Oceanside Harbor Maintenance Dredging
Closed Pre-Solicitation Posted
- Solicitation number
- W912PL22R0008
- Agency
- ENDIST Los Angeles US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Y1KF Construction Of Dredging Facilities
- Place of performance
- Oceanside, California, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This pre-solicitation notice is for annual maintenance dredging of navigation channels within Oceanside Harbor in San Diego County, California. The U.S. Army Corps of Engineers Engineering District Los Angeles will solicit bids to dredge approximately 250,000 cubic yards annually from the Entrance Channel, Del Mar Channel, and Oceanside Channel over a four year period from 2022 through 2025. Dredged material will be beneficially reused as beach fill along Oceanside Beach. Offerors must submit separate technical and price proposals by January 2022 which will be evaluated using low price technically acceptable procedures.
There is no set-aside designation for this procurement. The NAICS code is 237990 and PSC code is D203 for dredging services. The estimated value for each annual dredging cycle ranges from $1 million to $5 million to be completed within approximately 55 days. Dredging quantities average 250,000 cubic yards removed annually with authorized depths for the channels ranging from 20 to 30 feet below mean lower low water. Price evaluation preference will be given to HUBZone small businesses for this unrestricted full and open competition.
Notice text
3 versions
Update #3 · Latest ·
Amendment 0001 issued 2/8/2022
Oceanside Harbor Maintenance Dredging, San Diego County, California. This projects consists of maintenance dredging of the federal navigation channels within Oceanside Harbor. The navigation channels include the Entrance Channel, the Del Mar Channel leading to the Del Mar Boat Basin in Camp Pendleton and the Oceanside Channel leading to Oceanside Harbor. The dredged material will be beneficially reused as beach fill material on downcoast beaches. The material will be placed along Oceanside Beach centered about the Oceanside Pier with the placement area extending between North Coast Village Way and Wisconsin Avenue.
The contract will be structured with four annual cycles, base plus three options, to be executed in the spring of each year with a completion time of approximately 55 days per dredge cycle. The first cycle dredging of Oceanside Harbor is scheduled to occur in Spring 2022.Dredged quantities vary, but average approximately 250,000 cubic yards of material annually. The authorized channel depths are 20 feet below MLLW with advanced maintenance ranging from 25 to 30 feet below MLLW in the entrance channel.The estimated magnitude of construction for each Oceanside dredge cycle is between $1,000,000 - $5,000,000
This solicitation will be issued as an Unrestricted acquisition allowing for Full and Open Competition. Contract Clause No. FAR 52.219-4, entitled, Price Evaluation Preference for HUBZone Small Business Concerns will be applied to this procurement. The acquisition will use FAR Part 15 Contracting by Negotiation (Low Price Technically Acceptable) procedures for award. Offerors will be required to submit a technical and price proposal for source selection evaluation. The solicitation will be available on or about January 12, 2021. All offerors are advised that this project may be delayed, cancelled or revised at any time during the solicitation, selection, evaluation, negotiation and/or final award process.
Update #2 ·
Oceanside Harbor Maintenance Dredging, San Diego County, California. This projects consists of maintenance dredging of the federal navigation channels within Oceanside Harbor. The navigation channels include the Entrance Channel, the Del Mar Channel leading to the Del Mar Boat Basin in Camp Pendleton and the Oceanside Channel leading to Oceanside Harbor. The dredged material will be beneficially reused as beach fill material on downcoast beaches. The material will be placed along Oceanside Beach centered about the Oceanside Pier with the placement area extending between North Coast Village Way and Wisconsin Avenue.
The contract will be structured with four annual cycles, base plus three options, to be executed in the spring of each year with a completion time of approximately 55 days per dredge cycle. The first cycle dredging of Oceanside Harbor is scheduled to occur in Spring 2022.Dredged quantities vary, but average approximately 250,000 cubic yards of material annually. The authorized channel depths are 20 feet below MLLW with advanced maintenance ranging from 25 to 30 feet below MLLW in the entrance channel.The estimated magnitude of construction for each Oceanside dredge cycle is between $1,000,000 - $5,000,000
This solicitation will be issued as an Unrestricted acquisition allowing for Full and Open Competition. Contract Clause No. FAR 52.219-4, entitled, Price Evaluation Preference for HUBZone Small Business Concerns will be applied to this procurement. The acquisition will use FAR Part 15 Contracting by Negotiation (Low Price Technically Acceptable) procedures for award. Offerors will be required to submit a technical and price proposal for source selection evaluation. The solicitation will be available on or about January 12, 2021. All offerors are advised that this project may be delayed, cancelled or revised at any time during the solicitation, selection, evaluation, negotiation and/or final award process.
Update #1 ·
Oceanside Harbor Maintenance Dredging, San Diego County, California. This projects consists of maintenance dredging of the federal navigation channels within Oceanside Harbor. The navigation channels include the Entrance Channel, the Del Mar Channel leading to the Del Mar Boat Basin in Camp Pendleton and the Oceanside Channel leading to Oceanside Harbor. The dredged material will be beneficially reused as beach fill material on downcoast beaches. The material will be placed along Oceanside Beach centered about the Oceanside Pier with the placement area extending between North Coast Village Way and Wisconsin Avenue.
The contract will be structured with four annual cycles, base plus three options, to be executed in the spring of each year with a completion time of approximately 55 days per dredge cycle. The first cycle dredging of Oceanside Harbor is scheduled to occur in Spring 2022.Dredged quantities vary, but average approximately 250,000 cubic yards of material annually. The authorized channel depths are 20 feet below MLLW with advanced maintenance ranging from 25 to 30 feet below MLLW in the entrance channel.The estimated magnitude of construction for each Oceanside dredge cycle is between $1,000,000 - $5,000,000
This solicitation will be issued as an Unrestricted acquisition allowing for Full and Open Competition. Contract Clause No. FAR 52.219-4, entitled, Price Evaluation Preference for HUBZone Small Business Concerns will be applied to this procurement. The acquisition will use FAR Part 15 Contracting by Negotiation (Low Price Technically Acceptable) procedures for award. Offerors will be required to submit a technical and price proposal for source selection evaluation. The solicitation will be available on or about January 7, 2021. All offerors are advised that this project may be delayed, cancelled or revised at any time during the solicitation, selection, evaluation, negotiation and/or final award process.
Attachments
| File | Type | Posted |
|---|---|---|
| W912PL22R0008_Am01_Oceanside_Dredging.pdf | ||
| FIO_OS2021_11_cond.pdf | ||
| FIO_OS2021_11_cond-3ft.txt | TXT text file | |
| Plans_W912PL22R0008_Oceanside_Dredging.pdf | ||
| Spec_W912PL22R0008_Oceanside_Dredging.pdf |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity