Osgood Stewardship IRSC

Awarded Award Notice Posted

Solicitation number
AG-9JGP-S-17-4012
Agency
Region 5 - Pacific Southwest Region Forest Service, Department of Agriculture
Awarded
to C.t.l. Forest Management, Inc.
Set-aside
No set-aside

Opportunity facts

Contract number
AG-9JGP-C-17-4012 Federal contract award
NAICS code
113310 Logging
PSC
Not on record
Place of performance
The project area (483 acres) is located on the South Shore of Lake Tahoe. The legal locations are: Township 12N, Range 17E, Sections 12, 25 & 36, and Township 12N, Range 18E, Sections 7, 15, 21, 23, 26, 27, 30 & 31 (Mdbm) Mount Diablo Base and Meridian. All treatment areas are between elevations of approximately 6,320 feet-7,080 feet. Access to the units is from Fallen Leaf Rd., Tahoe Mountain Rd., Nez Pierce Dr., Oneidas St., and forest roads 12N20, 12N20C, 1201, 12N17, & 12N08. South Lake Tahoe, California, United States

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

Added: Apr 25, 2017 3:16 pm Modified: May 10, 2017 5:47 pmTrack Changes The solicitation and any resultant contract will be a stewardship project in accordance with Section 323 of Public Law 108-7 (16 U.S.C. 2104 Note, as revised February 28, 2003 to reflect sec. 323 of J.J. Res 2 as enrolled), the Consolidated Appropriations Resolution, 2003, amending Public Law 105-277, sec 347.

This is a commercial item acquisition that has been tailored to fit the Government's method of trading goods for services. Work includes 23 mandatory activity bid items that will be treated in addition to thinning and removal of commercial sawlogs on 483 acres. Treatment areas consist of natural stands. The intent of the contract is to conduct commercial tree thinning and reduce hazardous fuels. Commercial thinning will be accomplished through cutting and removal of individually designated trees. Reduction of hazardous fuels will be accomplished by thinning and removal of small conifers and treatment of activity and existing slash and biomass. Completion of associated erosion control and road maintenance work will be required for all operations. Brush treatment is not a bid item and is not a requirement of this contract.


It is the intent of this contract to both remove and dispose of as much activity and existing slash and other biomass generated from operations as feasible so as to limit the amount of post-contract government slash burning. Whole tree removal of small trees, and removal of top portions and limbs of larger trees to the landing will be required. Removal of existing dead and down to the landing will be required, while retaining what is necessary to meet wildlife requirements. Other slash treatment methods may be utilized only with contract administrator approval. Such methods may include masticating/chipping, piling, or lopping and scattering of slash and biomass material.


The project area (483 acres) is located on the South Shore of Lake Tahoe. The legal locations are: Township 12N, Range 17E, Sections 12, 25 & 36, and Township 12N, Range 18E, Sections 7, 15, 21, 23, 26, 27, 30 & 31 (MDBM) Mount Diablo Base and Meridian. All treatment areas are between elevations of approximately 6,320 feet-7,080 feet. Access to the units is from Fallen Leaf Rd., Tahoe Mountain Rd., Nez Pierce Dr., Oneidas St., and forest roads 12N20, 12N20C, 1201, 12N17, & 12N08.


The date of award is expected to be within 60 days after the actual response date, which is stated in the package and may possibly be changed in one or more amendments.


Please hold any technical questions until after review of the solicitation. The technical contact information will be listed in the solicitation.


The purpose of this notice is to meet the FAR 5.201


It is the contractor's responsibility to monitor the Federal Business Opportunities website for any changes or amendments.

Update #1 ·

Added: Apr 25, 2017 3:16 pm The solicitation and any resultant contract will be a stewardship project in accordance with Section 323 of Public Law 108-7 (16 U.S.C. 2104 Note, as revised February 28, 2003 to reflect sec. 323 of J.J. Res 2 as enrolled), the Consolidated Appropriations Resolution, 2003, amending Public Law 105-277, sec 347.

This is a commercial item acquisition that has been tailored to fit the Government's method of trading goods for services. Work includes 23 mandatory activity bid items that will be treated in addition to thinning and removal of commercial sawlogs on 483 acres. Treatment areas consist of natural stands. The intent of the contract is to conduct commercial tree thinning and reduce hazardous fuels. Commercial thinning will be accomplished through cutting and removal of individually designated trees. Reduction of hazardous fuels will be accomplished by thinning and removal of small conifers and treatment of activity and existing slash and biomass. Completion of associated erosion control and road maintenance work will be required for all operations. Brush treatment is not a bid item and is not a requirement of this contract.


It is the intent of this contract to both remove and dispose of as much activity and existing slash and other biomass generated from operations as feasible so as to limit the amount of post-contract government slash burning. Whole tree removal of small trees, and removal of top portions and limbs of larger trees to the landing will be required. Removal of existing dead and down to the landing will be required, while retaining what is necessary to meet wildlife requirements. Other slash treatment methods may be utilized only with contract administrator approval. Such methods may include masticating/chipping, piling, or lopping and scattering of slash and biomass material.


The project area (483 acres) is located on the South Shore of Lake Tahoe. The legal locations are: Township 12N, Range 17E, Sections 12, 25 & 36, and Township 12N, Range 18E, Sections 7, 15, 21, 23, 26, 27, 30 & 31 (MDBM) Mount Diablo Base and Meridian. All treatment areas are between elevations of approximately 6,320 feet-7,080 feet. Access to the units is from Fallen Leaf Rd., Tahoe Mountain Rd., Nez Pierce Dr., Oneidas St., and forest roads 12N20, 12N20C, 1201, 12N17, & 12N08.


The solicitation package will be uploaded when ready, approximately May 9, 2017. The date of award is expected to be within 60 days after the actual response date, which will be stated in the package and possibly changed in one or more amendments.


Please hold any technical questions until after review of the solicitation. The technical contact information will be listed in the solicitation.


The purpose of this notice is to meet the FAR 5.201


It is the contractor's responsibility to monitor the Federal Business Opportunities website for any changes or amendments.

Attachments

Files attached to this notice, newest first
File Type Posted
9_Osgood_Fire_Plan.docx DOCX document
7_Osgood_Appendix_C_T-Specs_810.pdf PDF
1_Osgood_IRSC_Solicitation.docx DOCX document
4_Osgood_APPENDIX_C_Rd_Maint_Erosion.docx DOCX document
6_Osgood_Appendix_C_T-Specs_803.pdf PDF
8_Wage_Determination.pdf PDF
10_Wet_Weather_Agreement.doc DOC document
5_Osgood_Appendix_C_T-Specs.doc DOC document
3_Osgood_Appendix_B.doc DOC document
2_Osgood_APPENDIX_A.docx DOCX document

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity