Patrick SFB CATM Exhaust Duct Replacement
Closed Solicitation Posted
- Solicitation number
- FA252122QA022
- Agency
- Air Force Space Command Air Force, Department of Defense
- Responses due
- Set-aside
- Service-Disabled Veteran-Owned Small Business
Opportunity facts
- NAICS code
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
- PSC
- J041 Maint/Repair/Rebuild Of Equipment- Refrigeration, Air Conditioning, And Air Circulating Equipment
- Place of performance
- Patrick AFB, Florida 32925, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The solicitation seeks quotes to replace deteriorated exhaust ductwork from two fans at the Combined Arms Military Training facility on Patrick Space Force Base in Florida. The Department of the Air Force Space Command is procuring these exhaust duct replacement services on a firm-fixed price basis. Quotes are due by September 9th and the period of performance is 30 days. The award will be made to the responsible offeror providing the lowest technically acceptable quote.
This is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses. The NAICS code is 238210 and the PSC code covers construction of non-residential structures. The place of performance is Patrick Space Force Base in Brevard County, Florida. The statement of work details requirements for site work, demolition, new ductwork installation with vibration eliminators and weatherproof insulation, inspections and safety compliance to be completed between August 26th and September 24th, 2022.
Notice text
The required services will take place on Patrick Space Force Base (PSFB) B9693 CATM (GunRange). Scope of work requested is the removal and installation of ductwork attached to exhaust fans 1 & 2. Current ductwork is deteriorated to due wore/ tear from vibration of the unit and the corrosive marine environment in which B9693 is located (Refer to pics section 3). The scope of this project is to remove the existing ductwork of both exhaust fans, install new duct work to include vibration eliminators and weather proof insulation.
Attachments
| File | Type | Posted |
|---|---|---|
| 22QA022Combined Synopsis.pdf | ||
| Atch 2 - SCA WD 2015-4555 Rev17_27Jun2022.pdf | ||
| Atch 1 - CATM Exhaust Duct SOW.pdf |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity