of removal and stockpiling, if suitable for reuse, of gravel/topsoil/caliche or riprap; removal of existing pavements and structures; clearing and grubbing, installation and maintenance of erosion control measures; silt fencing; construction entrances and exits. Work includes benched excavation; placement of embankment; placement of topsoil and riprap; and seeding of disturbed areas. Solicitation, plans and specifications will be posted on or before June 2, 2009. All responsible sources may submit a bid which shall be considered by the agency.
Attachments
Show all 50
This notice has more attachments on GovTribe.
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity